CurbScoop
CurbScoopBuildingsLincoln Square115 CENTRAL PARK WEST

115 CENTRAL PARK WEST

Manhattan· Lincoln Square· built 1931class D4BBL 1011240027landmark
Open listing source

115 CENTRAL PARK WEST is a 238-unit building in Lincoln Square, Manhattan, built in 1931.

1 unit is on the market here right now.

City records show 30 DOB permits and 71 open violations on file.

Units (res)
238
Floors
31.0
Lot ft²
42,143 ft²
Bldg ft²
617,569 ft²
Assessed
$84.9M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
115 CENTRAL PARK WEST #4H
Manhattan · built 1931
Lincoln Square$2.50M-0 ft²2 bd · 2 ba-24
10 HPD-C9 DOBbedbug
26.9Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORT-WEST''
    Sep 5, 2026 · #20H · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORT-WEST''
    Sep 5, 2026 · #20H · VIOLATION OPEN
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE KITCHEN LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORT-WEST''
    Sep 5, 2026 · #20H · VIOLATION OPEN
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE KITCHEN LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORT-WEST''
    Sep 5, 2026 · #20H · VIOLATION OPEN
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE KITCHEN LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORT-WEST''
    Sep 5, 2026 · #20H · VIOLATION OPEN
  • C
    § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING KICK DOWN STOPPER INSTALLED AT DOOR IN THE ENTRANCE LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORT-WEST''
    Sep 5, 2026 · #20H · VIOLATION OPEN
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR 1ST WINDOW CASING FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORT-WEST''
    Sep 5, 2026 · #20H · VIOLATION OPEN
  • A
    § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DOOR SEALED UP, CONCRETE WALL CREATED AT DOOR AT WEST WALL LEADING TO WEST YARD IN THE 3rd ROOM FROM EAST LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM WEST AT NORTH
    Jun 7, 2024 · #20H · VIOLATION CLOSED
  • C
    § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR .. IN THE ENTRANCE LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
    May 9, 2023 · #20H · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR NOT SELF CLOSING IN THE ENTRANCE LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH
    May 9, 2023 · #20H · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE SPRING HINGES IN THE ENTRANCE LOCATED AT APT 20H, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 7, 2023 · #20H · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT STAIR AT NORTHWEST SECTION AT PUBLIC HALL, 20th STORY
    Mar 31, 2023 · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE MISSING APPROVED FIRE PROOF SELF CLOSING DOOR EAST 1 LEADING TO TERRACE AT NORTHWEST SECTION AT PUBLIC HALL, 20th STORY
    Mar 31, 2023 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REFIT DOOR IN THE ENTRANCE LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 12, 2022 · #20H · VIOLATION CLOSED
  • C
    § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR , IN THE ENTRANCE LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Apr 12, 2022 · #20H · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
    Feb 12, 2022 · #20H · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE REFIT LOWER WINDOW SASH AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
    Feb 12, 2022 · #20H · VIOLATION CLOSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
    Feb 12, 2022 · #20H · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 20H, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
    Feb 12, 2022 · #20H · VIOLATION CLOSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR IMPROPER FRAME AT PUBLIC HALL, 1st STORY
    Oct 11, 2017 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY
    Oct 11, 2017 · VIOLATION CLOSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Oct 11, 2017 · VIOLATION CLOSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Oct 11, 2017 · VIOLATION CLOSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Oct 11, 2017 · VIOLATION CLOSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
    Oct 11, 2017 · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Oct 11, 2017 · VIOLATION CLOSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Oct 11, 2017 · VIOLATION CLOSED
  • B
    § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING MINIMUM OF 100 WATTS AS REQURED(LIGHT FIXTURE(S) PRESENT). AT FRONT AREAWAY
    Sep 27, 2017 · VIOLATION CLOSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 24, 2016 · VIOLATION DISMISSED
  • B
    § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 200 WATTS MINIMUM REQUIRED (LIGHT FIXTURES PRESENT)
    Feb 18, 2015 · VIOLATION DISMISSED
  • B
    § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS REQUIRED
    May 28, 2006 · VIOLATION CLOSED
DOB permits (last 30)
  • MHAug 16, 2018
    HIICOMPANY CORP
  • OTAug 21, 2013
    C C CONTROLLED COMBUSTION
  • EQMay 19, 2006
    OUTDOOR INSTALLATIONS LLC
  • OTMar 22, 2006
    SILVER RAIL ASSO. CONSTRUCTION
  • MHMar 22, 2004
    LICO C ONTR INC
  • OTAug 7, 2003
    WAPITI CORP .
  • OTAug 23, 2000
    J.R. GRECH CONSTRUCTION CORP.
  • OTNov 24, 1997
    BOHN FIORE INC
  • PLNov 14, 1997
    N.PAGANO PLUMBING & HEATING CONT
  • PLDec 8, 1994
    EFFICIENT PLUMBING & HEATING COR
  • PLJul 7, 1993
    R & F CONTRACTING ,INC.
  • EQMar 16, 1993
    ALLBORO WATER-PROOFING CO.
  • PLJun 23, 1992
    ASSOC MECH CO
  • OTDec 9, 1991
    PAUL AIKSNORAS DESIGN BUILD
  • ALAug 14, 1990
    CADE ENTERPROSES
  • OT-
    PROGROUP INC
  • MH-
    DUCE CONSTRUCTION CORP
  • OT-
    ABIGAIL H HESS INTERIORS
  • OT-
    DUCE CONSTRUCTION CORP
  • OT-
    DUCE CONSTRUCTION CORP
  • PL-
    RETCON MECHANICAL CORP
  • OT-
    VELLA INTERIORS INC
  • PL-
    A.M.N. CORPORATION
  • OT-
    LEONIDAS INTERIORS LLC
  • EQ-
    SPRING SCAFFOLDING LLC
  • AL-
    ABIGAIL H HESS INTERIORS
  • OT-
    TEAMWORK CONTR. RES. CORP
  • EQ-
    SPRING SCAFFOLDING LLC
  • PL-
    PETER MICELI PLUMBING
  • OT-
    ALL POINTS CONSTRUCTION CORP.
DOB violations
  • Jun 11, 2025P-PLUMBING NONE
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 31, 2018FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • May 18, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 15, 2017EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jun 10, 2015EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Oct 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Apr 24, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 24, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 24, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2014E-ELEVATOR ELEVATORREQUIRED
  • Mar 12, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 12, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 12, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 1, 2012EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Aug 18, 2012C-CONSTRUCTION OTHER OPTIONAL
  • Mar 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2012E-ELEVATOR ELEVATORREQUIRED

More buildings in Lincoln Square

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 10, 2026

Stable property ID: nyc:bbl:1011240027

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 22, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 10, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
678 permits in the current corpus · latest record Aug 16, 2018

Pipeline completed Sep 10, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
31 violations in the current corpus · latest record Sep 5, 2026

Pipeline completed Sep 10, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
115 violations in the current corpus · latest record Jun 11, 2025

Pipeline completed Sep 10, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lincoln Square market page.