CurbScoop
CurbScoop›Buildings›Upper West Side›225 CENTRAL PARK WEST

225 CENTRAL PARK WEST

Manhattan· Upper West Side· built 1926class D4BBL 1011960029
Open listing source

225 CENTRAL PARK WEST is a 338-unit building in Upper West Side, Manhattan, built in 1926.

4 units are on the market here right now.

City records show 30 DOB permits and 62 open violations on file.

Units (res)
338
Floors
16.0
Lot ft²
20,325 ft²
Bldg ft²
245,676 ft²
Assessed
$24.0M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
225 CENTRAL PARK WEST #916
Manhattan · built 1926
Upper West Side$449K-0 ft²studio · 1 ba-108
4 HPD-C16 DOBbedbug
20.7Source
225 CENTRAL PARK WEST #905
Manhattan · built 1926
Upper West Side$3.29M-0 ft²2 bd · 3 ba-87
4 HPD-C16 DOBbedbug
20.7Source
225 CENTRAL PARK WEST #619
Manhattan · built 1926
Upper West Side$499K-0 ft²studio · 1 ba-131
4 HPD-C16 DOBbedbug
20.7Source
225 CENTRAL PARK WEST #412
Manhattan · built 1926
Upper West Side$425K-0 ft²studio · 1 ba-43
4 HPD-C16 DOBbedbug
20.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 25, 2019 · VIOLATION DISMISSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT PUBLIC HALL, 1st STORY
    Oct 8, 2019 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY
    Oct 8, 2019 · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Oct 8, 2019 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Oct 8, 2019 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGN MISSING AT PUBLIC HALL, 1st STORY
    Oct 8, 2019 · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Oct 8, 2019 · VIOLATION DISMISSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 1010, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHEAST
    Apr 24, 2019 · #1010 · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1010, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Apr 24, 2019 · #1010 · VIOLATION CLOSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1010, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Apr 24, 2019 · #1010 · VIOLATION CLOSED
  • C
    § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 1010, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHEAST
    Apr 24, 2019 · #1010 · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 1010, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHEAST
    Apr 24, 2019 · #1010 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1010, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHEAST
    Apr 24, 2019 · #1010 · VIOLATION DISMISSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 1010, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHEAST
    Apr 24, 2019 · #1010 · VIOLATION DISMISSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING. IN THE ENTIRE APARTMENT LOCATED AT APT 402, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Jan 30, 2017 · #402 · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING. IN THE ENTIRE APARTMENT LOCATED AT APT 402, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH
    Jan 30, 2017 · #402 · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE REFIT WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 515, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Feb 12, 2011 · #515 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 515, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 14, 2010 · #515 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 214, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH
    Feb 20, 2010 · #214 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 515, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Feb 3, 2006 · #515 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER AND LOWER SASH COUNTER BLANCE AT WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 515, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
    Feb 3, 2006 · #515 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE RADIATOR IN THE BATHROOM LOCATED AT APT 706, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 29, 2004 · #706 · VIOLATION CLOSED
DOB permits (last 30)
  • PlumbingMay 18, 2026
    MCMANUS MECH MAINT P&H IN
  • PlumbingApr 29, 2026
    MCMANUS MECH MAINT P&H IN
  • Mechanical SystemsFeb 20, 2026
    MICHAEL G O'MARA
  • General ConstructionJan 7, 2026
    MICHAEL G O'MARA
  • StructuralAug 22, 2025
    C.A.C. INDUSTRIES, INC
  • General ConstructionJan 22, 2025
    BALOG CONSTRUCTION LLC
  • PlumbingJan 22, 2025
    NICE PLUMBING CORP
  • PlumbingSep 26, 2024
    HYDROKINETIC PLBG & HTG I
  • Mechanical SystemsSep 18, 2024
    GALLERY RESTORATION LTD
  • PlumbingFeb 13, 2024
    XPRESS PLBG AND HTG LLC
  • General ConstructionFeb 13, 2024
    K&N TILING & HOME IMPROVE
  • PlumbingNov 8, 2023
    NICE PLUMBING CORP
  • Mechanical SystemsOct 2, 2023
    BNY CONSTRUCTION INC
  • PlumbingSep 27, 2023
    Z.W. PLBG & HTG CORP
  • General ConstructionSep 27, 2023
    BNY CONSTRUCTION INC
  • General ConstructionSep 23, 2023
    BALOG CONSTRUCTION LLC
  • General ConstructionSep 12, 2023
    FIVE STARS AWNINGS & SIGN
  • Supported ScaffoldAug 25, 2023
    CEPRINE CONSTRUCTION INC
  • Mechanical SystemsJun 5, 2023
    BALOG CONSTRUCTION LLC
  • General ConstructionMar 13, 2023
    HIGH QUALITY CONSTRUCTION
  • General ConstructionFeb 14, 2023
    BALOG CONSTRUCTION LLC
  • PlumbingFeb 6, 2023
    NICE PLUMBING CORP
  • Protection and Mechanical MethodsSep 16, 2022
    AM&G WATERPROOFING LLC
  • Protection and Mechanical MethodsSep 16, 2022
    AM&G WATERPROOFING LLC
  • PlumbingAug 17, 2022
    NICE PLUMBING CORP
  • Supported ScaffoldAug 11, 2022
    CEPRINE CONSTRUCTION INC
  • Supported ScaffoldAug 11, 2022
    CEPRINE CONSTRUCTION INC
  • General ConstructionAug 9, 2022
    BALOG CONSTRUCTION LLC
  • Mechanical SystemsJul 22, 2022
    BALOG CONSTRUCTION LLC
  • Mechanical SystemsJul 22, 2022
    BALOG CONSTRUCTION LLC
DOB violations
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jul 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 10, 2018C-CONSTRUCTION OTHER OPTIONAL
  • Nov 10, 2018LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • May 16, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 16, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 16, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 16, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 16, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2015E-ELEVATOR ELEVATORREQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 20, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 20, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 20, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 20, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 20, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 10, 2013E-ELEVATOR ELEVATORREQUIRED
  • Apr 10, 2013E-ELEVATOR ELEVATORREQUIRED
  • Apr 10, 2013E-ELEVATOR ELEVATORREQUIRED
  • Apr 10, 2013E-ELEVATOR ELEVATORREQUIRED
  • Apr 10, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Mar 23, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 23, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 23, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 23, 2012E-ELEVATOR ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1011960029

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Jul 6, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
600 permits in the current corpus · latest record Sep 10, 2026

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
22 violations in the current corpus · latest record Mar 9, 2026

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
81 violations in the current corpus · latest record Oct 24, 2023

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.