CurbScoop
CurbScoopBuildingsLenox Hill750 PARK AVENUE

750 PARK AVENUE

Manhattan· Lenox Hill· built 1951class D4BBL 1013860037

750 PARK AVENUE is a 68-unit building in Lenox Hill, Manhattan, built in 1951.

2 units are on the market here right now.

City records show 30 DOB permits and 44 open violations on file.

Units (res)
68
Floors
17.0
Lot ft²
5,400 ft²
Bldg ft²
72,792 ft²
Assessed
$9.36M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
750 PARK AVENUE #16D
Manhattan · built 1951
Lenox Hill$549K-0 ft²studio · 1 ba-918
9 DOBbedbug
11.1Source
750 PARK AVENUE #12B
Manhattan · built 1951
Lenox Hill$1.29M-0 ft²1 bd · 1 ba-108
9 DOBbedbug
11.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    D26-20.08 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING.
    Sep 4, 1986 · NOT COMPLIED WITH
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME READILY ACCESSIBLE FOR SIGNATURE, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT MISSING 1ST STY PUBLIC HALL.
    Sep 4, 1986 · NOT COMPLIED WITH
  • A
    D26-22.03 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER.
    Sep 4, 1986 · NOT COMPLIED WITH
  • A
    D26-41.15 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING.
    Sep 4, 1986 · NOT COMPLIED WITH
  • A
    D26-21.03 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS ALL STORIES PUBLIC HALL.
    Aug 28, 1986 · NOT COMPLIED WITH
  • A
    D26-10.01 ADM CODE REFIT ENTRANCE SOUTH FIRE STAIRS 1ST STY PUBLIC HALL.
    Aug 28, 1986 · NOT COMPLIED WITH
DOB permits (last 30)
  • PLMar 3, 2014
    CAM ENERGY HTG&AIR COND I
  • OTSep 11, 2012
    FANUKA INC
  • EQDec 23, 1999
    SPRING SCAFFOLDING INC
  • OT-
    KAY WATERPROOFING
  • OT-
    PLER CONTR INC.
  • PL-
    GREGG NY PLUMBING, INC
  • OT-
    INTEGRATED PROJECT DELIVE
  • PL-
    PETER MICELI PLUMBING
  • EQ-
    ROCKLEDGE SCAFFOLD
  • PL-
    QMB PLUMBING & HEATING IN
  • OT-
    KAM YUEN CONSTRUCTION INC
  • PL-
    P.S.I. MECHANICAL
  • OT-
    SKYLINE RESTORATION INC
  • OT-
    SKYLINE RESTORATION INC
  • OT-
    SKYLINE RESTORATION INC
  • OT-
    SKYLINE RESTORATION INC
  • PL-
    CAM ENERGY HTG&AIR COND I
  • OT-
    SKYLINE RESTORATION INC
  • PL-
    OLYMPIA PLBING & HTG CORP
  • OT-
    GOLDSMITH CONSTRUCTION
  • EQ-
    SPRING SCAFFOLDING INC
  • OT-
    FANUKA INC
  • MH-
    FANUKA INC
  • PL-
    PLBG, PLBG & PLBG CORP
  • PL-
    SUPERB PLUMBING & HEATING
  • EQ-
    YORK SCAFFOLD EQUIPMENT CORP.
  • MH-
    COMFORT AIR CONDITIONING*
  • OT-
    LL CUSTOM HOMES LLC
  • OT-
    RA FLORIO BLDG CONTR. INC
  • OT-
    EMPRISE CONSTRUCTION INC
DOB violations
  • Dec 1, 2023EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 2, 2022AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 19, 2022AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 25, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jul 19, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 19, 2017E-ELEVATOR ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Aug 3, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 3, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 7, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 7, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • Dec 5, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 5, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 5, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 2, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 28, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 28, 2010E-ELEVATOR ELEVATORREQUIRED
  • Sep 8, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 10, 2005LANDMK-LANDMARK NONE
  • Feb 2, 2004E-ELEVATOR ELEVATORREQUIRED
  • Nov 22, 2002E-ELEVATOR ELEVATORREQUIRED
  • Nov 22, 2002E-ELEVATOR ELEVATORREQUIRED
  • Nov 16, 2001E-ELEVATOR ELEVATORREQUIRED
  • Nov 16, 2001E-ELEVATOR ELEVATORREQUIRED
  • Dec 16, 1999E-ELEVATOR ELEVATORREQUIRED
  • Dec 16, 1999E-ELEVATOR ELEVATORREQUIRED
  • Mar 20, 1989E-ELEVATOR ELEVATORREQUIRED
  • Nov 29, 1988E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 24, 2026

Stable property ID: nyc:bbl:1013860037

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record May 15, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
101 permits in the current corpus · latest record Mar 3, 2014

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
6 violations in the current corpus · latest record Aug 12, 2008

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
38 violations in the current corpus · latest record Apr 10, 2026

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.