CurbScoop
CurbScoop›Buildings›Lenox Hill›110 EAST 71 STREET

110 EAST 71 STREET

Manhattan· Lenox Hill· built 1917class RMBBL 1014057501
Open listing source

110 EAST 71 STREET is a 21-unit building in Lenox Hill, Manhattan, built in 1917.

2 units are on the market here right now.

City records show 30 DOB permits and 32 open violations on file.

Units (res)
21
Floors
23.0
Lot ft²
3,012 ft²
Bldg ft²
26,930 ft²
Assessed
$5.81M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
110 EAST 71 STREET #4
Manhattan · built 1917
Lenox Hill$3.99M$2,4181,650 ft²3 bd · 3 ba-45
2 DOBbedbug
4.0Source
110 EAST 71 STREET #4
Manhattan · built 1917
Lenox Hill$4.00M$2,4211,650 ft²3 bd · 3 ba-110
2 DOBbedbug
4.0Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 22, 2024 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 15, 2023 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 2, 2022 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK PENETRATING FROM NORTH WALL AT LOWER LEVEL IN THE 1st ROOM FROM NORTH LOCATED AT APT 22, 1st APARTMENT FROM SOUTH AT WEST
    Apr 26, 2019 · #22 · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 22 UPPER LEVEL, 22nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 16, 2019 · #22 · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 22 LOWER LEVEL, 22nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 16, 2019 · #22 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 22 LOWER LEVEL, 22nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 16, 2019 · #22 · NOV SENT OUT
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 22 UPPER LEVEL, 22nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 16, 2019 · #22 · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Feb 2, 2015 · VIOLATION DISMISSED
  • B
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... CEILING KITCHEN LOCATED AT APT 20, 20th STORY
    May 11, 2006 · #20 · NOV SENT OUT
  • B
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... CEILING NORTHEAST ROOM LOCATED AT APT 20, 20th STORY
    May 11, 2006 · #20 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & SOUTH WALL KITCHEN PENTHOUSE.
    Jun 17, 1999 · NOV SENT OUT
DOB permits (last 30)
  • Protection and Mechanical MethodsFeb 13, 2024
    PHOENIX SUTTON STR INC
  • Supported ScaffoldFeb 13, 2024
    PHOENIX SUTTON STR INC
  • Sidewalk ShedFeb 5, 2024
    PHOENIX SUTTON STR INC
  • Mechanical SystemsJul 17, 2023
    FOUR STREETS COOL AIR INC
  • General ConstructionAug 31, 2022
    P K REMODELING INC
  • PlumbingAug 31, 2022
    BYPASS MECHANICAL CORP
  • PlumbingAug 31, 2022
    ZATOS PLBG AND HTG INC
  • General ConstructionAug 31, 2022
    P K REMODELING INC
  • General ConstructionAug 31, 2022
    P K REMODELING INC
  • General ConstructionAug 31, 2022
    P K REMODELING INC
  • PlumbingAug 31, 2022
    ZATOS PLBG AND HTG INC
  • Supported ScaffoldJun 13, 2019
    CANIDO BASONAS CONSTRUCTI
  • Supported ScaffoldJun 13, 2019
    CANIDO BASONAS CONSTRUCTI
  • Supported ScaffoldJun 13, 2019
    CANIDO BASONAS CONSTRUCTI
  • Supported ScaffoldJun 13, 2019
    CANIDO BASONAS CONSTRUCTI
  • Sidewalk ShedFeb 5, 2019
    ROCK GROUP NY CORP
  • Sidewalk ShedFeb 5, 2019
    ROCK GROUP NY CORP
  • Sidewalk ShedFeb 5, 2019
    ROCK GROUP NY CORP
  • Sidewalk ShedFeb 5, 2019
    PLATINUM SERVICES NY LLC
  • Sidewalk ShedFeb 5, 2019
    ROCK GROUP NY CORP
  • MH-
    HITE CONSTRUCTION INC
  • OT-
    HITE CONSTRUCTION INC
  • OT-
    HITE CONSTRUCTION INC
  • PL-
    DALTON PUMBING & HTG INC
  • MH-
    LUKASZ CONST
  • OT-
    CANIDO BASONAS CONST SVC
  • EQ-
    ROCKLEDGE SCAFFOLD
  • OT-
    CANIDO BASONAS CONSTRUCTI
  • OT-
    INTERMASTER CORP
  • OT-
    LUKASZ CONST CO
DOB violations
  • Feb 22, 2022FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Oct 14, 2020E-ELEVATOR ELEVATORREQUIRED
  • Feb 5, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 15, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 15, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 3, 2017E-ELEVATOR ELEVATORREQUIRED
  • Aug 3, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Apr 5, 2012E-ELEVATOR ELEVATORREQUIRED
  • Apr 5, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jan 5, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 5, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 9, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 9, 2008E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jun 21, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 21, 2005E-ELEVATOR ELEVATORREQUIRED
  • Oct 28, 2003E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1014057501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Jul 17, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
63 permits in the current corpus · latest record Jun 23, 2026

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
12 violations in the current corpus · latest record Oct 10, 2025

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
20 violations in the current corpus · latest record Dec 16, 2022

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.