CurbScoop
CurbScoopBuildingsRoosevelt Island555 MAIN STREET

555 MAIN STREET

Manhattan· Roosevelt Island· built 1975class RMBBL 1013737505

555 MAIN STREET is a 400-unit building in Roosevelt Island, Manhattan, built in 1975.

4 units are on the market here right now.

City records show 30 DOB permits and 64 open violations on file.

Units (res)
400
Floors
19.0
Lot ft²
118,727 ft²
Bldg ft²
556,913 ft²
Assessed
$38.8M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
575 MAIN STREET #1601
Manhattan · built 1975
Roosevelt Island$680K$847803 ft²1 bd · 1 ba-33
3 HPD-C10 DOBbedbug
28.6Source
575 MAIN STREET #1310
Manhattan · built 1975
Roosevelt Island$1.40M$8751,595 ft²3 bd · 2 ba-78
3 HPD-C10 DOBbedbug
28.6Source
555 MAIN STREET #1315
Manhattan · built 1975
Roosevelt Island$1.28M$8001,600 ft²3 bd · 1 ba-489
3 HPD-C10 DOBbedbug
28.6Source
555 MAIN STREET #1204
Manhattan · built 1975
Roosevelt Island$890K$8481,050 ft²2 bd · 1 ba-108
3 HPD-C10 DOBbedbug
28.6Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF ANTS IN THE ENTIRE APARTMENT LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''575''
    Jun 7, 2026 · #103 · VIOLATION OPEN
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Jan 21, 2026 · #103 · CIV14 MAILED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Jan 21, 2026 · #103 · CIV14 MAILED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE KITCHEN LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Jan 21, 2026 · #103 · CIV14 MAILED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD CROWN MOLDING AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''575''
    Dec 18, 2025 · #103 · VIOLATION DISMISSED
  • A
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''557''
    Dec 18, 2025 · #103 · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD CROWN MOLDING AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''575''
    Dec 18, 2025 · #103 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROVIDE A LIGHT FIXTURE AT ANY WALL OR THE CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Sep 12, 2025 · #103 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AT THE CEILING'S CROWN MOLDING IN THE 1st ROOM FROM EAST LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Sep 12, 2025 · #103 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Sep 12, 2025 · #103 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE KITCHEN LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Sep 12, 2025 · #103 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ELECTRIC OUTLET AND SWITCH COVER AT SOUTH WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Sep 12, 2025 · #103 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH AND SOUTH WALLS IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Sep 12, 2025 · #103 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE OUTLET COVER AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Sep 12, 2025 · #103 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Sep 12, 2025 · #103 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROVIDE A LIGHT FIXTURE AT ANY WALL OR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''575'', 1st FROM SOUTH AT WEST
    Sep 12, 2025 · #103 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL AT PUBLIC HALL, 1st STORY
    Jul 14, 2025 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 1ST, 2ND AND 3RD CONCRETE STAIR TREADS FROM BOTTOM AT NORTH SIDE OF BUILDING
    Jul 14, 2025 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING WALKWAY AT FRONT SOUTH OF BUILDING YARD
    Jul 14, 2025 · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT S605, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 23, 2024 · #S605 · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT S605, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 23, 2024 · #S605 · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE (HINGES) IN THE ENTRANCE LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''575''
    Aug 8, 2023 · #103 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE KITCHEN LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''575''
    Aug 8, 2023 · #103 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''575''
    Aug 8, 2023 · #103 · VIOLATION CLOSED
  • B
    28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AND SILL AT FIRE STAIR B AT PUBLIC HALL, 1st STORY, SECTION ''575''
    Aug 8, 2023 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE CEILING, WALLS AND FLOORS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 103, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    May 16, 2023 · #103 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 911, 9th STORY, 3rd APARTMENT FROM NORTH AT EAST
    Dec 11, 2022 · #911 · VIOLATION DISMISSED
  • I
    § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS S1713, 17 STORY, EAST 1, UNDER VACATE NUMBER 154876
    Jul 9, 2020 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF FIRE DAMAGE IN THE ENTIRE APARTMENT LOCATED AT APT S1713, 17th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 24, 2020 · #S1713 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 1302, 13th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 3, 2017 · #1302 · VIOLATION DISMISSED
  • B
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... ON THE CEILING IN THE BATHROOM LOCATED AT APT 1302, 13th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 3, 2017 · #1302 · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1302, 13th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 3, 2017 · #1302 · VIOLATION DISMISSED
  • A
    § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE PORCELIN INTERIOR OF THE WASHBASIN IN THE BATHROOM LOCATED AT APT 1302, 13th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 3, 2017 · #1302 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 1302, 13th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 15, 2017 · #1302 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 1302, 13th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 15, 2017 · #1302 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Jul 11, 2017 · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Jul 11, 2017 · VIOLATION CLOSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Jul 11, 2017 · VIOLATION CLOSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Jul 11, 2017 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARDWOOD FLOOR AT WALKIN CLOSET IN THE 3rd ROOM FROM NORTH LOCATED AT APT 304, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 7, 2017 · #304 · VIOLATION CLOSED
DOB permits (last 30)
  • OTFeb 18, 2020
    K.J. REMODELING OF NY CO*
  • OTJan 24, 2017
    GAUDIOSO CONTRACTING INC
  • OT-
    GAUDIOSO CONTRACTING INC
  • OT-
    GAUDIOSO CONTRACTING INC
  • OT-
    U.S. MODERN CONSTRUCTION
  • PL-
    RRP PLUMBING CORP
  • PL-
    L.L.G. PLBG & HTG INC
  • OT-
    XINOS CONSTRUCTION CORP
  • OT-
    A & E BROTHERS LTD
  • OT-
    ABOVE REMODELING CORP
  • OT-
    K.J. REMODELING OF NY CO*
  • OT-
    ABOVE REMODELING CORP
  • OT-
    ABOVE REMODELING CORP
  • PL-
    MAXWELL PLUMB MECH. CORP
  • PL-
    PLBG INC
  • PL-
    ALL PRO PLBG & HTG INC
  • OT-
    ABOVE REMODELING CORP
  • PL-
    POPULAR PLBG & HTG CORP
  • OT-
    GAUDIOSO CONTRACTING INC
  • OT-
    KLARACON LLC
  • OT-
    METRODESIGN REMODELING C
  • PL-
    L.L.G. PLBG & HTG INC
  • OT-
    DUTCHESS CABINETS OF NY I
  • OT-
    IMPACT BUILDERS CORP
  • OT-
    IMPACT BUILDERS CORP
  • OT-
    KLARACON LLC
  • OT-
    SF CONSTRUCTION EXPERTS
  • PL-
    NM MECHANICAL CORP
  • OT-
    DISASTER PRO INC
  • PL-
    L.L.G. PLBG & HTG INC
DOB violations
  • Nov 14, 2025HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Nov 14, 2025HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Nov 12, 2021E-ELEVATOR ELEVATORREQUIRED
  • Nov 12, 2021E-ELEVATOR ELEVATORREQUIRED
  • Nov 12, 2021E-ELEVATOR ELEVATORREQUIRED
  • Nov 12, 2021E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 2020HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Mar 16, 2020HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2018P-PLUMBING NONE
  • Jun 29, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 29, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 29, 2017E-ELEVATOR ELEVATORREQUIRED
  • Dec 17, 2016P-PLUMBING NONE
  • Aug 12, 2015E-ELEVATOR ELEVATORREQUIRED
  • Aug 12, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jul 16, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 16, 2014E-ELEVATOR ELEVATORREQUIRED
  • Oct 9, 2013AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE

More buildings in Roosevelt Island

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1013737505

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Jun 2, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
110 permits in the current corpus · latest record Feb 18, 2020

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
48 violations in the current corpus · latest record Jun 7, 2026

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
24 violations in the current corpus · latest record Nov 14, 2025

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Roosevelt Island market page.