CurbScoop
CurbScoop›Buildings›Lincoln Square›200 WEST 72 STREET

200 WEST 72 STREET

Manhattan· Lincoln Square· built 2008class RMBBL 1011637503
Open listing source

200 WEST 72 STREET is a 108-unit building in Lincoln Square, Manhattan, built in 2008.

10 units are on the market here right now.

City records show 30 DOB permits and 67 open violations on file.

Units (res)
108
Floors
19.0
Lot ft²
14,336 ft²
Bldg ft²
203,826 ft²
Assessed
$62.3M
DOF total
Comps L5y
0

Active sale listings (10)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
212 WEST 72 STREET #PHS
Manhattan · built 2008
Lincoln Square$13.5M$3,6713,677 ft²4 bd · 4 ba-703
3 HPD-C20 DOBbedbug
23.3Source
212 WEST 72 STREET #16E
Manhattan · built 2008
Lincoln Square$7.00M$2,7602,534 ft²4 bd · 4 ba-136
3 HPD-C20 DOBbedbug
23.3Source
212 WEST 72 STREET #16B
Manhattan · built 2008
Lincoln Square$6.00M$2,3642,536 ft²4 bd · 3 ba-1082
3 HPD-C20 DOBbedbug
23.3Source
212 WEST 72 STREET #15G
Manhattan · built 2008
Lincoln Square$6.79M$2,3982,834 ft²4 bd · 4 ba-964
3 HPD-C20 DOBbedbug
23.3Source
212 WEST 72 STREET #10C
Manhattan · built 2008
Lincoln Square$3.15M$2,2071,425 ft²3 bd · 2 ba-110
3 HPD-C20 DOBbedbug
23.3Source
212 WEST 72 STREET #9J
Manhattan · built 2008
Lincoln Square$4.50M$2,3671,899 ft²3 bd · 3 ba-728
3 HPD-C20 DOBbedbug
23.3Source
212 WEST 72 STREET #7L
Manhattan · built 2008
Lincoln Square$2.69M$1,8871,428 ft²2 bd · 2 ba-43
3 HPD-C20 DOBbedbug
23.3Source
212 WEST 72 STREET #8F
Manhattan · built 2008
Lincoln Square$1.59M$2,234714 ft²1 bd · 1 ba-71
3 HPD-C20 DOBbedbug
23.3Source
212 WEST 72 STREET #19G
Manhattan · built 2008
Lincoln Square$7.75M$2,9192,655 ft²3 bd · 3 ba-536
3 HPD-C20 DOBbedbug
23.3Source
212 WEST 72 STREET #10H
Manhattan · built 2008
Lincoln Square$6.67M$2,5782,589 ft²4 bd · 3 ba-163
3 HPD-C20 DOBbedbug
23.3Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 2, 2023 · #4E · VIOLATION CLOSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX AT PUBLIC HALL, 1st STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AT PUBLIC HALL, 5th STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 5th STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE ALL WALLS AND FLOORS AT PUBLIC HALL STAIRS
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT ALL WALLS AND CEILING AT PUBLIC HALL STAIRS AT NORTHWEST , 20th STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARARDANT MATERIALS AT ALL WALLS AND CEILINGS AT PUBLIC HALL STAIRS AT NORTHWEST , 20th STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING AT PUBLIC HALL STAIRS AT NORTHWEST , 20th STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 3rd STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 7L, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 24, 2021 · #7L · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 7L, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 24, 2021 · #7L · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 7L, 7th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 24, 2021 · #7L · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL, 1st STORY
    Feb 24, 2021 · VIOLATION WILL BE REINSPECTED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING FRAME AT PUBLIC HALL, 1st STORY
    Nov 25, 2020 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Nov 25, 2020 · VIOLATION WILL BE REINSPECTED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Nov 25, 2020 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING SIGN AT PUBLIC HALL, 1st STORY
    Nov 25, 2020 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Nov 25, 2020 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Nov 25, 2020 · VIOLATION WILL BE REINSPECTED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT 1ST STORY PUBLIC HALL AND OUTSIDE DOOR OF BOILER ROOM
    Nov 25, 2020 · VIOLATION WILL BE REINSPECTED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Nov 25, 2020 · VIOLATION WILL BE REINSPECTED
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Mar 4, 2015 · VIOLATION DISMISSED
DOB permits (last 30)
  • General ConstructionJun 2, 2026
    VALNICK LLC
  • General ConstructionMay 6, 2026
    RETAIL PROJECT MANGEMENT
  • PlumbingOct 29, 2025
    A.M.N. CORPORATION
  • General ConstructionOct 27, 2025
    REMODELING SPACE NY LLC
  • SprinklersJan 24, 2024
    A & E MECHANICAL CORP
  • General ConstructionJan 23, 2024
    EG MUNOZ CONSTRUCTION.LLC
  • Mechanical SystemsDec 20, 2023
    EG MUNOZ CONSTRUCTION.LLC
  • Mechanical SystemsJul 28, 2023
    GREGOR INDUSTRIES INC
  • General ConstructionJul 22, 2023
    GREGOR INDUSTRIES INC
  • General ConstructionJul 14, 2023
    ELITE PAINTING & MAINTENA
  • General ConstructionJul 14, 2023
    ELITE PAINTING & MAINTENA
  • PlumbingJun 30, 2023
    INTERCITY PLBG & HTG CORP
  • StructuralMay 30, 2023
    EG MUNOZ CONSTRUCTION.LLC
  • General ConstructionMay 19, 2023
    EG MUNOZ CONSTRUCTION.LLC
  • PlumbingMay 16, 2023
    KAPNAG HTG & PLBG CORP
  • General ConstructionApr 3, 2023
    EG MUNOZ CONSTRUCTION.LLC
  • General ConstructionMar 29, 2023
    H DIAS INC
  • StructuralFeb 6, 2023
    TOWN & GARDENS LTD
  • General ConstructionJun 10, 2022
    EG MUNOZ CONSTRUCTION.LLC
  • SignMar 23, 2022
    NORTH SHORE NEON SIGN CO
  • SignMar 23, 2022
    NORTH SHORE NEON SIGN CO
  • SignMar 23, 2022
    NORTH SHORE NEON SIGN CO
  • SignMar 23, 2022
    NORTH SHORE NEON SIGN CO
  • General ConstructionFeb 18, 2022
    EG MUNOZ CONSTRUCTION.LLC
  • SprinklersFeb 14, 2022
    A & E MECHANICAL CORP
  • Mechanical SystemsFeb 11, 2022
    EG MUNOZ CONSTRUCTION.LLC
  • PlumbingFeb 10, 2022
    DOWNTOWN PLBG & HTG INC
  • PlumbingFeb 10, 2022
    DOWNTOWN PLBG & HTG INC
  • PlumbingFeb 10, 2022
    DOWNTOWN PLBG & HTG INC
  • General ConstructionFeb 9, 2022
    EG MUNOZ CONSTRUCTION.LLC
DOB violations
  • Dec 17, 2021EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED
  • May 26, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 25, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 25, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 25, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 25, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Feb 11, 2019C-CONSTRUCTION OTHER OPTIONAL
  • May 22, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 15, 2017EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 22, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED

More buildings in Lincoln Square

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Oct 5, 2026

Stable property ID: nyc:bbl:1011637503

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Oct 4, 2026

Pipeline completed Oct 4, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
10 active sale listings in the current corpus · latest record Jun 11, 2026

Pipeline completed Aug 31, 2026

Retired source: collection stopped on 2026-08-31, so these are the last Manhattan and Brooklyn listings observed, not the current market.

Listing observations describe marketed state as of 2026-08-31 at the latest and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Oct 5, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
178 permits in the current corpus · latest record Jun 9, 2026

Pipeline completed Oct 5, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
27 violations in the current corpus · latest record Jul 21, 2023

Pipeline completed Oct 5, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
120 violations in the current corpus · latest record Jul 10, 2026

Pipeline completed Oct 5, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lincoln Square market page.