CurbScoop
CurbScoopBuildingsLenox Hill20 EAST 68 STREET

20 EAST 68 STREET

Manhattan· Lenox Hill· built 1955class RMBBL 1013827501
Open listing source

20 EAST 68 STREET is an 83-unit building in Lenox Hill, Manhattan, built in 1955.

1 unit is on the market here right now.

City records show 30 DOB permits and 57 open violations on file.

Units (res)
83
Floors
15.0
Lot ft²
9,538 ft²
Bldg ft²
116,104 ft²
Assessed
$24.2M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
20 EAST 68 STREET #10DE
Manhattan · built 1955
Lenox Hill$3.70M$2,1141,750 ft²3 bd · 3 ba-41
1 HPD-C7 DOBbedbug
11.3Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 15, 2022 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Feb 15, 2022 · VIOLATION DISMISSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT OR NEAR MAILBOX AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 5, 2018 · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 16A, 15th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 23, 2001 · #16A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE BATHROOM LOCATED AT APT 16A, 15th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 23, 2001 · #16A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 16A, 15th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 23, 2001 · #16A · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REFIT TERRACE DOOR 16 STY PENHOUSE B NORTH.
    Dec 10, 1990 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 16 STY PENTHOUSE B NORTHEAST ROOM.
    Dec 10, 1990 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT INSIDE CLOSET 16 STY PENHOUSE B NORTHWEST ROOM.
    Dec 10, 1990 · VIOLATION CLOSED
DOB permits (last 30)
  • OTJul 16, 1996
    SELBY CONSTRUCTION
  • BL-
    ABILENE, INC
  • MH-
    LITE N NAIR ELECTRICAL & HVAC
  • PL-
    METRO PLUMBING AND HEATING
  • MH-
    EXA USA CORP
  • OT-
    EXA USA CORP
  • OT-
    SAGEWOOD CONSTRUCTION & D
  • OT-
    MACASSAR CORP.
  • OT-
    EUROPE PAINT CORP
  • OT-
    PRECISE RENOVATION INC
  • MH-
    PRECISE RENOVATION INC
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    GLENN R. CARPENTRY
  • OT-
    EUROPE PAINT CORP
  • FB-
    ABILENE, INC
  • OT-
    X-ACT CONTRACTING CORP
  • OT-
    BULTRA, INC
  • OT-
    PALI BUILDING RESTOR.,INC
  • EQ-
    ABATE CONSTRUCTION ,INC.
  • OT-
    ABATE CONSTRUCTION ,INC.
  • EQ-
    FISHER DEVELOPMENT INC
  • OT-
    FISHER DEVELOPMENT INC
  • PL-
    CHPH CO
  • PL-
    R & A HEATING & CONTRACTING
  • OT-
    LIEBHABER CONSTR INC.
  • PL-
    ORBIT PLBG & HTG INC
  • SG-
    PAUL SIGNS INC
  • OT-
    PALI BUILDING RESTOR.,INC
  • PL-
    ALKLEM PLUMBING
  • MH-
    ABILENE INC
DOB violations
  • Dec 1, 2024EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Jun 1, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Feb 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Dec 1, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Nov 2, 2021BENCH-FAILURE TO BENCHMARK NONE
  • Aug 2, 2021BENCH-FAILURE TO BENCHMARK NONE
  • Jun 2, 2021BENCH-FAILURE TO BENCHMARK NONE
  • Oct 21, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 21, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 21, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 28, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2015E-ELEVATOR ELEVATORREQUIRED
  • Feb 25, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 25, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 5, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 5, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 12, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 22, 2011E-ELEVATOR ELEVATORREQUIRED
  • Nov 22, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 23, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 23, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 23, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 8, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Aug 25, 2008E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2008E-ELEVATOR ELEVATORREQUIRED
  • Aug 1, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 1, 2007E-ELEVATOR ELEVATORREQUIRED
  • Aug 1, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jul 18, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jul 18, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jul 18, 2006E-ELEVATOR ELEVATORREQUIRED

More buildings in Lenox Hill

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:1013827501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 16, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
185 permits in the current corpus · latest record Jul 16, 1996

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
17 violations in the current corpus · latest record Dec 17, 2025

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
46 violations in the current corpus · latest record Nov 20, 2025

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lenox Hill market page.