CurbScoop
CurbScoopBuildingsLenox Hill11 EAST 68 STREET

11 EAST 68 STREET

Manhattan· Lenox Hill· built 1913class RMBBL 1013837501
Open listing source

11 EAST 68 STREET is a 29-unit building in Lenox Hill, Manhattan, built in 1913.

1 unit is on the market here right now.

City records show 30 DOB permits and 66 open violations on file.

Units (res)
29
Floors
13.0
Lot ft²
12,050 ft²
Bldg ft²
105,660 ft²
Assessed
$22.1M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
11 EAST 68 STREET #PHW
Manhattan · built 1913
Lenox Hill$35.0M$5,6556,189 ft²5 bd · 4 ba-2116
4 HPD-C11 DOBbedbug
17.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE KITCHEN LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 19, 2023 · #7C · NOV SENT OUT
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 19, 2023 · #7C · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 19, 2023 · #7C · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 19, 2023 · #7C · NOV SENT OUT
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE , IN THE ENTRANCE LOCATED AT APT 7C, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jun 30, 2022 · #7C · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Feb 15, 2022 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 15, 2022 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Apr 1, 2021 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 1, 2021 · VIOLATION DISMISSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Oct 4, 2017 · VIOLATION DISMISSED
  • C
    § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES TO ALL ROOMS IN THE ENTIRE APARTMENT LOCATED AT APT 9DW, 9th STORY, 1st APARTMENT FROM WEST AT NORTH
    Oct 4, 2017 · #9DW · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Oct 4, 2017 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Oct 4, 2017 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY
    Oct 4, 2017 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Oct 4, 2017 · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Oct 4, 2017 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Oct 4, 2017 · VIOLATION DISMISSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Oct 4, 2017 · VIOLATION DISMISSED
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT EAST
    Feb 20, 2016 · #2E · INVALID CERTIFICATION
  • A
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT EAST
    May 25, 2013 · #2E · NOV SENT OUT
  • C
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING AT PUBLIC HALL, 2nd STORY, SECTION AT EAST
    May 25, 2013 · VIOLATION CLOSED
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE FOYER LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT EAST
    May 25, 2013 · #2E · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE FOYER LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT EAST
    May 25, 2013 · #2E · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 21, 2012 · #10D · VIOLATION DISMISSED
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS IN THE KITCHEN LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 21, 2012 · #10D · CERTIFICATION POSTPONMENT GRANTED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 21, 2012 · #10D · VIOLATION DISMISSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 21, 2012 · #10D · VIOLATION DISMISSED
  • A
    SECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY
    Dec 21, 2012 · NOT COMPLIED WITH
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 21, 2012 · #10D · CERTIFICATION POSTPONMENT GRANTED
DOB permits (last 30)
  • OT-
    NAF CONSTRUCTION MANAGEME
  • MH-
    NAF CONSTRUCTION MANAGEME
  • OT-
    NAF CONSTRUCTION MANAGEME
  • MH-
    NAF CONSTRUCTION MANAGEME
  • PL-
    RCI PLBG, INC
  • MH-
    NAF CONSTRUCTION MANAGEME
  • OT-
    NAF CONSTRUCTION MANAGEME
  • PL-
    REILLY PLBG & HEATING INC
  • OT-
    NAF CONSTRUCTION MANAGEME
  • MH-
    NAF CONSTRUCTION MANAGEME
  • OT-
    IBEX CONSTRUCTION CO. LLC
  • PL-
    RCI PLBG, INC
  • OT-
    V. DISALVO CONTRACTING CO
  • MH-
    V. DISALVO CONTRACTING CO
  • OT-
    V. DISALVO CONTRACTING CO
  • SD-
    DANIELLE LOUISE, INC
  • PL-
    WALTER J.GRANDE P & H INC
  • BL-
    REILLY PLBG & HEATING INC
  • PL-
    HYDROKINETIC PLBG & HTG I
  • PL-
    PAR PLUMBING CO., INC
  • SP-
    KG SPRINKLER CORP
  • OT-
    NAF CONSTRUCTION MANAGEME
  • MH-
    NAF CONSTRUCTION MANAGEME
  • PL-
    PAR PLUMBING CO., INC
  • SP-
    LAWRENCE J. LEVINE
  • PL-
    RCI PLBG, INC
  • OT-
    FIVE STAR AWNINGS INC
  • OT-
    MICHILLI INC
  • OT-
    MICHILLI INC
  • SP-
    RCI FIRE PROTECTION LLC
DOB violations
  • Jul 12, 2021FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Jul 12, 2021FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Jul 12, 2021FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Oct 20, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 20, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 20, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 20, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 17, 2020LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 1, 2018P-PLUMBING NONE
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 24, 2017LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 29, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 29, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 29, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 29, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 2015EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 1, 2014EARCX-FAILURE TO SUBMIT EER NONE
  • Jul 29, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 29, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2013BENCH-FAILURE TO BENCHMARK NONE
  • Apr 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 18, 1988E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 24, 2026

Stable property ID: nyc:bbl:1013837501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Nov 13, 2020

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
107 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
29 violations in the current corpus · latest record Jul 27, 2023

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
37 violations in the current corpus · latest record Jul 12, 2021

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.