CurbScoop
CurbScoop›Buildings›Upper West Side›215 WEST 88 STREET

215 WEST 88 STREET

Manhattan· Upper West Side· built 1915class RMBBL 1012367502
Open listing source

215 WEST 88 STREET is a 92-unit building in Upper West Side, Manhattan, built in 1915.

4 units are on the market here right now.

City records show 30 DOB permits and 72 open violations on file.

Units (res)
92
Floors
12.0
Lot ft²
17,624 ft²
Bldg ft²
147,241 ft²
Assessed
$26.1M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
215 West 88th Street #2B
Manhattan · built 1915
Upper West Side$1.50M$1,4011,067 ft²2 bd · 1 ba-161
17 HPD-C4 DOBbedbugrodent
35.9Source
215 WEST 88 STREET #5B
Manhattan · built 1915
Upper West Side$1.59M$1,4951,067 ft²2 bd · 1 ba-77
17 HPD-C4 DOBbedbugrodent
35.9Source
215 West 88th Street #6E
Manhattan · built 1915
Upper West Side$2.69M$1,7481,542 ft²3 bd · 2 ba-128
17 HPD-C4 DOBbedbugrodent
35.9Source
215 WEST 88 STREET #1A
Manhattan · built 1915
Upper West Side$749K$970772 ft²1 bd · 1 ba-29
17 HPD-C4 DOBbedbugrodent
35.9Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AND WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Mar 10, 2019 · #12A · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APROX. 1 SQ FT) IN THE KITCHEN LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 12952176 ISSUED 10-MAR-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE ''27-2017.3a(3)(a) or (b).
    Mar 10, 2019 · #12A · DEFECT LETTER ISSUED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Mar 10, 2019 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE KITCHEN LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Mar 10, 2019 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AND NORTH WALL IN THE KITCHEN LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Mar 10, 2019 · #12A · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APROX. 1 SQ FT) IN THE KITCHEN LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Mar 10, 2019 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Mar 10, 2019 · #12A · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 31, 2019 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 31, 2019 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS INSIDE CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 31, 2019 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE KITCHEN LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 31, 2019 · #12A · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jan 31, 2019 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING AN APPRX 4 SQUARE FEET IN THE KITCHEN LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 4, 2018 · #12A · DEFECT LETTER ISSUED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WALL CABINETS AT WEST WALL IN THE KITCHEN LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 4, 2018 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE BATHROOM LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 4, 2018 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 4, 2018 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 4, 2018 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 4, 2018 · #12A · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 4, 2018 · #12A · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 4, 2018 · #12A · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 12A, 12th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 4, 2018 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & WALLS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Aug 14, 2017 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & WALLS IN THE BATHROOM LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Aug 14, 2017 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jul 10, 2017 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE BATHROOM LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jul 10, 2017 · #12A · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jul 10, 2017 · #12A · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jul 10, 2017 · #12A · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jul 10, 2017 · #12A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE BATHROOM LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Jul 10, 2017 · #12A · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORY
    Jul 5, 2017 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM . NO SIGN POSTED , 1st STORY
    Jul 5, 2017 · VIOLATION CLOSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER., 1st STORY
    Jul 5, 2017 · VIOLATION CLOSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING., 1st STORY
    Jul 5, 2017 · VIOLATION CLOSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX . NO SIGN POSTED , 1st STORY
    Jul 5, 2017 · VIOLATION CLOSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. , 1st STORY
    Jul 5, 2017 · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD., 1st STORY
    Jul 5, 2017 · VIOLATION CLOSED
  • B
    § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 10E, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Jun 20, 2017 · #10E · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH, WEST AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 12A, 12th STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 9, 2017 · #12A · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH, WEST AND EAST WALLS. IN THE 1st ROOM FROM NORTH LOCATED AT APT 12A, 12th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 9, 2017 · #12A · VIOLATION CLOSED
  • B
    SECTION 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION OF WASTE PIPE UNDER WASH BASIN IN THE BATHROOM LOCATED AT APT 12F, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Mar 18, 2013 · #12F · VIOLATION CLOSED
DOB permits (last 30)
  • Mechanical SystemsSep 16, 2026
    BOBBY J. ENTERPRISE INC
  • General ConstructionAug 4, 2026
    BOBBY J. ENTERPRISE INC
  • PlumbingJul 30, 2026
    FIVE STAR P AND H CO, INC
  • PlumbingJun 12, 2026
    NEW YORK PARK PLBG&HTG CO
  • General ConstructionJun 12, 2026
    MATADOR ENTERPRISE INC
  • Mechanical SystemsMay 30, 2025
    BLUESTONE CONSTRUCTION AN
  • General ConstructionMay 2, 2025
    BLUESTONE CONSTRUCTION AN
  • PlumbingMay 2, 2025
    PLUMBING WORKS CORP
  • Mechanical SystemsMar 10, 2025
    BLUESTONE CONSTRUCTION AN
  • PlumbingNov 26, 2024
    PLUMBING WORKS CORP
  • General ConstructionNov 26, 2024
    TLD SERVICES INC
  • General ConstructionNov 26, 2024
    BLUESTONE CONSTRUCTION AN
  • General ConstructionJul 1, 2024
    BLUESTONE CONSTRUCTION AN
  • PlumbingJul 1, 2024
    OSSO PLUMBING & HEATING
  • General ConstructionJul 1, 2024
    TAURUS CONSTRUCTION GROUP
  • PlumbingJul 1, 2024
    NEW YORK PARK PLBG&HTG CO
  • Mechanical SystemsJun 18, 2024
    BLUESTONE CONSTRUCTION AN
  • General ConstructionMay 6, 2024
    TAURUS CONSTRUCTION GROUP
  • PlumbingMay 3, 2024
    NEW YORK PARK PLBG&HTG CO
  • Mechanical SystemsMay 3, 2024
    TAURUS CONSTRUCTION GROUP
  • Mechanical SystemsJan 18, 2024
    TAURUS CONSTRUCTION GROUP
  • General ConstructionJan 16, 2024
    TAURUS CONSTRUCTION GROUP
  • PlumbingJan 12, 2024
    NEW YORK PARK PLBG&HTG CO
  • SprinklersOct 12, 2023
    PLUMBING WORKS CORP
  • General ConstructionOct 12, 2023
    ICS BUILDERS, INC
  • PlumbingJul 26, 2023
    NEW YORK PARK PLBG&HTG CO
  • Mechanical SystemsJul 19, 2023
    TAURUS CONSTRUCTION GROUP
  • General ConstructionJul 12, 2023
    TAURUS CONSTRUCTION GROUP
  • Mechanical SystemsSep 3, 2021
    TAURUS CONSTRUCTION CORP
  • PlumbingSep 2, 2021
    NEW YORK PARK PLBG&HTG CO
DOB violations
  • Oct 14, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 14, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 14, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 24, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 24, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 24, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 24, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 24, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 17, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 30, 2013E-ELEVATOR ELEVATORREQUIRED
  • Apr 30, 2013E-ELEVATOR ELEVATORREQUIRED
  • Apr 30, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 1, 2013LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Mar 22, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 22, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 22, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2010E-ELEVATOR ELEVATORREQUIRED
  • Aug 25, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Dec 19, 2008C-CONSTRUCTION OTHER OPTIONAL
  • Dec 19, 2008C-CONSTRUCTION OTHER OPTIONAL

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1012367502

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Jul 28, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
163 permits in the current corpus · latest record Sep 22, 2026

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
80 violations in the current corpus · latest record Oct 3, 2022

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
32 violations in the current corpus · latest record Nov 8, 2021

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.