CurbScoop
CurbScoopBuildingsUpper West Side140 RIVERSIDE DRIVE

140 RIVERSIDE DRIVE

Manhattan· Upper West Side· built 1939class D4BBL 1012480001landmark
Open listing source

140 RIVERSIDE DRIVE is a 249-unit building in Upper West Side, Manhattan, built in 1939.

1 unit is on the market here right now.

City records show 30 DOB permits and 57 open violations on file.

Units (res)
249
Floors
19.0
Lot ft²
28,700 ft²
Bldg ft²
372,186 ft²
Assessed
$34.5M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
140 RIVERSIDE DRIVE #9M
Manhattan · built 1939
Upper West Side$1.50M-0 ft²1 bd · 1 ba-29
3 HPD-C5 DOBbedbug
14.3Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MORTAR & JOINTS (INTERIOR BICK SUB-WALL) BEHIND THE RADIATOR UNDER WINDOW. IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 16, 2022 · #11J · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 16, 2022 · #11J · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MORTAR AND CONCRETE WALL AT WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 16, 2019 · #11J · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 11J, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 16, 2019 · #11J · VIOLATION CLOSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING , 1st STORY
    Jul 16, 2019 · VIOLATION DISMISSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD., 1st STORY
    Jul 16, 2019 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORY
    Jul 16, 2019 · VIOLATION DISMISSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING , 1st STORY
    Jul 16, 2019 · VIOLATION DISMISSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. , 1st STORY
    Jul 16, 2019 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR - MISSING AT PUBLIC HALL, 1st STORY
    May 6, 2017 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    May 6, 2017 · VIOLATION DISMISSED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL COVER WITH SHARP EDGE PROTRUDING AT WEST NORTH AIR CONDITIONER CASING IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 8H, 8th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Jul 29, 2011 · #8H · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS, AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 8H, 8th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Jan 5, 2010 · #8H · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 8H, 8th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Jan 5, 2010 · #8H · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CERAMIC TILES NORTH, AND SOUTH WALLS IN THE 3rd BATHROOM FROM NORTH AT WEST LOCATED AT APT 8H, 8th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Jan 5, 2010 · #8H · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL, AND CEILING WITHIN WALL CABINET IN THE KITCHEN LOCATED AT APT 8H, 8th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Jan 5, 2010 · #8H · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 8H, 8th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Jan 5, 2010 · #8H · VIOLATION DISMISSED
DOB permits (last 30)
  • OTFeb 21, 2020
    MA KITCHEN & BATH INC
  • PLNov 19, 2009
    P BY G, INC
  • PLFeb 4, 2004
    NEPTUNE MECHANICAL INC
  • EQMar 28, 2003
    ROCKLEDGE SCAFFOLD
  • PLMay 5, 1997
    RELIABLE PLMB & HTNG
  • MHApr 23, 1997
    PERFECT HOME IMPROVEMENT INC
  • OTMay 10, 1996
    NATIONAL MICROWAVE
  • OTMar 9, 1993
    TEMAS INC.
  • OTAug 22, 1991
    WILDMAN-BEARNHARDT
  • MHAug 22, 1991
    WILDMAN-BEARNHARDT
  • PLDec 12, 1990
    R & A HEATING & CONTRACTING
  • ALSep 12, 1990
    WESTCHESTER CUSTOM KITCHEN INC
  • OT-
    S LMACEDO CONSTR CORP
  • PL-
    PAL-MAR PLBG & HTG INC
  • OT-
    CAPITAL CRAFTSMEN, INC
  • PL-
    WALTER J GRANDE PLG AND HTG
  • OT-
    9J BUILDER INC
  • OT-
    NOVA RESTORATION INC
  • EQ-
    L & Z RESTORATION CORP
  • OT-
    HIICOMPANY CORP
  • OT-
    MANHATTAN DESIGN & BUILD
  • FB-
    MARLANDE HEATING CORPORATION
  • PL-
    AVATAR PLUMBING/HEATING
  • AL-
    GANNON LEO
  • OT-
    EXECUTECH INTERIORS CORP
  • PL-
    MASTER PLBG AND HTG INC
  • PL-
    SPEEDWAY PLG CORP
  • PL-
    NEPTUNE MECHANICAL INC
  • OT-
    BENCHMARK CONSTRUCTION CO
  • OT-
    RICONDA MAINTENANCE INC
DOB violations
  • Nov 1, 2023FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Feb 22, 2023FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Feb 17, 2023FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Jul 7, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 7, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 9, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 16, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jun 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jul 22, 2016LANDMK-LANDMARK NONE
  • Nov 4, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 19, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 6, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2012EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Sep 19, 2012AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jul 6, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2011E-ELEVATOR ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1012480001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 14, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
326 permits in the current corpus · latest record Feb 21, 2020

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
17 violations in the current corpus · latest record Apr 22, 2024

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
96 violations in the current corpus · latest record Oct 17, 2024

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.