CurbScoop
CurbScoopBuildingsUpper West Side180 RIVERSIDE DRIVE

180 RIVERSIDE DRIVE

Manhattan· Upper West Side· built 1922class D4BBL 1012510001
Open listing source

180 RIVERSIDE DRIVE is a 90-unit building in Upper West Side, Manhattan, built in 1922.

1 unit is on the market here right now.

City records show 30 DOB permits and 43 open violations on file.

Units (res)
90
Floors
13.0
Lot ft²
18,350 ft²
Bldg ft²
203,436 ft²
Assessed
$15.8M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
180 RIVERSIDE DRIVE #3B
Manhattan · built 1922
Upper West Side$2.75M-0 ft²3 bd · 2 ba-174
1 HPD-C17 DOBbedbug
16.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD AT FLOOR OF BASE CABINET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 12L, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 24, 2025 · #12L · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 12L, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 24, 2025 · #12L · VIOLATION CLOSED
  • C
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SCREWS PROTRUDING FROM LOWER BASE CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 12L, 12th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 24, 2025 · #12L · VIOLATION CLOSED
DOB permits (last 30)
  • PLAug 25, 2008
    H2O CONCEPT PLUMBING & HEATING
  • OTMay 23, 2005
    RYMOR CONSTRUCTION
  • MHDec 9, 2004
    TEAMWORK CONTRACTING INC
  • OTSep 13, 2004
    INSIDER SAM INC
  • ALMay 14, 1991
    ON THE LEVEL CONSTRUCTION
  • PL-
    DNA PLUMBING CONTRACTORS INC
  • OT-
    DELUC INC
  • MH-
    VIR CONSTRUCTION INC
  • MH-
    SENAN CLANCY CONTRACTING
  • PL-
    BEST ELECL MECHANICAL LTD
  • AL-
    ORSID REALTY
  • OT-
    PETER DINATALE & ASSOC
  • MH-
    PETER DINATALE & ASSOC
  • PL-
    BRANCH PLUMBING LLC
  • PL-
    HK MECHANICAL SERV CORP
  • PL-
    A.M. SAGE PLG & HTG LLC
  • PL-
    HYDRO MECHANICAL INC
  • OT-
    SENAN CLANCY CONTRACTING
  • OT-
    TOWER BUILDING RESTORATION
  • PL-
    SPARACO'S P&H CORP
  • OT-
    PETER DI NATALE & ASSOC I
  • MH-
    PETER DI NATALE & ASSOC I
  • MH-
    DEBONO_BRO. BUILD. DEVE. INC.
  • PL-
    WASOFF PLBG AND UTILITY CO INC
  • OT-
    BIRCHWOOD INC
  • OT-
    PETER DI NATALE & ASSOC I
  • OT-
    FJB CONTRACTING INC
  • MH-
    FJB CONTRACTING INC
  • OT-
    CODA INTERIORS
  • MH-
    PETER DINATALE & ASSOCIAT
DOB violations
  • Jul 23, 2025P-PLUMBING NONE
  • Oct 29, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 29, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 29, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 2, 2020P-PLUMBING NONE
  • Jun 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jun 16, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 16, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 16, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 16, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 16, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 30, 2013E-ELEVATOR ELEVATORREQUIRED
  • Apr 30, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 12, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 12, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 12, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 12, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 12, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 19, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 31, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2011E-ELEVATOR ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 24, 2026

Stable property ID: nyc:bbl:1012510001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Feb 12, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
149 permits in the current corpus · latest record Aug 26, 2008

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
3 violations in the current corpus · latest record May 16, 2025

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
84 violations in the current corpus · latest record Jul 23, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.