CurbScoop
CurbScoop›Buildings›Lenox Hill›870 5 AVENUE

870 5 AVENUE

Manhattan· Lenox Hill· built 1949class D4BBL 1013830001

870 5 AVENUE is a 94-unit building in Lenox Hill, Manhattan, built in 1949.

7 units are on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
94
Floors
20.0
Lot ft²
17,750 ft²
Bldg ft²
235,448 ft²
Assessed
$29.3M
DOF total
Comps L5y
0

Active sale listings (7)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
870 5 AVENUE #15E
Manhattan · built 1949
Lenox Hill$3.00M$1,2482,400 ft²4 bd · 4 ba-395
14 HPD-C6 DOBbedbug
30.5Source
870 5 AVENUE #14E
Manhattan · built 1949
Lenox Hill$7.95M-0 ft²2 bd · 2 ba-130
14 HPD-C6 DOBbedbug
30.5Source
870 5 AVENUE #10/11B
Manhattan · built 1949
Lenox Hill$4.25M-0 ft²2 bd · 2 ba-311
14 HPD-C6 DOBbedbug
30.5Source
870 5 AVENUE #2E
Manhattan · built 1949
Lenox Hill$1.68M-0 ft²2 bd · 2 ba-177
14 HPD-C6 DOBbedbug
30.5Source
870 5 AVENUE #4C
Manhattan · built 1949
Lenox Hill$2.17M-0 ft²1 bd · 1 ba-981
14 HPD-C6 DOBbedbug
30.5Source
870 5 AVENUE #1D
Manhattan · built 1949
Lenox Hill$750K-0 ft²studio · 1 ba-13
14 HPD-C6 DOBbedbug
30.5Source
870 5 AVENUE #1E
Manhattan · built 1949
Lenox Hill$1.80M-0 ft²3 bd · 1 ba-95
14 HPD-C6 DOBbedbug
30.5Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 29, 2026 · VIOLATION DISMISSED
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 13, 2025 · #9H · NOV SENT OUT
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED ACOUSTIC CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 13, 2025 · #9H · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 13, 2025 · #9H · NOV SENT OUT
  • A
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE 2ND LIGHT FIXTURE FROM WEST AT CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRIC WIRES ON NORTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • A
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED PLYWOOD AND MIRROR GLASS PANELS INSTALLED AT CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • C
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRIC WIRES ON ALL WALLS THROUGHOUT IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLETS ON ALL WALLS THROUGHOUT IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 9H, 9th STORY, APARTMENT AT EAST
    Jul 3, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    May 31, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST, SOUTH AND WEST WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    May 31, 2024 · #9H · NOV SENT OUT
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    May 31, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    May 31, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOV SENT OUT
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOTICE OF ISSUANCE SENT TO TENANT
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION MIRRORED PANELS OVER PLYWOOD INSTALLED AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRES AT NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE LIGHT FIXTURE AT CEILING AT ALCOVE IN THE 3rd ROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AT ALCOVE IN THE 3rd ROOM FROM NORTH LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOV SENT OUT
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED LIGHTED PANELS AT CEILING IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Apr 6, 2024 · #9H · NOV SENT OUT
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF A SUSPENDED LIGHTED PANELS AT CEILING IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 18, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 18, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND ALL WALLS AT ALCOVE IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 18, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE LIGHT FIXTURE AT CEILING AT ALCOVE IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 18, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 18, 2024 · #9H · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 9H, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jan 18, 2024 · #9H · NOV SENT OUT
DOB permits (last 30)
  • Mechanical SystemsAug 3, 2026
    COPPERMINE CONSTRUCTION *
  • PlumbingJul 31, 2026
    PIPEWORKS NYC INC
  • General ConstructionJul 30, 2026
    COPPERMINE CONSTRUCTION *
  • General ConstructionJan 22, 2026
    DAA CONSTRUCTION GROUP
  • Mechanical SystemsNov 26, 2025
    LIT GROUP, INC
  • General ConstructionNov 26, 2025
    LIT GROUP, INC
  • PlumbingNov 26, 2025
    P.S.I. MECHANICAL
  • PlumbingOct 30, 2025
    PAL-MAR PLBG & HTG INC
  • General ConstructionSep 8, 2025
    FREEDOM GS INC
  • General ConstructionAug 26, 2025
    RENOVATION PARTNERS INC
  • PlumbingAug 25, 2025
    SMART PLBG & HTG CORP
  • PlumbingAug 22, 2025
    ACCURATE MECHANICAL INC
  • General ConstructionAug 18, 2025
    FREEDOM GS INC
  • General ConstructionAug 18, 2025
    FREEDOM GS INC
  • Mechanical SystemsAug 8, 2025
    FREEDOM GS INC
  • Mechanical SystemsAug 8, 2025
    FREEDOM GS INC
  • PlumbingAug 5, 2025
    WAWEL PLBG AND HTG CORP
  • General ConstructionAug 5, 2025
    SAGE CONSTRUCTION SERVICE
  • PlumbingJun 30, 2025
    AQUEDUCT MECHANICAL CORP
  • General ConstructionJun 16, 2025
    JOHN PETROCELLI CONSTRUCT
  • Mechanical SystemsFeb 27, 2025
    COTTAM HEATING & AIR COND
  • General ConstructionFeb 27, 2025
    B & H RESTORATION INC
  • Mechanical SystemsJan 31, 2025
    FANUKA INC
  • PlumbingJan 30, 2025
    DONATO PLUMBING, INC
  • General ConstructionJan 30, 2025
    FANUKA INC
  • General ConstructionJan 30, 2025
    FANUKA INC
  • PlumbingJan 30, 2025
    DONATO PLUMBING, INC
  • General ConstructionDec 20, 2024
    PH CUSTOM HOME IMPROVEMEN
  • PlumbingDec 20, 2024
    SIMPLE CHOICE PLBG AND HT
  • General ConstructionAug 12, 2024
    HOMELINE CONSTRUCTION INC
DOB violations
  • Sep 16, 2025C-CONSTRUCTION OTHER OPTIONAL
  • Aug 1, 2024FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • May 29, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 21, 2024FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Dec 1, 2023EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Oct 4, 2023AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 1, 2022EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Aug 4, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jul 17, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jul 17, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jul 17, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jul 17, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jul 17, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jul 17, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 17, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 17, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jul 17, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Aug 8, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 8, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 30, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 7, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 7, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 7, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jun 7, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 22, 2011E-ELEVATOR ELEVATORREQUIRED
  • Nov 22, 2011E-ELEVATOR ELEVATORREQUIRED
  • Nov 22, 2011E-ELEVATOR ELEVATORREQUIRED
  • Nov 22, 2011E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1013830001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
7 active sale listings in the current corpus · latest record Jul 17, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
333 permits in the current corpus · latest record Sep 11, 2026

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
186 violations in the current corpus · latest record May 6, 2026

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
70 violations in the current corpus · latest record Sep 16, 2025

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.