CurbScoop
CurbScoop›Buildings›Lenox Hill›605 PARK AVENUE

605 PARK AVENUE

Manhattan· Lenox Hill· built 1954class D4BBL 1013990074

605 PARK AVENUE is a 105-unit building in Lenox Hill, Manhattan, built in 1954.

1 unit is on the market here right now.

City records show 30 DOB permits and 62 open violations on file.

Units (res)
105
Floors
20.0
Lot ft²
14,526 ft²
Bldg ft²
181,000 ft²
Assessed
$23.9M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
605 PARK AVENUE #15DE
Manhattan · built 1954
Lenox Hill$5.50M-0 ft²4 bd · 4 ba-189
2 HPD-C11 DOBbedbug
15.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 10A, 10th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Feb 28, 2026 · #10A · VIOLATION CLOSED
  • B
    § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 10A, 10th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Feb 28, 2026 · #10A · NOV SENT OUT
  • B
    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 10A, 10th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Feb 28, 2026 · #10A · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HVAC UNIT AT WEST WALL. IN THE 4th ROOM FROM NORTH LOCATED AT APT 10A, 10th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Feb 28, 2026 · #10A · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 17, 2025 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Jul 26, 2023 · NOV SENT OUT
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Jul 26, 2023 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 10A, 10th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 26, 2023 · #10A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 10A, 10th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 19, 2023 · #10A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 10A, 10th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 19, 2023 · #10A · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 16, 2022 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 26, 2016 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE SOUTH WALL AND WINDOW FRAME IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 17A, 17th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 2, 2014 · #17A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 17A, 17th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 2, 2014 · #17A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 17A, 17th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 2, 2014 · #17A · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILINIG AND SOUTH WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 17A, 17th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 2, 2014 · #17A · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 17A, 17th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 2, 2014 · #17A · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 17A, 17th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 2, 2014 · #17A · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING AND SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 17A, 17th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 2, 2014 · #17A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WINDOW FRAME IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 17A, 17th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jun 2, 2014 · #17A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE SHUT OFF VALVE AT RADIATOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 10A, 10th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Nov 27, 2010 · #10A · VIOLATION CLOSED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 10A, 10th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 17, 2003 · #10A · VIOLATION CLOSED
DOB permits (last 30)
  • Protection and Mechanical MethodsAug 31, 2026
    PRAT ENTERPRISES CORP
  • General ConstructionFeb 23, 2026
    SAGE BUILDERS CORP
  • General ConstructionFeb 23, 2026
    SAGE BUILDERS CORP
  • PlumbingFeb 18, 2026
    PRACTICAL PLBG & HTG INC
  • General ConstructionDec 12, 2025
    212 RENOVATIONS GROUP LLC
  • Protection and Mechanical MethodsNov 25, 2025
    PRAT ENTERPRISES CORP
  • Supported ScaffoldSep 26, 2025
    PRAT ENTERPRISES CORP
  • Supported ScaffoldSep 26, 2025
    PRAT ENTERPRISES CORP
  • Protection and Mechanical MethodsSep 22, 2025
    PRAT ENTERPRISES CORP
  • Protection and Mechanical MethodsSep 22, 2025
    PRAT ENTERPRISES CORP
  • Suspended ScaffoldSep 17, 2025
    PRAT ENTERPRISES CORP
  • Suspended ScaffoldSep 17, 2025
    PRAT ENTERPRISES CORP
  • Suspended ScaffoldSep 17, 2025
    PRAT ENTERPRISES CORP
  • General ConstructionAug 22, 2025
    PRAT ENTERPRISES CORP
  • Protection and Mechanical MethodsAug 6, 2025
    PRAT ENTERPRISES CORP
  • Protection and Mechanical MethodsAug 6, 2025
    PRAT ENTERPRISES CORP
  • General ConstructionJul 18, 2025
    GAUDIOSO CONTRACTING INC
  • PlumbingJun 16, 2025
    A & C PLBG & HTG CO., INC
  • General ConstructionMay 20, 2025
    AMERICAN INTERIOR RENOV
  • General ConstructionMay 20, 2025
    AMERICAN INTERIOR RENOV
  • General ConstructionMay 20, 2025
    AMERICAN INTERIOR RENOV
  • Sidewalk ShedMar 26, 2025
    PHOENIX SUTTON STR INC
  • Sidewalk ShedMar 26, 2025
    PHOENIX SUTTON STR INC
  • Sidewalk ShedMar 26, 2025
    PHOENIX SUTTON STR INC
  • Sidewalk ShedMar 26, 2025
    PHOENIX SUTTON STR INC
  • Mechanical SystemsJul 2, 2024
    BHD GROUP LLC
  • PlumbingJun 28, 2024
    SMART PLBG & HTG CORP
  • General ConstructionMay 31, 2024
    IAN SCOTT
  • Sidewalk ShedJul 28, 2023
    DYNAMIX SCAFFOLD GROUP LL
  • Sidewalk ShedJul 28, 2023
    DYNAMIX SCAFFOLD GROUP LL
DOB violations
  • May 3, 2023BENCH-FAILURE TO BENCHMARK NONE
  • Jun 1, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Feb 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Dec 1, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Nov 2, 2021BENCH-FAILURE TO BENCHMARK NONE
  • Aug 2, 2021BENCH-FAILURE TO BENCHMARK NONE
  • Jun 2, 2021BENCH-FAILURE TO BENCHMARK NONE
  • Oct 2, 2019C-CONSTRUCTION OTHER OPTIONAL
  • Aug 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2018FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jul 12, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 12, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 12, 2016E-ELEVATOR ELEVATORREQUIRED
  • Aug 14, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 14, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 14, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 21, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 21, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 21, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 15, 2013C-CONSTRUCTION OTHER OPTIONAL
  • Jan 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Apr 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Apr 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Apr 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jan 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • Oct 13, 2009E-ELEVATOR ELEVATORREQUIRED
  • Oct 13, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 10, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 10, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 10, 2008E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jun 16, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2004E-ELEVATOR ELEVATORREQUIRED
  • Feb 19, 2002LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1013990074

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Feb 23, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
297 permits in the current corpus · latest record Oct 1, 2026

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
22 violations in the current corpus · latest record Apr 30, 2026

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
43 violations in the current corpus · latest record Jul 6, 2023

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.