CurbScoop
CurbScoopBuildingsUpper West Side173 RIVERSIDE DRIVE

173 RIVERSIDE DRIVE

Manhattan· Upper West Side· built 1926class D4BBL 1012500067

173 RIVERSIDE DRIVE is a 167-unit building in Upper West Side, Manhattan, built in 1926.

1 unit is on the market here right now.

City records show 30 DOB permits and 49 open violations on file.

Units (res)
167
Floors
15.0
Lot ft²
31,475 ft²
Bldg ft²
380,920 ft²
Assessed
$32.1M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
173 RIVERSIDE DRIVE #9N
Manhattan · built 1926
Upper West Side$2.00M-0 ft²3 bd · 3 ba-28
18 DOBbedbug
16.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RATED MATERIAL BULKHEAD CEILING TO ROOF.
    Jun 20, 1999 · VIOLATION DISMISSED
  • B
    § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR PROVIDE APPROVED TYPE GATE AT SOUTH WINDOW SOUTH ROOM 1 STY NORTHWEST APT 1A. LOCATED AT APT 1A
    Feb 4, 1999 · #1A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BROKEN CONCRETE FLOOR NORTHWEST PUBLIC HALL 1 STY .
    Feb 4, 1999 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTRHEAST WALL NORTHWEST PUBLIC HALL 1 STY.
    Feb 4, 1999 · VIOLATION DISMISSED
  • A
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE ALL FLOORS AT 1 STY NORTHWEST PUBLIC HALL.
    Feb 4, 1999 · VIOLATION DISMISSED
  • B
    § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR PROVIDE APPROVED TYPE GATE WINDOW SOUTH FACING 2 STY APT FROM NORTH 1 STY EAST APT 1H.
    Jul 9, 1998 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROVIDE HANDRAIL AROUND OPENING FOR COURT YARD STAIRWELL TO BSMT EAST YARD AT 2 STY APT FROM NORTH.
    Jul 9, 1998 · VIOLATION DISMISSED
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION NORTH & SOUTH PARTITION REMOVED BETWEEN SOUTHWEST ROOM & PANTRY EAST WING 3 STY NORTHWEST APT G.
    Apr 5, 1984 · VIOLATION DISMISSED
  • A
    D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT, THE SURFACES AT CEILING OF PRIVATE HALL AT NORTHEAST WING 11 STY SOUTHWEST APT L.
    Dec 15, 1966 · VIOLATION DISMISSED
DOB permits (last 30)
  • PLNov 9, 2017
    METROTECH MECHANICAL CORP
  • OTFeb 3, 2017
    PROKAST CONSTRUCTION INC
  • PLMay 31, 2016
    SANDY'S P & H CO., LTD
  • OTMay 28, 2003
    SILVERSTEIN & ASSOCIATES INT
  • OTAug 5, 2002
    TRIESTA
  • OTJan 17, 2001
    HORIZON OF LI
  • PLFeb 18, 1998
    ROCKFORD PLG & HTG CORP
  • MHJan 28, 1998
    PAUL BAVOSA CONSTRUCTION MANAGE
  • OTApr 14, 1995
    TEMPLE CON
  • OTDec 12, 1994
    SIBONY CONTRACTING CORP
  • OTJun 10, 1994
    HANJO CONTRACTORS INC
  • PLJul 28, 1993
    VINRAY PLG & HTG INC
  • MHApr 30, 1993
    ALL CITI INTERIORS CONSTRUCION
  • PLOct 12, 1990
    HARRY A GLENXIER
  • ALJun 28, 1990
    OVERALL CONSTRUCTION INC.
  • OT-
    AUGUST CONSTRUCTION GROUP
  • MH-
    AUGUST CONSTRUCTION GROUP
  • OT-
    GILD RENOVATION LLC
  • OT-
    AUGUST CONSTRUCTION GROUP
  • PL-
    PRESTIGE INTERSTATE PLG & HGT
  • MH-
    PROLOGIC CONSTR OF NY INC
  • OT-
    EDMUND LEWIS LTD
  • MH-
    KITCHEN BATH AND BEYOND
  • PL-
    EXPRESS PLBG SEWR AND WTR
  • PL-
    QMB PLUMBING/HEATING INC.
  • OT-
    GAUDIOSO CONTRACTING INC
  • SP-
    T&R MECH CORP
  • MH-
    SEE YOU GC INC
  • OT-
    SEE YOU GC INC
  • OT-
    MLZ GENERAL CONSTRUCTION
DOB violations
  • Mar 21, 2023FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Feb 22, 2023FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Oct 29, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 29, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jan 14, 2021P-PLUMBING NONE
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Aug 25, 2018P-PLUMBING NONE
  • Jun 19, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jun 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 24, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 22, 2013AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • May 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 14, 2013E-ELEVATOR ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:1012500067

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 13, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
491 permits in the current corpus · latest record Nov 9, 2017

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
9 violations in the current corpus · latest record Sep 7, 2022

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
99 violations in the current corpus · latest record Mar 21, 2023

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.