CurbScoop
CurbScoopBuildingsLincoln Square10 WEST END AVENUE

10 WEST END AVENUE

Manhattan· Lincoln Square· built 2005class RMBBL 1011517502

10 WEST END AVENUE is a 171-unit building in Lincoln Square, Manhattan, built in 2005.

4 units are on the market here right now.

City records show 30 DOB permits and 44 open violations on file.

Units (res)
171
Floors
-
Lot ft²
12,103 ft²
Bldg ft²
236,569 ft²
Assessed
$33.0M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
10 WEST END AVENUE #5D
Manhattan · built 2005
Lincoln Square$1.20M$1,456824 ft²1 bd · 1 ba-267
1 HPD-C7 DOBbedbug
8.9Source
10 WEST END AVENUE #18B
Manhattan · built 2005
Lincoln Square$2.40M$1,8021,329 ft²2 bd · 2 ba-15
1 HPD-C7 DOBbedbug
8.9Source
10 WEST END AVENUE #4/J
Manhattan · built 2005
Lincoln Square$899K$1,498600 ft²studio · 1 ba-185
1 HPD-C7 DOBbedbug
8.9Source
10 WEST END AVENUE #4J
Manhattan · built 2005
Lincoln Square$799K$1,332600 ft²studio · 1 ba-25
1 HPD-C7 DOBbedbug
8.9Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Jun 13, 2025 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDING PLASTER AT CEILING AT PUBLIC HALL, 1st STORY
    May 16, 2020 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY
    May 16, 2020 · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LIGHT FIXTURES AT CEILING AT PUBLIC HALL, 1st STORY
    May 16, 2020 · NOV SENT OUT
  • A
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF WOOD PANEL AT WEST WALL AT PUBLIC HALL, 11th STORY
    Mar 13, 2020 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Sep 6, 2019 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT 1ST STORY PUBLIC HALL AND OUTSIDE DOOR OF THE BOILER ROOM
    Sep 6, 2019 · VIOLATION DISMISSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Sep 6, 2019 · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Sep 6, 2019 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
    Sep 6, 2019 · VIOLATION DISMISSED
DOB permits (last 30)
  • OT-
    STATEWID CONSTRUCTION &
  • PL-
    NEW AMSTERDAM PLBG & HTG
  • OT-
    OFFICIENCY CONSTRUCTION I
  • PL-
    CARRERAS HOME IMPROV INC
  • OT-
    PEGASUS REALTY SOLUTIONS
  • OT-
    FANUKA INC
  • PL-
    PRACTICAL PLBG & HTG INC
  • OT-
    HD CARPENTRY CORP
  • OT-
    TWO TIERS DSGN & CON. LLC
  • OT-
    BROWNSTONE BUDDY, INC
  • EQ-
    ROCK SCAFFOLDING CORP
  • OT-
    OFFICIENCY CONSTRUCTION I
  • OT-
    RAYMOND ROMANO INC
  • MH-
    RAYMOND ROMANO INC
  • PL-
    CARRERAS HOME IMPROV INC
  • OT-
    CENTRAL CONSTRUCTION MANA
  • OT-
    BROWNSTONE BUDDY, INC
  • PL-
    STEPHEN FOY MECH SVC CORP
  • SP-
    HARVARD PLBG & HTG CORP
  • OT-
    SUNSHINE QUALITY CONSTRUC
  • PL-
    STEPHEN FOY MECH SVC CORP
  • OT-
    FINIX U.S.A. CONSTRUCTION
  • MH-
    TWO TIERS DSGN & CON. LLC
  • PL-
    24 SEVEN WATER & SEWER CO
  • PL-
    APOLLO PLBG & HTG INC
  • OT-
    ALFRED E TERRY III
  • PL-
    24 SEVEN WTR & SEWER CORP
  • OT-
    BROWNSTONE BUDDY, INC
  • MH-
    WHITE LEAF MECHANICAL COR
  • OT-
    CHATZI CONSTRUCTION INC
DOB violations
  • Aug 20, 2025C-CONSTRUCTION OTHER OPTIONAL
  • Oct 11, 2023FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 8, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 8, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 8, 2021E-ELEVATOR ELEVATORREQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Oct 1, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Oct 1, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 9, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2014E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • May 24, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 24, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 24, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2011AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 4, 2010E-ELEVATOR ELEVATORREQUIRED
  • Aug 4, 2010E-ELEVATOR ELEVATORREQUIRED
  • Aug 4, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jul 13, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 13, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 13, 2009E-ELEVATOR ELEVATORREQUIRED
  • Apr 29, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 28, 2008E-ELEVATOR ELEVATORREQUIRED

More buildings in Lincoln Square

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1011517502

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Jun 4, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
33 permits in the current corpus

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
10 violations in the current corpus · latest record Dec 22, 2025

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
34 violations in the current corpus · latest record Aug 20, 2025

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lincoln Square market page.