CurbScoop
CurbScoopBuildingsUpper West Side151 CENTRAL PARK WEST

151 CENTRAL PARK WEST

Manhattan· Upper West Side· built 1908class D4BBL 1011280029

151 CENTRAL PARK WEST is a 36-unit building in Upper West Side, Manhattan, built in 1908.

1 unit is on the market here right now.

City records show 30 DOB permits and 42 open violations on file.

Units (res)
36
Floors
12.5
Lot ft²
12,648 ft²
Bldg ft²
124,867 ft²
Assessed
$19.7M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
151 CENTRAL PARK WEST #5W
Manhattan · built 1908
Upper West Side$5.38M-0 ft²3 bd · 3 ba-74
19 DOBbedbug
15.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 1, 2021 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 5, 2018 · VIOLATION DISMISSED
DOB permits (last 30)
  • OTMar 14, 2002
    UNITED CONSTRUCTION WEATHER CO
  • OTSep 22, 1995
    MAN. DECORATING INC.
  • MH-
    IDI CONSTRUCTION CO INC
  • MH-
    PETR BLAHOUT CORP
  • OT-
    PETR BLAHOUT CORP
  • PL-
    J & M PLG OF WESTCHESTER
  • MH-
    DUCE CONSTRUCTION CORP
  • MH-
    SILVER RAIL ASSOC.
  • OT-
    UNITED CONSTRUCTION WEATHER CO
  • OT-
    SCORDIO CONSTRUCTION INC
  • MH-
    SCORDIO CONSTRUCTION INC
  • OT-
    SILVER RAIL ASSOC.
  • MH-
    SILVER RAIL ASSOC.
  • OT-
    INFRASTRUCTURE REPAIR SER
  • OT-
    SILVER RAIL ASSOC.
  • OT-
    DUCE CONSTRUCTION CORP
  • OT-
    HOMECREST, INC
  • OT-
    CREO PROJECTS LLC
  • OT-
    PETER BLAHOUT CORP.
  • OT-
    PETER BLAHOUT CORP.
  • OT-
    T STEELE CONSTRUCTION INC
  • MH-
    T STEELE CONSTRUCTION INC
  • OT-
    IDI CONSTRUCTION COMPANY INC.
  • PL-
    SEAN COAKLEY PLMB & HTNG INC
  • OT-
    SCORDIO CONSTRUCTION INC
  • PL-
    JOE TRUCE PLBG INC
  • OT-
    UNITED CONSTRUCTION
  • OT-
    PETR BLAHOUT CORP
  • MH-
    PETR BLAHOUT CORP
  • PL-
    R.J.C. MECHANICAL CORP
DOB violations
  • Jul 23, 2025P-PLUMBING NONE
  • Dec 1, 2024EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 1, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 1, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 1, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 1, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Mar 21, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 21, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 21, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 21, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 12, 2012E-ELEVATOR ELEVATORREQUIRED
  • May 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • Aug 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • Aug 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • Aug 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 8, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 8, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 8, 2008E-ELEVATOR ELEVATORREQUIRED
  • Dec 8, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • May 8, 2006E-ELEVATOR ELEVATORREQUIRED

More buildings in Upper West Side

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1011280029

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 18, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
164 permits in the current corpus · latest record Mar 14, 2002

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
2 violations in the current corpus · latest record Apr 28, 2021

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
59 violations in the current corpus · latest record Jul 23, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Upper West Side market page.