CurbScoop
CurbScoopBuildingsUpper West Side110 WEST 86 STREET

110 WEST 86 STREET

Manhattan· Upper West Side· built 1929class RMBBL 1012167502
Open listing source

110 WEST 86 STREET is a 79-unit building in Upper West Side, Manhattan, built in 1929.

4 units are on the market here right now.

City records show 30 DOB permits and 77 open violations on file.

Units (res)
79
Floors
16.5
Lot ft²
8,043 ft²
Bldg ft²
76,805 ft²
Assessed
$11.1M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
110 WEST 86 STREET #9B
Manhattan · built 1929
Upper West Side$1.79M$1,6131,113 ft²2 bd · 2 ba-43
14 HPD-C7 DOBbedbug
31.9Source
110 WEST 86 STREET #5A
Manhattan · built 1929
Upper West Side$1.90M$1,3931,360 ft²3 bd · 2 ba-64
14 HPD-C7 DOBbedbug
31.9Source
110 WEST 86 STREET #5A
Manhattan · built 1929
Upper West Side$1.90M$1,3811,372 ft²3 bd · 2 ba-71
14 HPD-C7 DOBbedbug
31.9Source
110 WEST 86 STREET #7E
Manhattan · built 1929
Upper West Side$885K$1,155766 ft²1 bd · 1 ba-66
14 HPD-C7 DOBbedbug
31.9Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ...HARD WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • A
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • B
    § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS ...DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ...WOOD BASE WASHBASIN CABINET IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS ...AT SHOWER STALL IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • B
    § 27-2005 HMC: REFIT ...DOOR LEADING TO TERRACE IN THE 1st ROOM FROM EAST LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... ...LESS THAN 10 SQ.F AT CEILING IN CLOSET AT WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ...AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ...LIGHT FIXTURE AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ...MECHANICAL VENTILATION SYSTEM AT CEILING IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS ...AT WASHBASIN IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ...CERAMIC FLOOR TILES IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ...CERAMIC TILES AT WEST WALL IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • B
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ...HARD WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ...AT NORTH AND EAST WALLS IN THE KITCHEN LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · NOT COMPLIED WITH
  • B
    § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES ...DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Feb 25, 2026 · #A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Sep 1, 2025 · #A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD CABINET AT WASH BASIN IN THE 2nd BATHROOM FROM EAST LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Sep 1, 2025 · #A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Sep 1, 2025 · #A · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Sep 1, 2025 · #A · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT EAST WALL IN THE KITCHEN LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Sep 1, 2025 · #A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Sep 1, 2025 · #A · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .... IN THE 2nd BATHROOM FROM EAST LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Sep 1, 2025 · #A · NOT COMPLIED WITH
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE EAST AND NORTH WALL IN THE KITCHEN LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Sep 1, 2025 · #A · NOT COMPLIED WITH
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COUNTER TOP AT SINK IN THE KITCHEN LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Sep 1, 2025 · #A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE SOUTH AND NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT PENTHOUSE A, 17th STORY, 1st PENTHOUSE FROM WEST AT NORTH
    Sep 1, 2025 · #A · NOT COMPLIED WITH
  • A
    § 27-2014 ADM CODE PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EXTERIOR WINDOW FRAMES AND SASHES AT EAST 1 AND EAST 2 WINDOWS IN THE TERRACE LOCATED AT PENTHOUSE B, 1st PENTHOUSE FROM EAST AT SOUTH
    Jun 30, 2021 · #B · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WOOD FRAME CASING AT DOOR IN THE TERRACE LOCATED AT PENTHOUSE B, 1st PENTHOUSE FROM EAST AT SOUTH
    Jun 30, 2021 · #B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FRAME CASING AT DOOR IN THE TERRACE LOCATED AT PENTHOUSE B, 1st PENTHOUSE FROM EAST AT SOUTH
    Jun 30, 2021 · #B · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 17th STORY
    Jun 30, 2021 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 17th STORY
    Jun 30, 2021 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE DECORATIVE WOOD MOLDING AROUND FRAME AT CEILING LIGHT FIXTURE AT PUBLIC HALL, 17th STORY
    Jun 30, 2021 · VIOLATION CLOSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 10, 2018 · VIOLATION DISMISSED
  • A
    SECTION 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCY?S HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    May 19, 2015 · VIOLATION CLOSED
  • C
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 17C, 16th STORY
    Apr 22, 2015 · #17C · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 17C, 16th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Apr 22, 2015 · #17C · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH AND SOUTH WALLS IN THE KITCHEN LOCATED AT APT 17C, 16th STORY
    Apr 22, 2015 · #17C · VIOLATION CLOSED
  • C
    SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT STEAM RISER SOUTH BATHROOM 11 STY NORTH APT 11A ER1 LOCATED AT APT 11A
    Mar 7, 1994 · #11A · VIOLATION CLOSED
  • C
    SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WOODWORK WOOD DOOR FRAMES & WINDOW FRAMES THRU OUT 11 STY NORTH APT 11A LOCATED AT APT 11A
    Mar 7, 1994 · #11A · VIOLATION CLOSED
DOB permits (last 30)
  • OTMay 16, 2013
    C C CONTROLLED COMBUSTION
  • OT-
    SKYLINE RESTORATION INC
  • EQ-
    SPRING ENTERPRIS INC.
  • OT-
    UNITED CHIMNEY CORP
  • EQ-
    BREND RENOVATION CORP
  • EQ-
    BREND RENOVATION CORP
  • OT-
    SKYLINE RESTORATION INC
  • OT-
    BREND RENOVATION CORP
  • EQ-
    SPRING SCAFFOLDING
  • EQ-
    COLGATE SCAFFOLDING
  • OT-
    P.STRAUCH CONSTRUCTION CORP.
  • OT-
    RESTORE IT INC
  • EQ-
    COLGATE SCAFFOLDING
  • OT-
    L & M LARJO CO.,INC.
  • OT-
    NOVA RESTORATION OF NY IN
  • EQ-
    NOVA RESTORATION OF NY IN
  • FS-
    C C CONTROLLED COMBUSTION
  • FB-
    C C CONTROLLED COMBUSTION
  • PL-
    CC CONTROLLED PLBG CO INC
  • OT-
    C C CONTROLLED COMBUSTION
  • FS-
    C C CONTROLLED COMBUSTION
  • PL-
    CC CONTROLLED PLBG CO INC
  • FB-
    C C CONTROLLED COMBUSTION
  • OT-
    REAL DEAL DECORATION LLC
  • PL-
    CARRERAS HOME IMPROV INC
  • EQ-
    BRIDGWORKS INC
  • PL-
    DEMAR PLUMBING CORP
  • OT-
    L&M LARJO
  • OT-
    L & M LARJO CO.,INC.
  • EQ-
    NOVA RESTORATION OF NY IN
DOB violations
  • May 31, 2021FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • May 19, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jul 2, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 18, 2013E-ELEVATOR ELEVATORREQUIRED
  • Apr 18, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 21, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 21, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 24, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jul 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jul 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 7, 2007E-ELEVATOR ELEVATORREQUIRED
  • Mar 7, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jan 19, 2007LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 26, 2006LANDMK-LANDMARK NONE
  • Jan 6, 2006LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Oct 5, 2005E-ELEVATOR ELEVATORREQUIRED
  • Oct 5, 2005E-ELEVATOR ELEVATORREQUIRED
  • Oct 7, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 8, 2004E-ELEVATOR ELEVATORREQUIRED
  • Jan 8, 2004E-ELEVATOR ELEVATORREQUIRED
  • Apr 18, 2003LANDMK-LANDMARK NONE
  • Jan 22, 2002E-ELEVATOR ELEVATORREQUIRED
  • Jan 9, 2001LANDMK-LANDMARK NONE
  • Oct 23, 1998LANDMK-LANDMARK NONE
  • Aug 17, 1988E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 1987E-ELEVATOR ELEVATORREQUIRED
  • Aug 16, 1985LL10/81-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Apr 3, 1985E-ELEVATOR ELEVATORREQUIRED
  • Mar 19, 1982E-ELEVATOR ELEVATORREQUIRED
  • Sep 9, 1976E-ELEVATOR ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 13, 2026

Stable property ID: nyc:bbl:1012167502

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Jun 25, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
73 permits in the current corpus · latest record May 17, 2013

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
51 violations in the current corpus · latest record Apr 8, 2026

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
37 violations in the current corpus · latest record May 31, 2021

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.