CurbScoop
CurbScoop›Buildings›Upper West Side›2541 BROADWAY

2541 BROADWAY

Manhattan· Upper West Side· built 1925class D4BBL 1012430010
Open listing source

2541 BROADWAY is an 18-unit building in Upper West Side, Manhattan, built in 1925.

1 unit is on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
18
Floors
7.0
Lot ft²
7,554 ft²
Bldg ft²
43,404 ft²
Assessed
$6.69M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
251 West 95th Street #2N
Manhattan · built 1925
Upper West Side$1.70M$8072,100 ft²3 bd · 2 ba-403
15 HPD-C15 DOBbedbug
37.4Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 15, 2022 · VIOLATION DISMISSED
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3; WG TO REPLACE = 4; WG TO REPAIR = 4; IN THE ENTIRE APARTMENT LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 11, 2013 · #2S · VIOLATION DISMISSED
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 1; ONE WAY SCREWS AND WINDOW STOPS MISSING AT AIR CONDITIONER UNITS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Oct 11, 2013 · #2S · VIOLATION DISMISSED
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES WASHBASIN IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4N, 4th STORY, APARTMENT AT EAST
    Dec 7, 2009 · #4N · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS, AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 4th STORY, APARTMENT AT EAST
    Dec 7, 2009 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RUBBER GASKET AT DOOR TO THE REFRIGERATOR IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 7, 2009 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 4N, 5th STORY, APARTMENT AT EAST
    Dec 7, 2009 · #4N · VIOLATION CLOSED
  • B
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE , IN THE ENTRANCE LOCATED AT APT 4N, 5th STORY, APARTMENT AT EAST
    Dec 7, 2009 · #4N · VIOLATION CLOSED
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES WASHBASIN IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 4N, 4th STORY, APARTMENT AT EAST
    Dec 7, 2009 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR BELL IN THE ENTRANCE LOCATED AT APT 4N, 4th STORY, APARTMENT AT EAST
    Dec 7, 2009 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GASKET AT DOOR TO REFRIGERATOR IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 10, 2009 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING ASSEMBLY AT ENTRANCE DOOR TO APT. LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 10, 2009 · #4N · VIOLATION CLOSED
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASH BASIN IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 10, 2009 · #4N · VIOLATION CLOSED
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT WASH BASIN IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 10, 2009 · #4N · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 10, 2009 · #4N · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL DOOR BELL LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 10, 2009 · #4N · VIOLATION CLOSED
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES ,, IN THE BATHROOM LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 18, 2008 · #4N · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 18, 2008 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL AT DOOR IN THE ENTRANCE LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 18, 2008 · #4N · VIOLATION CLOSED
  • B
    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES WATER CLOSET COMPARTMENT IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 18, 2008 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW LOWER SASH IN THE 4th ROOM FROM NORTH LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 18, 2008 · #4N · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE KNOB AT GAS RANGE IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 18, 2008 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 18, 2008 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR BELL IN THE ENTRANCE LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 29, 2008 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR GASKET IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 29, 2008 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE HANDLES TO GAS RANGE IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 29, 2008 · #4N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR HANDLE TO REFRIGERTAOR IN THE KITCHEN LOCATED AT APT 4N, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 29, 2008 · #4N · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RADIATOR FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, EAST WALL, WEST WALL IN THE 5th BATHROOM FROM EAST LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, 1st DOOR FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL, BASEBOARD AT EAST WALL, BASEBOARD AT WEST WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st RADIATOR FROM WEST AT NORTH WALL, SOUTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL, WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd BATHROOM FROM EAST AT CENTER LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT WEST WALL, 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL, NORTH WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE 2nd PRIVATE HALLWAY FROM NORTH AT WEST LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 2S, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    May 16, 2008 · #2S · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSE NAIL AT WOOD FLOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4N, 4th STORY, APARTMENT AT EAST
    Aug 9, 2007 · #4N · VIOLATION CLOSED
DOB permits (last 30)
  • Mechanical SystemsSep 12, 2025
    TYLER CONSTRUCTION INC
  • Supported ScaffoldNov 15, 2024
    THE METRO GROUP, INC
  • Mechanical SystemsNov 14, 2024
    THE METRO GROUP, INC
  • Supported ScaffoldOct 20, 2023
    EMG INDUSTRIAL CHIMNEY IN
  • General ConstructionOct 12, 2023
    EMG INDUSTRIAL CHIMNEY IN
  • Mechanical SystemsAug 4, 2023
    BLACK SQUARE BUILDERS COR
  • General ConstructionMay 13, 2023
    BLACK SQUARE BUILDERS COR
  • PlumbingApr 20, 2023
    CROSSFIELD PLUMBING AND
  • AntennaFeb 20, 2023
    SQUAN CONSTRUCTION SERVIC
  • AntennaFeb 20, 2023
    SQUAN CONSTRUCTION SERVIC
  • Sidewalk ShedAug 21, 2020
    PARSONS CONSTRUCTION INC
  • Supported ScaffoldAug 21, 2020
    PARSONS CONSTRUCTION INC
  • Supported ScaffoldAug 21, 2020
    PARSONS CONSTRUCTION INC
  • Sidewalk ShedAug 21, 2020
    PARSONS CONSTRUCTION INC
  • Supported ScaffoldAug 20, 2020
    PARSONS CONSTRUCTION INC
  • Sidewalk ShedAug 20, 2020
    PARSONS CONSTRUCTION INC
  • PLJan 24, 2017
    DUAL FUEL PLUBING & HTING
  • OT-
    S.SEZULA RENOVATION INC
  • OT-
    S & O CONSTRUCTION CORP
  • FB-
    MICHAEL S. KAPLAN
  • OT-
    TELCOM ENGINEERING GP INC
  • EQ-
    UNIVERSAL BUILD SUPP LLC
  • MH-
    LARRY BEDDALL INC.
  • OT-
    LARRY BEDDALL INC.
  • PL-
    AMERICAN STANDARD PLUMBING
  • EQ-
    UNIVERSAL BUILD SUPP LLC
  • OT-
    TECH NEL ELEC INC.
  • PL-
    SPARTAN PL & HTG INC
  • OT-
    FAST TRACK ELECTRIC CORP
  • PL-
    DUAL FUEL PLUBING & HTING
DOB violations
  • Jun 30, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Mar 16, 2020HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Mar 16, 2020HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 22, 2018HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 22, 2018HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Dec 16, 2016HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Dec 16, 2016HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 17, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2012E-ELEVATOR ELEVATORREQUIRED
  • Aug 20, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jul 31, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 26, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 30, 2007LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
  • Aug 19, 2006C-CONSTRUCTION OTHER OPTIONAL
  • May 24, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jul 24, 2001E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2000E-ELEVATOR ELEVATORREQUIRED
  • Dec 7, 1999C-CONSTRUCTION OTHER OPTIONAL
  • Sep 14, 1999C-CONSTRUCTION OTHER OPTIONAL
  • Oct 21, 1995E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 1992LL1080-LOCAL LAW 10/80 - FACADE FACADE OPTIONAL
  • May 13, 1992ES-ELECTRIC SIGNS NONE
  • May 13, 1992ES-ELECTRIC SIGNS NONE
  • May 13, 1992ES-ELECTRIC SIGNS NONE
  • Mar 13, 1992C-CONSTRUCTION OTHER OPTIONAL
  • Mar 13, 1992C-CONSTRUCTION OTHER OPTIONAL
  • Mar 13, 1992C-CONSTRUCTION OTHER OPTIONAL

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1012430010

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 21, 2025

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
127 permits in the current corpus · latest record Oct 9, 2025

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
60 violations in the current corpus · latest record Dec 13, 2024

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
42 violations in the current corpus · latest record May 24, 2024

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.