CurbScoop
CurbScoopBuildingsLincoln Square12 WEST 72 STREET

12 WEST 72 STREET

Manhattan· Lincoln Square· built 1927class D4BBL 1011240042
Open listing source

12 WEST 72 STREET is a 152-unit building in Lincoln Square, Manhattan, built in 1927.

4 units are on the market here right now.

City records show 30 DOB permits and 65 open violations on file.

Units (res)
152
Floors
29.0
Lot ft²
10,217 ft²
Bldg ft²
192,543 ft²
Assessed
$30.2M
DOF total
Comps L5y
0

Active sale listings (4)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
12 WEST 72 STREET #11E
Manhattan · built 1927
Lincoln Square$599K-0 ft²1 bd · 1 ba-116
5 HPD-C15 DOBbedbug
21.5Source
12 WEST 72 STREET #14E
Manhattan · built 1927
Lincoln Square$2.17M-0 ft²3 bd · 3 ba-52
5 HPD-C15 DOBbedbug
21.5Source
12 WEST 72 STREET #7H
Manhattan · built 1927
Lincoln Square$698K-0 ft²1 bd · 1 ba-292
5 HPD-C15 DOBbedbug
21.5Source
12 WEST 72 STREET #RES12D
Manhattan · built 1927
Lincoln Square$1.85M-0 ft²3 bd · 2 ba-49
5 HPD-C15 DOBbedbug
21.5Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 19B, 19th STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 6, 2024 · #19B · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 19B, 19th STORY, 1st APARTMENT FROM NORTH AT EAST
    Dec 6, 2024 · #19B · NOV SENT OUT
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF A KICK DOWN DOOR STOPPER INSTALLED AT BUILDING ENTRANCE DOOR
    Apr 22, 2024 · VIOLATION CLOSED
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 6; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 22A, 22nd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Apr 15, 2024 · #22A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT SWITCH AT EAST WALL IN THE FOYER LOCATED AT APT 9A, 9th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 24, 2022 · #9A · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE , IN THE ENTRANCE LOCATED AT APT 9A, 9th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jun 24, 2022 · #9A · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING ,WALLS AND TRIM IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 19B, 19th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 30, 2018 · #19B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 19B, 19th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 30, 2018 · #19B · VIOLATION CLOSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 19B, 19th STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 30, 2018 · #19B · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL AT MASTER BEDROOM BATHROOM LOCATED AT APT 22A LOWER LEVEL, 22nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    May 21, 2013 · #22A · VIOLATION DISMISSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 22A LOWER LEVEL, 22nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    May 21, 2013 · #22A · VIOLATION DISMISSED
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM FROM NORTH AT WEST LOCATED AT APT 22A LOWER LEVEL, 22nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    May 21, 2013 · #22A · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 21B, 21st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Jan 21, 2012 · #21B · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 21B, 21st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
    Jan 21, 2012 · #21B · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
    Nov 7, 2009 · #3A · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jul 22, 2009 · #3A · VIOLATION CLOSED
  • C
    SECTION 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER
    Jul 16, 2009 · #18B · SECOND NO ACCESS TO RE-INSPECT VIOLATION
  • B
    § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BATHTUB IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM WEST AT NORTHWEST
    Sep 3, 2008 · #3A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE EAST WALL SWITCH AND SOCKET( ELECTRICAL) IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 12, 2008 · #3A · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN CLOSET EAST SOUTH ROOM LOCATED AT APT 3A, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Apr 24, 2008 · #3A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Apr 24, 2008 · #3A · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Apr 24, 2008 · #3A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
    Apr 24, 2008 · #3A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR KITCHEN 6 STY NORTHEAST APT 6D , SECTION '' ''
    Jul 7, 1995 · #6D · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS KITCHEN SINK 6 STY NORTHEAST APT 6D , SECTION '' ''
    Jul 7, 1995 · #6D · VIOLATION CLOSED
DOB permits (last 30)
  • OTDec 7, 1998
    HOBO CONSTRUCTION CORP INC
  • ALJan 2, 1997
    KVC CONSTRUCTION
  • PLDec 9, 1991
    NONE
  • PL-
    R.J.C. MECH CORP
  • OT-
    JAMES E GITZGERALD INC
  • MH-
    JAMES E GITZGERALD INC
  • PL-
    ELMWOOD PLUMBING & HEATING INC
  • MH-
    ABSTRACT AIR CORP
  • PL-
    A.M.N. CORPORATION
  • OT-
    VELLA INTERIORS INC
  • EQ-
    ROCK GROUP NY CORP
  • PL-
    N.PAGANO PLUMBING & HEATING CONT
  • OT-
    SM CONSTRUCTION & CONTRA
  • OT-
    ATLAS, DESIGN CONST.
  • OT-
    EM EGGERS & SON CONSTRUCTION
  • PL-
    N.PAGANO PLUMBING & HEATING CONT
  • MH-
    BALL CONSTRUCTION LP
  • OT-
    BALL CONSTRUCTION LP
  • OT-
    HIGHLINE CONSTRUCTION GR
  • PL-
    N. PAGANO PLUMB HTG CONTR
  • AL-
    JR GRECH CONSTRUCTION CORP
  • OT-
    K.R.S. RENOVATION CORP
  • PL-
    CITY WIDE PLMBG SRVS CORP
  • OT-
    JARLATH CONNAUGHTON
  • OT-
    CALDWELL & WALSH BUILDING
  • MH-
    CALDWELL & WALSH BUILDING
  • OT-
    HOBO CONSTRUCTION CO
  • OT-
    CYPRESS RESTORATION CORP
  • PL-
    PAUL QUINN PLBG & HTG INC
  • OT-
    ABSTRACT AIR CORP
DOB violations
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 29, 2020EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 4, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 26, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 5, 2019EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Mar 18, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 27, 2018EARCX-FAILURE TO SUBMIT EER NONE
  • Oct 15, 2017EARCX-FAILURE TO SUBMIT EER NONE
  • Sep 15, 2017EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Feb 21, 2017FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • Feb 16, 2017EARCX-FAILURE TO SUBMIT EER NONE
  • Dec 1, 2016EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 1, 2016EARCX-FAILURE TO SUBMIT EER NONE
  • Sep 1, 2016EARCX-FAILURE TO SUBMIT EER NONE
  • Apr 24, 2015E-ELEVATOR ELEVATORREQUIRED
  • Mar 11, 2015AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • May 30, 2014ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Apr 16, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 16, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 16, 2014E-ELEVATOR ELEVATORREQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Mar 13, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 13, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 13, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 13, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 13, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 8, 2012E-ELEVATOR ELEVATORREQUIRED
  • Feb 21, 2012LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
  • May 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 11, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 11, 2011E-ELEVATOR ELEVATORREQUIRED

More buildings in Lincoln Square

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1011240042

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
4 active sale listings in the current corpus · latest record Jun 6, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
292 permits in the current corpus · latest record Dec 16, 1998

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
25 violations in the current corpus · latest record Dec 13, 2024

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
75 violations in the current corpus · latest record Nov 7, 2024

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lincoln Square market page.