CurbScoop
CurbScoopBuildingsLincoln Square1 WEST END AVENUE

1 WEST END AVENUE

Manhattan· Lincoln Square· built 2014class RMBBL 1011717511
Open listing source

1 WEST END AVENUE is a 361-unit building in Lincoln Square, Manhattan, built in 2014.

2 units are on the market here right now.

City records show 27 DOB permits and 79 open violations on file.

Units (res)
361
Floors
43.0
Lot ft²
72,099 ft²
Bldg ft²
752,143 ft²
Assessed
$143.7M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
1 WEST END AVENUE #11E
Manhattan · built 2014
Lincoln Square$1.90M$1,7791,067 ft²1 bd · 1 ba-40
16 HPD-C4 DOBbedbug
39.6Source
1 WEST END AVE #19J
Manhattan · built 2014
Lincoln Square$3.50M$2,3301,500 ft²2 bd · 2 ba-56
16 HPD-C4 DOBbedbug
39.6Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
    Jul 8, 2026 · #4H · VIOLATION OPEN
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
    Jul 8, 2026 · #4H · VIOLATION OPEN
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
    Jul 8, 2026 · #4H · VIOLATION OPEN
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 8, 2026 · #4B · VIOLATION OPEN
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT STOVE/RANGE IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Jun 5, 2026 · #2G · VIOLATION OPEN
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Jun 5, 2026 · #6E · VIOLATION OPEN
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Jun 5, 2026 · #2G · VIOLATION OPEN
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE/STOVE IN THE KITCHEN LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
    Jun 5, 2026 · #6E · VIOLATION OPEN
  • A
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRCAL WIRE AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5J, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Feb 27, 2026 · #5J · CIV14 MAILED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 6L, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Feb 27, 2026 · #6L · VIOLATION DISMISSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW SASH HANDLE AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 7U, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Feb 27, 2026 · #7U · NOV CERTIFIED ON TIME
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RADIATOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6L, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Feb 27, 2026 · #6L · NOV CERTIFIED ON TIME
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING DOOR SWEEP AT STAIR DOOR 'D' AT PUBLIC HALL STAIRS, 7th STORY, SECTION AT WEST
    Feb 27, 2026 · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW SASH HANDLE AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 7U, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST
    Feb 27, 2026 · #7U · CIV14 MAILED
  • B
    § 27-2005 HMC: REFIT UPPER AND LOWER SASH AT WINDOW FIRST FROM WEST AT NORTH IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2K, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
    Sep 1, 2025 · #2K · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6C, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Sep 1, 2025 · #6C · VIOLATION DISMISSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AT BUILDING ENTRANCE , 1st STORY
    Sep 1, 2025 · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WALL CABINET AT WEST IN THE KITCHEN LOCATED AT APT 2K, 2nd STORY, 5th APARTMENT FROM SOUTH AT WEST
    Jun 24, 2025 · #2K · VIOLATION DISMISSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Sep 11, 2024 · #5F · VIOLATION CLOSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 17261978 ISSUED 11-SEP-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Sep 11, 2024 · #5F · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ... ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5J, 5th STORY
    May 31, 2024 · #5J · VIOLATION CLOSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING, APPROX 6 SQ FT IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH
    May 8, 2024 · #4K · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE PRIVATE HALLWAY LOCATED AT APT 7U, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST
    May 8, 2024 · #7U · VIOLATION CLOSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW HANDLE IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 7U, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST
    May 8, 2024 · #7U · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING OUTLET COVER AT SOUTH WALL IN THE 1st ROOM FROM EAST AT CENTER LOCATED AT APT 7U, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST
    May 8, 2024 · #7U · VIOLATION CLOSED
  • A
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE FOYER LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 6, 2023 · #2C · VIOLATION DISMISSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT COMPACTOR CLOSET, 5th STORY
    Oct 4, 2023 · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3V, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 30, 2023 · #3V · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST AND NORTH WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 3V, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 30, 2023 · #3V · VIOLATION CLOSED
  • B
    § 27-2005 HMC: REFIT CASEMENT WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT 3V, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 28, 2023 · #3V · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .... IN THE ENTRANCE LOCATED AT APT 3V, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
    Feb 17, 2023 · #3V · VIOLATION WILL BE REINSPECTED
  • B
    § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT CLOSET AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 3V, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
    Feb 17, 2023 · #3V · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT WEST WALL IN THE KITCHEN LOCATED AT APT 3V, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
    Feb 17, 2023 · #3V · VIOLATION CLOSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3V, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
    Feb 17, 2023 · #3V · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3V, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
    Feb 17, 2023 · #3V · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REFIT CASEMENT WINDOW AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3V, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
    Feb 17, 2023 · #3V · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 12, 2022 · #4J · VIOLATION CLOSED
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 12, 2022 · #4J · VIOLATION CLOSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 10, 2022 · VIOLATION DISMISSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN. IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Sep 21, 2021 · #6C · VIOLATION CLOSED
DOB permits (last 30)
  • PL-
    RENTOM GROUP CORP
  • OT-
    109 CONSTRUCTION LLC
  • OT-
    OCS BUILDERS GROUP NY LLC
  • OT-
    OCS BUILDERS GROUP NY LLC
  • MH-
    OCS BUILDERS GROUP NY LLC
  • SP-
    CAPITOL FIRE SPRINKLER CO
  • MH-
    AMBASSADOR CONSTRUCTION C
  • OT-
    AMBASSADOR CONSTRUCTION C
  • PL-
    S.B.A. PLUMBING CORP
  • MH-
    AMBASSADOR CONSTRUCTION C
  • OT-
    AMBASSADOR CONSTRUCTION C
  • OT-
    JEPOL CONSTRUCTION INC
  • OT-
    ACTION CHUTES INC
  • OT-
    MA KITCHEN & BATH INC
  • FP-
    LUND FIRE PRODUCTS CO INC
  • OT-
    PINNACLE CONTRACT. OF NY
  • MH-
    PINNACLE CONTRACT. OF NY
  • PL-
    BEDROCK PLBG. & HTG., INC
  • OT-
    MA KITCHEN & BATH INC
  • SP-
    NYC SPRINKLER SYSTEMS COR
  • OT-
    OCS BUILDERS GROUP NY LLC
  • OT-
    SGC CONTRACTING CORP
  • OT-
    OCS BUILDERS GROUP NY LLC
  • MH-
    OCS BUILDERS GROUP NY LLC
  • OT-
    OCS BUILDERS GROUP NY LLC
  • PL-
    RENTOM GROUP CORP
  • OT-
    KC CONTRACTING CORP
DOB violations
  • Feb 20, 2024FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Apr 22, 2023EARCX-FAILURE TO SUBMIT EER NONE
  • Aug 21, 2022EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 16, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 2, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jun 26, 2020E-ELEVATOR ELEVATORREQUIRED
  • Nov 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • Aug 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • May 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • Feb 16, 2019BENCH-FAILURE TO BENCHMARK NONE
  • Mar 19, 2003LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Dec 27, 1988C-CONSTRUCTION OTHER OPTIONAL

More buildings in Lincoln Square

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1011717511

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record May 8, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
27 permits in the current corpus

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
108 violations in the current corpus · latest record Jul 8, 2026

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
39 violations in the current corpus · latest record Aug 13, 2026

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lincoln Square market page.