CurbScoop
CurbScoopBuildingsUpper West Side541 AMSTERDAM AVENUE

541 AMSTERDAM AVENUE

Manhattan· Upper West Side· built 1918class D4BBL 1012170064
Open listing source

541 AMSTERDAM AVENUE is an 86-unit building in Upper West Side, Manhattan, built in 1918.

2 units are on the market here right now.

City records show 30 DOB permits and 58 open violations on file.

Units (res)
86
Floors
13.0
Lot ft²
12,250 ft²
Bldg ft²
117,216 ft²
Assessed
$13.7M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
176 WEST 87 STREET #5C
Manhattan · built 1918
Upper West Side$2.00M-0 ft²2 bd · 1 ba-79
3 HPD-C8 DOBbedbug
14.9Source
176 WEST 87 STREET #MD
Manhattan · built 1918
Upper West Side$699K-0 ft²1 bd · 1 ba-143
3 HPD-C8 DOBbedbug
14.9Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 15, 2022 · VIOLATION DISMISSED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH AT EAST WALL IN THE KITCHEN LOCATED AT APT 1A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 20, 2020 · #1A · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 20 SQ FT AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 20, 2020 · #1A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 1A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 20, 2020 · #1A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING DEVICE AT SECONDARY EGRESS DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 20, 2020 · #1A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE AT UPPER AND LOWER SASH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 20, 2020 · #1A · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WLLS IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 20, 2020 · #1A · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Feb 13, 2020 · NOV SENT OUT
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Feb 13, 2020 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT PUBLIC HALL, 1st STORY
    Feb 13, 2020 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Feb 13, 2020 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY
    Feb 13, 2020 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Feb 13, 2020 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT BOILER ROOM DOOR AND AT PUBLIC HALL, 1st STORY
    Feb 13, 2020 · NOV SENT OUT
  • C
    § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 3, 2005 · #2F · DEFECT LETTER ISSUED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE AND/OR MAKE OPERABLE WINDOWS THRU OUT 2 STY NORTHWEST APT 1A. , SECTION '' ''
    Jul 8, 1999 · #1A · NOT COMPLIED WITH
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR WEST ROOM AND PRIVATE HALL 2 STY NORTHWEST APT 1A. , SECTION '' ''
    Jul 8, 1999 · #1A · NOT COMPLIED WITH
  • A
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE DOOR KNOB NORTHEAST ROOM 2 STY NORTHEAST APT 2A NORTH SECTION. , SECTION '' ''
    Feb 11, 1991 · #2A · VIOLATION CLOSED
DOB permits (last 30)
  • EQDec 28, 2004
    PHOENIX BRIDGING INC
  • PLFeb 27, 2003
  • EQNov 3, 1997
    ROCKLEDGE SCAFFOLD
  • FPSep 11, 1992
    RELIABLE FIRE PROTECTION
  • OT-
    PHOENIX CONSTRUCTION INC
  • PL-
    L.L.G. PLBG & HTG INC
  • EQ-
    PHOENIX BRIDGING INC
  • MH-
    SHELLCO INC
  • FP-
    SENTINEL FIRE SAFETY CORP
  • OT-
    H & D MAINTENANCE CO INC
  • OT-
    VENUS CONSTRUCTION LTD
  • OT-
    EVAN LONG ISLAND PAINT CO
  • OT-
    A.W.P. CORPORATION
  • PL-
    EMR MECHANICAL CORP
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    SHELLCO INC
  • OT-
    KONG'S CARPENTERS MANAGEM
  • PL-
    COCHRANE PLBG & HTG
  • PL-
    P.S.I. MECHANICAL
  • FP-
    FIRE ZONE VENT & SUPP INC
  • OT-
    BRICK BY BRICK CONSTRUCTI
  • MH-
    BRICK BY BRICK CONSTRUCTI
  • OT-
    ALTZ GROUP INC
  • PL-
    SPARTAKUS PLBG & HTG INC
  • FP-
    RELIABLE FIRE PROT.
  • MH-
    PASHA GROUP INC
  • OT-
    PASHA GROUP INC
  • PL-
  • OT-
    UNITED CONSTRUCTION WEATHERPROOF
  • EQ-
    ALTZ GROUP INC
DOB violations
  • Dec 1, 2023EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • May 28, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 28, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 28, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 13, 2018E-ELEVATOR ELEVATORREQUIRED
  • May 25, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 25, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 25, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jun 3, 2014E-ELEVATOR ELEVATORREQUIRED
  • Mar 1, 2013LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Oct 3, 2012AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Mar 27, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 27, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 27, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 24, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 27, 2011E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Feb 2, 2009C-CONSTRUCTION OTHER OPTIONAL
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jul 25, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 25, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Dec 18, 2007E-ELEVATOR ELEVATORREQUIRED
  • Dec 18, 2007E-ELEVATOR ELEVATORREQUIRED
  • Dec 18, 2007E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Oct 11, 2005E-ELEVATOR ELEVATORREQUIRED
  • Oct 11, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jun 13, 2005E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2005LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Oct 14, 2004E-ELEVATOR ELEVATORREQUIRED
  • Oct 14, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2004E-ELEVATOR ELEVATORREQUIRED
  • Mar 19, 2003E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2002E-ELEVATOR ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1012170064

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Jun 13, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
164 permits in the current corpus · latest record Dec 30, 2004

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
18 violations in the current corpus · latest record Feb 18, 2022

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
47 violations in the current corpus · latest record Mar 17, 2026

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.