CurbScoop
CurbScoopBuildingsLenox Hill1270 3 AVENUE

1270 3 AVENUE

Manhattan· Lenox Hill· built 1958class D4BBL 1014080033
Open listing source

1270 3 AVENUE is a 116-unit building in Lenox Hill, Manhattan, built in 1958.

3 units are on the market here right now.

City records show 30 DOB permits and 50 open violations on file.

Units (res)
116
Floors
19.0
Lot ft²
11,749 ft²
Bldg ft²
177,975 ft²
Assessed
$21.4M
DOF total
Comps L5y
0

Active sale listings (3)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
181 EAST 73 STREET #12A
Manhattan · built 1958
Lenox Hill$1.40M-0 ft²2 bd · 2 ba-58
7 DOBbedbug
10.2Source
181 EAST 73 STREET #17AB
Manhattan · built 1958
Lenox Hill$3.25M-0 ft²4 bd · 3 ba-56
7 DOBbedbug
10.2Source
181 EAST 73 STREET #11D
Manhattan · built 1958
Lenox Hill$1.20M-0 ft²2 bd · 2 ba-56
7 DOBbedbug
10.2Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING , 1st STORY
    Jan 22, 2023 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING., 1st STORY
    Jan 22, 2023 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT PHA, 21st STORY, 1st APARTMENT FROM EAST AT SOUTH
    Nov 20, 2020 · #PHA · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT PHA, 21st STORY, 1st APARTMENT FROM EAST AT SOUTH
    Nov 20, 2020 · #PHA · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT PHA, 21st STORY, 1st APARTMENT FROM EAST AT SOUTH
    Nov 20, 2020 · #PHA · NOV SENT OUT
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 24, 2016 · VIOLATION DISMISSED
  • A
    SECTION 27-2005 ADM CODE REFIT DOOR AT WEST BULKHEAD.
    Apr 21, 1989 · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE REFIT DOOR AT BASEMENT WEST.
    Apr 21, 1989 · NOV SENT OUT
  • B
    D26-19.07 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING NIGHT INSPECTION LIGHTS NOT ON.
    Apr 23, 1987 · NOV SENT OUT
  • B
    D26-19.07 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING NIGHT INSPECTION FIXTURES PRESENT. LIGHTS NOT ON.
    Jul 25, 1986 · NOV SENT OUT
DOB permits (last 30)
  • PLDec 26, 1997
    DOLE PLUMBING & HEATING CORP
  • ALDec 2, 1997
    HIGH POWER CONSTRUCTION CORP.
  • MHOct 6, 1997
    MAIDA CONSTR INC
  • OTApr 24, 1996
    CRAFTED INTERIORS
  • OTFeb 18, 1992
    V-V-3 INC.
  • MH-
    C&S RESTORATION INC.
  • PL-
    ADRIATIC PLBG & HTG CORP
  • OT-
    C.J.J.,INC.
  • OT-
    ANDREW CARLIN
  • OT-
    BAC CONSTRUCTION CORP
  • EQ-
    V-V-3 INC.
  • OT-
    V-V-3 INC.
  • OT-
    GALA REMODELING LLC
  • OT-
    KITCHENS ETC INC
  • OT-
    SMK ASSOCIATES INC
  • PL-
    MCMANUS MECH MAINT P&H IN
  • OT-
    MCMANUS MECHANICAL MAINTA
  • EQ-
    BAC CONSTRUCTION CORP
  • FP-
    LUND FIRE PROCDUCTS CO.,INC.
  • MH-
    APEX MECHANICAL SYSTEMS,INC.
  • OT-
    STEFANOS CONTRACTING INC
  • PL-
    ALAFOGIANNIS PLBG & HTG
  • PL-
    UNLIMITED PLG SOLUTIONS
  • PL-
    LOTUS MECHANICAL
  • EQ-
    CONCORDE WOODCRAFT&UPHOLSTERY
  • OT-
    CONCORDE WOODCRAFT&UPHOLSTERY
  • SP-
    MERCURY FIRE SUPP.
  • OT-
    K.R.S. RENOVATION CORP
  • OT-
    K.R.S. RENOVATION CORP
  • PL-
    ALLEGIANCE PLBG & HTG COR
DOB violations
  • May 11, 2025C-CONSTRUCTION OTHER OPTIONAL
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Oct 23, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 23, 2020E-ELEVATOR ELEVATORREQUIRED
  • Aug 16, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 16, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 15, 2017EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Sep 15, 2017EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Aug 25, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 26, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 27, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 27, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • Sep 27, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 27, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 20, 2009E-ELEVATOR ELEVATORREQUIRED
  • Aug 16, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jun 24, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 24, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 24, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2005LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 31, 2005LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 8, 2002L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • May 4, 1998LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 13, 1997LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Jan 13, 1997LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 28, 1993LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1014080033

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
3 active sale listings in the current corpus · latest record Jul 6, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
134 permits in the current corpus · latest record Dec 26, 1997

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
10 violations in the current corpus · latest record Jan 23, 2023

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
42 violations in the current corpus · latest record May 11, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.