CurbScoop
CurbScoopBuildingsLincoln Square80 CENTRAL PARK WEST

80 CENTRAL PARK WEST

Manhattan· Lincoln Square· built 1967class D4BBL 1011210029
Open listing source

80 CENTRAL PARK WEST is a 165-unit building in Lincoln Square, Manhattan, built in 1967.

2 units are on the market here right now.

City records show 30 DOB permits and 49 open violations on file.

Units (res)
165
Floors
24.0
Lot ft²
15,002 ft²
Bldg ft²
225,552 ft²
Assessed
$29.3M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
80 CENTRAL PARK WEST #4G
Manhattan · built 1967
Lincoln Square$625K-0 ft²studio · 1 ba-77
1 HPD-C7 DOBbedbug
12.4Source
80 CENTRAL PARK WEST #6B
Manhattan · built 1967
Lincoln Square$2.95M-0 ft²2 bd · 2 ba-91
1 HPD-C7 DOBbedbug
12.4Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 24G, 24th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 29, 2016 · #24G · VIOLATION CLOSED
  • B
    SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 24G, 24th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 29, 2016 · #24G · VIOLATION CLOSED
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 27, 2008 · #4C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 27, 2008 · #4C · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 27, 2008 · #4C · NOV SENT OUT
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 27, 2008 · #4C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 27, 2008 · #4C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 5, 2007 · #4C · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT TUB IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 5, 2007 · #4C · NOV SENT OUT
  • C
    SECTION 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE AND OR MISSING WATER CLOSET IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 5, 2007 · #4C · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE AND OR MISSING WASH BASIN IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 5, 2007 · #4C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 5, 2007 · #4C · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Jun 5, 2007 · #4C · NOV SENT OUT
  • A
    D26-10.01 ADM CODE PROPERLY SECURE THE LOOSE SOAP DISH ABOVE BATHTUB 5TH STY 2ND FROM SOUTH EAST AT SOUTH APT 5C. LOCATED AT APT 5C
    Jul 29, 1982 · #5C · NOV SENT OUT
  • B
    SECTION 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION 5TH STY SOUTH EAST APT 5B AND 5TH STY 2ND FROM SOUTH EAST AT SOUTH APT 5C COMBINED CREATING ONE APT.
    Jul 29, 1982 · NOV SENT OUT
DOB permits (last 30)
  • PLFeb 2, 2009
    S.O.S. PLBG & HTG LTD
  • OTMar 28, 2007
    AP BID MANAGEMENT CORP
  • OTFeb 18, 2003
    SC INTER CORP
  • OT-
    MELE CONTRACTING, INC
  • OT-
    WEST NY RESTORATION INC
  • OT-
    RICONDA MAINTENANCE INC
  • PL-
    PARAMOUNT PLBG SERV AND ALT CO
  • PL-
    J. CAIAZZO PLBG & HTG COR
  • EQ-
    POWERS GENERAL CONTRACTING
  • PL-
    ARK-POL PLUMBING CORP
  • OT-
    MASTEY CONSTRUCTION CO.,I
  • PL-
    DONATO INC
  • OT-
    NADKOS INC
  • PL-
    EMR MECHANICAL CORP
  • OT-
    F.P LEONE / F.D CUSTOM DESIGN
  • MH-
    M. LAPENNA REFRIGERATION
  • PL-
    SEAN COAKLEY P & H INC
  • PL-
    S.O.S. PLBG & HTG LTD
  • OT-
    CRAFTED INTERIORS
  • PL-
    TAK PLUMBING & HEATING CO
  • PL-
    MACREDDIN PLBG & HTG INC
  • PL-
    RICHARD LYNE'S PLBG&HTGCO
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    PROKAST CONSTRUCTION INC
  • EQ-
    EMPIRE SCAFFOLDING SYSTEM
  • OT-
    MGC SERVICES CORP
  • OT-
    SCORDIO CONSTRUCTION INC
  • OT-
    YATES REST GROUP LTD
  • OT-
    CENTRAL CONSTRUCTION MANA
  • PL-
    PLBG INC
DOB violations
  • Dec 28, 2023C-CONSTRUCTION OTHER OPTIONAL
  • Dec 9, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • May 4, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 4, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 3, 2013BENCH-FAILURE TO BENCHMARK NONE
  • Mar 12, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 12, 2013E-ELEVATOR ELEVATORREQUIRED
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 12, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 12, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 12, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 28, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jul 27, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jul 1, 2009E-ELEVATOR ELEVATORREQUIRED
  • Apr 24, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 24, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 24, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 2, 2007LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Sep 19, 2005E-ELEVATOR ELEVATORREQUIRED
  • Sep 19, 2005E-ELEVATOR ELEVATORREQUIRED
  • Sep 19, 2005E-ELEVATOR ELEVATORREQUIRED
  • Mar 19, 2003LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jun 28, 1993LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
  • Sep 28, 1988E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 1988E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 1988E-ELEVATOR ELEVATORREQUIRED

More buildings in Lincoln Square

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1011210029

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Jun 1, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
219 permits in the current corpus · latest record Feb 2, 2009

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
15 violations in the current corpus · latest record Mar 13, 2016

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
34 violations in the current corpus · latest record Dec 28, 2023

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lincoln Square market page.