CurbScoop
CurbScoop›Buildings›Upper West Side›480 WEST END AVENUE

480 WEST END AVENUE

Manhattan· Upper West Side· built 1913class D4BBL 1012310001

480 WEST END AVENUE is a 67-unit building in Upper West Side, Manhattan, built in 1913.

1 unit is on the market here right now.

City records show 30 DOB permits and 55 open violations on file.

Units (res)
67
Floors
12.0
Lot ft²
13,750 ft²
Bldg ft²
140,076 ft²
Assessed
$13.0M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
490 WEST END AVENUE #3D
Manhattan · built 1913
Upper West Side$2.60M$1,2982,000 ft²3 bd · 3 ba-43
4 HPD-C5 DOBbedbug
14.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT THC, 13th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 10, 2024 · #THC · VIOLATION DISMISSED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT THC, 13th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 10, 2024 · #THC · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL AND EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT PHC, 1st APARTMENT FROM WEST AT NORTH
    Jun 17, 2022 · #PHC · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOOD SADDLE AT THE DOOR TO THE TERRACE IN THE 5th ROOM FROM NORTH LOCATED AT APT PHC, 1st APARTMENT FROM WEST AT NORTH
    Jun 17, 2022 · #PHC · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 5th ROOM FROM NORTH LOCATED AT APT PHC, 1st APARTMENT FROM WEST AT NORTH
    Jun 17, 2022 · #PHC · NOV SENT OUT
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING HOOK AND EYE AT THE DOOR TO THE ROOF AT 1st PUBLIC HALL BULKHEAD FROM NORTH
    Jun 17, 2022 · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
    Jun 17, 2022 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Jun 17, 2022 · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Jun 17, 2022 · VIOLATION DISMISSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.
    Jun 17, 2022 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Jun 17, 2022 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY
    Jun 17, 2022 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Jun 17, 2022 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN WINDOW FRAME AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT PHC, 1st APARTMENT FROM WEST AT NORTH
    Jun 17, 2022 · #PHC · NOV SENT OUT
  • A
    SECTION 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCY?S HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Jun 4, 2015 · VIOLATION CLOSED
DOB permits (last 30)
  • General ConstructionJun 11, 2026
    ADRIATIC PLUMBING & HEATI
  • PlumbingJun 9, 2026
    ADRIATIC PLBG & HTG CORP
  • PlumbingApr 27, 2026
    BK PLUMBING & HEATING CORP
  • General ConstructionApr 1, 2026
    PETER DI NATALE & ASSOC I
  • PlumbingNov 5, 2025
    CERTIFIED SERVICES AND
  • General ConstructionOct 29, 2025
    HELLO CHAPTER LLC
  • PlumbingMay 9, 2025
    ADRIATIC PLBG & HTG CORP
  • PlumbingDec 18, 2024
    EVERYDAY MECHANICAL CORP
  • General ConstructionDec 18, 2024
    XINOS CONSTRUCTION CORP
  • Mechanical SystemsDec 10, 2024
    AIRTRONICS AIR COND CORP
  • General ConstructionNov 14, 2024
    QUAD CONTRACTING LLC
  • General ConstructionJul 29, 2024
    ANTAR GROUP LLC
  • PlumbingJun 11, 2024
    P.S.I. MECHANICAL
  • Sidewalk ShedMar 29, 2023
    SKYLINE SCAFFOLDING GROUP
  • Sidewalk ShedMar 29, 2023
    SKYLINE SCAFFOLDING GROUP
  • Supported ScaffoldOct 5, 2022
    ROCKLEDGE SCAFFOLD CORP
  • PlumbingMay 16, 2022
    BYPASS MECHANICAL CORP
  • PlumbingMay 16, 2022
    ORBIT PLBG & HTG INC
  • General ConstructionMay 16, 2022
    TOLMAC CONCEPTS INC
  • General ConstructionMay 16, 2022
    ZOOM CONTRACTING INC
  • General ConstructionMay 16, 2022
    TOLMAC CONCEPTS INC
  • Mechanical SystemsNov 4, 2021
    WMG RENOVATION CORP
  • General ConstructionNov 1, 2021
    WMG RENOVATION CORP
  • PlumbingSep 29, 2021
    ORBIT PLBG & HTG INC
  • PlumbingJul 15, 2021
    ALPINE REFRIGERATION CO
  • Mechanical SystemsJul 2, 2021
    SUNRISE RENOVATION INC
  • Mechanical SystemsJul 2, 2021
    SUNRISE RENOVATION INC
  • PlumbingJun 28, 2021
    HOD PIPING & HEATING CORP
  • PlumbingJun 28, 2021
    HOD PIPING & HEATING CORP
  • General ConstructionMay 27, 2021
    DIVISION ONE CONST CORP
DOB violations
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jun 19, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jun 19, 2015E-ELEVATOR ELEVATORREQUIRED
  • Oct 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Oct 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 22, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 26, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 28, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 28, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 28, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 27, 2007E-ELEVATOR ELEVATORREQUIRED
  • Dec 27, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2007L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Mar 6, 2007E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 2007E-ELEVATOR ELEVATORREQUIRED
  • Oct 3, 2005E-ELEVATOR ELEVATORREQUIRED
  • Oct 3, 2005E-ELEVATOR ELEVATORREQUIRED
  • Oct 21, 2004E-ELEVATOR ELEVATORREQUIRED
  • Oct 21, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 28, 2004CMQ-MARQUEE OTHER REQUIRED
  • Oct 21, 2003E-ELEVATOR ELEVATORREQUIRED
  • Oct 21, 2003E-ELEVATOR ELEVATORREQUIRED
  • Jan 5, 2001E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2000E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2000E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2000CMQ-MARQUEE OTHER REQUIRED
  • Jan 13, 2000CMQ-MARQUEE OTHER REQUIRED
  • Feb 19, 1999CMQ-MARQUEE OTHER REQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1012310001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 13, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
195 permits in the current corpus · latest record Jul 14, 2026

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
15 violations in the current corpus · latest record Apr 1, 2024

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
46 violations in the current corpus · latest record Oct 11, 2022

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.