CurbScoop
CurbScoopBuildingsUpper West Side2420 BROADWAY

2420 BROADWAY

Manhattan· Upper West Side· built 1920class D4BBL 1012370017
Open listing source

2420 BROADWAY is a 158-unit building in Upper West Side, Manhattan, built in 1920.

2 units are on the market here right now.

City records show 30 DOB permits and 53 open violations on file.

Units (res)
158
Floors
12.0
Lot ft²
36,255 ft²
Bldg ft²
313,563 ft²
Assessed
$38.0M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
205 WEST 89 STREET #6RS
Manhattan · built 1920
Upper West Side$3.48M$1,3662,544 ft²3 bd · 3 ba-181
1 HPD-C23 DOBbedbug
19.8Source
205 WEST 89 STREET #PH8
Manhattan · built 1920
Upper West Side$749K-0 ft²1 bd · 1 ba-181
1 HPD-C23 DOBbedbug
19.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR ... AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · INVALID CERTIFICATION
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX ... AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · INVALID CERTIFICATION
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · INVALID CERTIFICATION
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM ... AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · NOV CERTIFIED LATE
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Jul 31, 2019 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 5, 2018 · VIOLATION DISMISSED
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 24, 2016 · VIOLATION DISMISSED
  • B
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PAINT STOCK CLOSET DOORS THRU OUT 9 STY APT 9R , SECTION '' ''
    Oct 12, 1995 · #9R · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING WEST BATHROOM 11 STY EAST APT 11A. , SECTION '' ''
    Apr 8, 1994 · #11A · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILINGS 11 STY EAST APT 11A SOUTHWEST BATHROOM. , SECTION '' ''
    Apr 8, 1994 · #11A · NOV SENT OUT
DOB permits (last 30)
  • OTMay 17, 2006
    9J BUILDERS INC
  • EQJul 11, 2000
    PINKY NAIL FIRST CORP
  • OTJun 16, 2000
    DL COMPETON
  • OTOct 1, 1999
    NOVA RESTORATION, INC
  • EQAug 19, 1994
    COLGATE SCAFFOLDING
  • PLAug 26, 1992
    PSG PLG.CO.INC
  • OTNov 1, 1991
    SC CONST.INC.
  • PLJun 15, 1990
    D&L PLUMBING + HEATING
  • OTJun 12, 1990
    ISSEKS BROTHERS INC
  • MH-
    COLOR DESIGN BUILDERS LLC
  • PL-
    SAMUEL & SONS P & H INC
  • MH-
    G GARRITY CONTRACTING COR
  • OT-
    RED HOOK DESIGN LLC
  • OT-
    OUR ASSOCIATES I CORP
  • OT-
    PIRO CONSTRUCTION CORP
  • OT-
    CARLOS A ORTIZ
  • OT-
    G GARRITY CONTRACTING COR
  • PL-
    M BURTON P & H CORP
  • MH-
    DEMO CUSTOM CABINETS,INC
  • PL-
    INTERCITY PLBG & HTG CORP
  • PL-
    KORBL & SONS INC.
  • PL-
    C &Z MECHANICAL P & H INC
  • PL-
    ALL PHASE PLBG & HTG
  • PL-
    B.H.I. INC
  • OT-
    NOVA RESTORATION LLC
  • PL-
    WYNNE PLBG HEATING CORP
  • OT-
    NOVA RESTORATION LLC
  • EQ-
    NOVA RESTORATION LLC
  • PL-
    JULIAN PLBG & HTG CORP
  • OT-
    SOHOME WORK INC
DOB violations
  • May 15, 2025C-CONSTRUCTION OTHER OPTIONAL
  • Apr 3, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Mar 21, 2024C-CONSTRUCTION OTHER OPTIONAL
  • Mar 20, 2024AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 22, 2023FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Oct 22, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jul 23, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 23, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 22, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jul 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jul 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 21, 2018FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1012370017

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Feb 17, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
282 permits in the current corpus · latest record May 17, 2006

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
13 violations in the current corpus · latest record Jan 30, 2020

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
154 violations in the current corpus · latest record Jul 23, 2026

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.