CurbScoop
CurbScoopBuildingsUpper West Side253 WEST 73 STREET

253 WEST 73 STREET

Manhattan· Upper West Side· built 1927class RZBBL 1011657501
Open listing source

253 WEST 73 STREET is a 159-unit building in Upper West Side, Manhattan, built in 1927.

1 unit is on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
159
Floors
19.0
Lot ft²
15,330 ft²
Bldg ft²
159,086 ft²
Assessed
$26.3M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
253 WEST 73 STREET #5G
Manhattan · built 1927
Upper West Side$6.00M$2,3062,600 ft²3 bd · 4 ba-41
9 HPD-C5 DOBbedbug
22.2Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 17C, 17th STORY, 4th APARTMENT FROM SOUTH AT WEST
    Sep 7, 2024 · #17C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT PH2C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 8, 2024 · #PH2C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT PH2C, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 8, 2024 · #PH2C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT PH2C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 8, 2024 · #PH2C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT PH2C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 8, 2024 · #PH2C · NOV SENT OUT
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT PH2C, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 8, 2024 · #PH2C · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT PH2C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 8, 2024 · #PH2C · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND THE CEILING AT PUBLIC HALL STAIRS, 16th STORY
    Jan 31, 2024 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 17C LOWER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 17C LOWER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET PLATE COVER AT THE SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE NORTH WALL, SOUTH WALL, EAST WALL AND AT THE WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND AT THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND AT THE CEILING IN THE BATHROOM LOCATED AT APT 17C LOWER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND AT THE CEILING IN THE KITCHEN LOCATED AT APT 17C LOWER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND AT THE CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 17C LOWER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING AND THE WEST WALL, SOUTH WALL AND EAST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 17C LOWER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd BATHROOM FROM EAST LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND AT THE CEILING IN THE BATHROOM LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOV SENT OUT
  • C
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 40 SQ FT AT THE WEST WALL AND 40 SQ FT AT THE SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · NOTICE OF ISSUANCE SENT TO TENANT
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AT PUBLIC HALL STAIRS, 17th STORY
    Jan 31, 2024 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AT PUBLIC HALL STAIRS, 16th STORY
    Jan 31, 2024 · VIOLATION CLOSED
  • B
    § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BUILDING MATERIALS AT PUBLIC HALL STAIRS, 17th STORY
    Jan 31, 2024 · NOV SENT OUT
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQ FT AT THE WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 17C LOWER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16640548 ISSUED 31-JAN-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
    Jan 31, 2024 · #17C · NOT COMPLIED WITH
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT PUBLIC HALL STAIRS, 17th STORY
    Jan 31, 2024 · VIOLATION DISMISSED
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQ FT AT THE WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 17C LOWER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jan 31, 2024 · #17C · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 17C, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Sep 21, 2023 · #17C · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 17C, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Sep 21, 2023 · #17C · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK A CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 17C, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Sep 21, 2023 · #17C · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 17C, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 21, 2023 · #17C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 17C, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 21, 2023 · #17C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 17C, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 21, 2023 · #17C · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 17C, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 21, 2023 · #17C · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LEADING TO TERRACE. IN THE 3rd ROOM FROM NORTH LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 12, 2023 · #17C · NOV SENT OUT
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 12, 2023 · #17C · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE 1st LIVING ROOM FROM NORTH AT WEST LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 12, 2023 · #17C · NOV SENT OUT
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st LIVING ROOM FROM NORTH AT WEST LOCATED AT APT 17C UPPER LEVEL, 17th STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Jul 12, 2023 · #17C · NOV SENT OUT
DOB permits (last 30)
  • OTJun 1, 2007
    JR GRECH CONSTRUCTION
  • OTDec 14, 2006
    PAINTING PLUS II LLC
  • OT-
    PALMER ENTERPRISES OF ROC
  • PL-
    NEW YORK CITY PLUMBER CORP
  • PL-
    EDGECOMBE PLBG & HTG INC
  • OT-
    SILVERLINING INTERIORS IN
  • PL-
    DONATO INC
  • OT-
    KING ROSE OF NY, INC
  • EQ-
    EMPIRE SCAFFOLDING SYSTEM INC
  • OT-
    WARMURR CORP
  • OT-
    BELL CONTRACTING NY INC
  • PL-
    ADRIATIC PLBG & HTG CORP
  • OT-
    BAR CONSTRUCTION CORP
  • PL-
    PRACTICAL PLBG & HTG INC
  • PL-
    R.J.C. MECH CORP
  • MH-
    SILVERLINING INTERIORS IN
  • PL-
    EDGECOMBE PLBG & HTG INC
  • OT-
    CDS MESTEL CONST CORP
  • OT-
    QUIN-ONELLI INC
  • OT-
    SILVERLINING INTERIORS IN
  • MH-
    SILVERLINING INTERIORS IN
  • OT-
    MAREK K CONTRACTING CORP
  • PL-
    EDGECOMBE PLBG & HTG INC
  • PL-
    MAC FELDER INC
  • MH-
    ALED TECHNOLOGIES INC
  • PL-
    PRACTICAL PLBG & HTG INC
  • PL-
    HENRY MYERS P & H, INC
  • OT-
    PALMER ENTERPRISES OF ROC
  • OT-
    MAREK K CONTRACTING CORP
  • OT-
    PYRAMID RESTORATION INC
DOB violations
  • Mar 26, 2019FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • May 31, 2018FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 5, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 4, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 4, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 4, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 28, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 1, 2013LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 5, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 2012E-ELEVATOR ELEVATORREQUIRED
  • Nov 23, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 11, 2010E-ELEVATOR ELEVATORREQUIRED
  • Aug 11, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jul 15, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 15, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 15, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 15, 2009E-ELEVATOR ELEVATORREQUIRED
  • Apr 29, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 29, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 29, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jun 25, 2007L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
  • Apr 4, 2007E-ELEVATOR ELEVATORREQUIRED
  • Apr 4, 2007E-ELEVATOR ELEVATORREQUIRED
  • Apr 4, 2007E-ELEVATOR ELEVATORREQUIRED
  • Apr 4, 2007E-ELEVATOR ELEVATORREQUIRED
  • May 17, 2006E-ELEVATOR ELEVATORREQUIRED
  • May 17, 2006E-ELEVATOR ELEVATORREQUIRED
  • May 17, 2006E-ELEVATOR ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1011657501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 26, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
155 permits in the current corpus · latest record Jun 1, 2007

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
58 violations in the current corpus · latest record Jun 8, 2025

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
48 violations in the current corpus · latest record Nov 20, 2024

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.