CurbScoop
CurbScoopBuildingsLincoln Square29 WEST 65 STREET

29 WEST 65 STREET

Manhattan· Lincoln Square· built 1939class R4BBL 1011187501
Open listing source

29 WEST 65 STREET is a 54-unit building in Lincoln Square, Manhattan, built in 1939.

2 units are on the market here right now.

City records show 30 DOB permits and 51 open violations on file.

Units (res)
54
Floors
6.0
Lot ft²
9,414 ft²
Bldg ft²
33,307 ft²
Assessed
$4.36M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
29 WEST 65 STREET #6B
Manhattan · built 1939
Lincoln Square$610K$1,303468 ft²studio · 1 ba-95
3 HPD-C2 DOBbedbug
12.1Source
29 WEST 65 STREET #1A
Manhattan · built 1939
Lincoln Square$900K$1,286700 ft²1 bd · 1 ba-89
3 HPD-C2 DOBbedbug
12.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ...AT WEST AND SOUTH WALLS. IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT CELLAR APT BASEME, 1st CELLAR APT FROM EAST AT SOUTH
    Oct 25, 2025 · #BASEME · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ...AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT CELLAR APT BASEME, 1st CELLAR APT FROM EAST AT SOUTH
    Oct 25, 2025 · #BASEME · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 16, 2023 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 2, 2022 · VIOLATION DISMISSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 11, 2019 · #1B · VIOLATION CLOSED
  • A
    § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, BALCONIES AND COMPONETS BUILDING FRONT AT FIRE ESCAPE
    Sep 21, 2018 · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION 1ST AND 2ND RADIATOR COVERS FROM WEST IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 30, 2018 · #6D · VIOLATION CLOSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    May 30, 2018 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WINDOW REVEAL AT NORTH IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 30, 2018 · #6D · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR COVER AT NORTH IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 30, 2018 · #6D · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION 1ST AND 2ND RADIATOR COVERS FROM WEST IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    May 30, 2018 · #6D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 28, 2017 · #6D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 28, 2017 · #6D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILED WALLS AT SOUTH AND NORTH IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 28, 2017 · #6D · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR AT WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 28, 2017 · #6D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 28, 2017 · #6D · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR AT SOUTHWALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 28, 2017 · #6D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR KITCHEN IN THE KITCHEN LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 28, 2017 · #6D · VIOLATION CLOSED
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Jul 26, 2017 · #6D · VIOLATION CLOSED
  • B
    § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Jul 26, 2017 · #6D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILE AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Jul 26, 2017 · #6D · VIOLATION CLOSED
  • B
    § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Jul 26, 2017 · #6D · VIOLATION CLOSED
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Jun 1, 2017 · #6D · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE THE CEILING LIGHT FIXTURE IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH
    Jun 1, 2017 · #6D · VIOLATION CLOSED
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) THROUGHOUT THE PUBLIC AREAS IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12.
    May 24, 2017 · VIOLATION CLOSED
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 1, 2013 · #6F · VIOLATION DISMISSED
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND EAST WINDOW INTERIOR FRAME IN THE 1st ROOM FROM EAST LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 21, 2012 · #3F · VIOLATION CLOSED
  • A
    SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION WINDOW STOOLS IN THE 1st ROOM FROM EAST LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Aug 21, 2012 · #3F · VIOLATION CLOSED
  • A
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CAULKING AROUND INTERIOR FRAME AT EAST WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 24, 2012 · #3F · VIOLATION CLOSED
  • B
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 24, 2012 · #3F · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Jul 1, 2012 · #3F · VIOLATION CLOSED
DOB permits (last 30)
  • OTApr 27, 2018
    PONICHTERA CONTRACTING IN
  • FSMar 25, 2015
    MICHAEL S. KAPLAN
  • OTMar 28, 2000
    TOP NOTCH CONTRACTING INC
  • OT-
    TROTH CONTRACTING INC
  • PL-
    ORBIT PLBG & HTG INC
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • FS-
    MICHAEL S. KAPLAN
  • PL-
    DUAL FUEL PLUBING & HTING
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    AG CONSTRUCTION GROUP INC
  • OT-
    PONICHTERA CONTRACTING IN
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    TROTH CONTRACTING INC
  • OT-
    PONICHTERA CONTRACTING IN
  • OT-
    PONICHTERA CONTRACTING IN
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    TOP NOTCH CONTRACTING INC
  • OT-
    BALTIC REMODELING INC
DOB violations
  • May 3, 2024BENCH-FAILURE TO BENCHMARK NONE
  • Apr 13, 2022AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Apr 29, 2021EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Apr 24, 2019E-ELEVATOR ELEVATORREQUIRED
  • Aug 9, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • May 2, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 1, 2015E-ELEVATOR ELEVATORREQUIRED
  • Apr 22, 2014E-ELEVATOR ELEVATORREQUIRED
  • Mar 27, 2013E-ELEVATOR ELEVATORREQUIRED
  • Nov 29, 2012E-ELEVATOR ELEVATORREQUIRED
  • Nov 15, 2011E-ELEVATOR ELEVATORREQUIRED
  • Aug 23, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Apr 27, 2006E-ELEVATOR ELEVATORREQUIRED
  • Sep 29, 2005E-ELEVATOR ELEVATORREQUIRED
  • Sep 27, 2004E-ELEVATOR ELEVATORREQUIRED
  • Oct 15, 2003E-ELEVATOR ELEVATORREQUIRED
  • Nov 12, 2002E-ELEVATOR ELEVATORREQUIRED
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Lincoln Square

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1011187501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Jun 3, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
52 permits in the current corpus · latest record Apr 27, 2018

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
31 violations in the current corpus · latest record Oct 27, 2025

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
20 violations in the current corpus · latest record Aug 9, 2024

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lincoln Square market page.