CurbScoop
CurbScoopBuildingsLincoln Square60 RIVERSIDE BOULEVARD

60 RIVERSIDE BOULEVARD

Manhattan· Lincoln Square· built 2008class RMBBL 1011717508
Open listing source

60 RIVERSIDE BOULEVARD is a 259-unit building in Lincoln Square, Manhattan, built in 2008.

1 unit is on the market here right now.

City records show 30 DOB permits and 60 open violations on file.

Units (res)
259
Floors
40.0
Lot ft²
36,864 ft²
Bldg ft²
451,749 ft²
Assessed
$84.7M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
60 RIVERSIDE BOULEVARD #2802
Manhattan · built 2008
Lincoln Square$2.65M$1,8541,429 ft²2 bd · 1 ba-7
2 HPD-C11 DOBbedbug
15.3Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN CLOSET AT WEST IN THE FOYER LOCATED AT APT 204, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Apr 17, 2026 · #204 · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 205, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 3, 2025 · #205 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN CLOSET IN THE FOYER LOCATED AT APT 205, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 3, 2025 · #205 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 205, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 3, 2025 · #205 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT WEST WALL AT PUBLIC HALL, 2nd STORY
    Jun 3, 2025 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL AT PUBLIC HALL, 2nd STORY
    Jun 3, 2025 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN CLOSET IN THE FOYER LOCATED AT APT 205, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 3, 2025 · #205 · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 301, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 11, 2024 · #301 · NOV SENT OUT
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 301, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''North''
    Jul 23, 2024 · #301 · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS FAUCET AT BATHTUB IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT APT301, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH
    Sep 24, 2023 · #APT301 · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS FAUCET AT WASH BASIN IN THE 1st BATHROOM FROM NORTH LOCATED AT APT APT301, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH
    Sep 24, 2023 · #APT301 · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS THE FAUCET AT WASH BASIN IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT APT301, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH
    Sep 24, 2023 · #APT301 · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 31, 2023 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 3, 2022 · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1207, 12th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Feb 18, 2022 · #1207 · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1207, 12th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Feb 18, 2022 · #1207 · NOV SENT OUT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... NORTH WALL (APPROX. 3SQ. FT.) IN THE BATHROOM LOCATED AT APT 1207, 12th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Feb 18, 2022 · #1207 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WALL MOUNT WOOD CABINET AT EAST WALL IN THE KITCHEN LOCATED AT APT 1207, 12th STORY, 3rd APARTMENT FROM SOUTH AT WEST
    Feb 18, 2022 · #1207 · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... NORTH WALL (APPROX. 3SQ. FT.) IN THE BATHROOM LOCATED AT APT 1207, 12th STORY, 3rd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 14835532 ISSUED 18-FEB-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Feb 18, 2022 · #1207 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE BATHROOM LOCATED AT APT 3901, 39th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 19, 2022 · #3901 · VIOLATION DISMISSED
DOB permits (last 30)
  • PLApr 13, 2017
    MESSEMER MECHANICAL INC
  • SP-
    SMART PLBG & HTG CORP
  • OT-
    SBP NEW YORK LLC
  • OT-
    SBP NEW YORK LLC
  • MH-
    SBP NEW YORK LLC
  • OT-
    TOTAL HOME IMPROVEMENT SE
  • OT-
    SIGN ARTISTRY AWNING CORP
  • OT-
    SHADAV CONSTRUCTION INC
  • OT-
    SIGN ARTISTRY AWNING CORP
  • OT-
    SHADAV CONSTRUCTION INC
  • PL-
    DNA PLUMBING CONTR. INC
  • OT-
    MYRIAD CONSTRUCTION SERVI
  • PL-
    S.O.S. PLBG & HTG LTD
  • MH-
    SBP NEW YORK LLC
  • OT-
    SHADAV CONSTRUCTION INC
  • OT-
    SHADAV CONSTRUCTION INC
  • OT-
    MYRIAD CONSTRUCTION SERVI
  • PL-
    MESSEMER MECHANICAL INC
  • OT-
    SBP NEW YORK LLC
  • MH-
    SBP NEW YORK LLC
  • PL-
    DNA PLUMBING CONTR. INC
  • PL-
    DNA PLUMBING CONTR. INC
  • SP-
    DNA PLUMBING CONTR. INC
  • PL-
    M. FARBMAN & SONS, INC
  • OT-
    MYRIAD CONSTRUCTION SERVI
  • OT-
    SHADAV CONSTRUCTION INC
  • OT-
    CHARTWELL BUILDERS INC
  • MH-
    CHARTWELL BUILDERS INC
  • SP-
    FORTE EXPRESS P & H INC
  • OT-
    SHADAV CONSTRUCTION INC
DOB violations
  • Jul 23, 2025P-PLUMBING NONE
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 9, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 20, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 6, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 6, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 6, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jun 6, 2017E-ELEVATOR ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 27, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 13, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 13, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 13, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 13, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 8, 2013E-ELEVATOR ELEVATORREQUIRED

More buildings in Lincoln Square

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1011717508

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Jun 18, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
70 permits in the current corpus · latest record Apr 13, 2017

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
20 violations in the current corpus · latest record Apr 20, 2026

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
61 violations in the current corpus · latest record Jul 23, 2025

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lincoln Square market page.