CurbScoop
CurbScoopBuildingsLincoln Square55 CENTRAL PARK WEST

55 CENTRAL PARK WEST

Manhattan· Lincoln Square· built 1930class D4BBL 1011180036

55 CENTRAL PARK WEST is a 109-unit building in Lincoln Square, Manhattan, built in 1930.

1 unit is on the market here right now.

City records show 30 DOB permits and 50 open violations on file.

Units (res)
109
Floors
18.0
Lot ft²
16,677 ft²
Bldg ft²
231,733 ft²
Assessed
$33.1M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
55 CENTRAL PARK WEST #6E
Manhattan · built 1930
Lincoln Square$3.00M-0 ft²3 bd · 3 ba-119
1 HPD-C12 DOBbedbug
14.4Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS LITE (1) AT NORTHWEST STATIONARY WINDOW IN THE 3rd ROOM FROM EAST LOCATED AT APT 2C2FLR, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
    Jul 6, 2023 · #2C2FLR · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2C2FLR, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
    Jul 6, 2023 · #2C2FLR · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS LITE (1) AT NORTHWEST CASEMENT WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT 2C2FLR, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
    Jul 6, 2023 · #2C2FLR · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS LITE (1) AT NORTHWEST CASEMENT WINDOW IN THE 3rd ROOM FROM EAST LOCATED AT APT 2C2FLR, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
    Jul 6, 2023 · #2C2FLR · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS LITE (1) AT CASEMENT WINDOW IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2C2FLR, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
    Jul 6, 2023 · #2C2FLR · NOV SENT OUT
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 15, 2023 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 2, 2022 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 15, 2022 · VIOLATION DISMISSED
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 24, 2016 · VIOLATION DISMISSED
  • C
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WATER DAMAGED CEILING & WALLS SOUTHEAST BATHROOM 15 STY SOUTH APT 15F ER1. LOCATED AT APT 15F
    Aug 12, 1993 · #15F · NOV SENT OUT
DOB permits (last 30)
  • MHJan 11, 2013
    LIEBHABER CONSTRUCTION IN
  • PLNov 13, 2002
    ROYAL FLUSH PLBG & HTG
  • OTJan 16, 2001
    FRANK M DEBONO CONST CO
  • PLAug 21, 2000
    MASTER PLUMBING, HEATING INC.
  • BLJan 7, 1998
    BRYAN A ENNIST
  • OTMay 8, 1996
    H/H BUILDING CONSULTANTS
  • OT-
    J & A INTERIORS INC
  • FB-
    BRYAN A ENNIST
  • MH-
    COIL TECHS HVAS SERVICES
  • MH-
    H/H BUILDING CONSULTANTS
  • OT-
    HITE CONSTRUCTION INC
  • PL-
    ABBA PLG CORP
  • OT-
    FRANK M DEBONO CONST CO
  • MH-
    FRANK M DEBONO CONST CO
  • OT-
    H/H BUILDING CONSULTANTS
  • BL-
    BRYAN A ENNIST
  • EQ-
    PERIMETER BRIDGE & SCAFFOLD
  • MH-
    HAMILTON AIR COMPANY, INC
  • PL-
    MAGNUM PLBG. & HTG CORP.
  • PL-
    EFFECTIVE PLUMBING CORP.
  • PL-
    ANCHOR PLUMBING CORP
  • OT-
    BLUEBIRD CONSTR INC.
  • MH-
    FACET CONSTRUCTION LLC
  • OT-
    FACET CONSTRUCTION LLC
  • PL-
    PRIMO PLBG & HVAC CORP
  • EQ-
    PERIMETER BRIDGE & SCAFFOLD
  • OT-
    STANDARD WATERPROOFING C
  • EQ-
    STANDARD WATERPROOFING C
  • OT-
    SNM CONSTRUCTION LLC
  • MH-
    LIEBHABER CONSTRUCTION IN
DOB violations
  • Aug 23, 2021E-ELEVATOR ELEVATORREQUIRED
  • Aug 23, 2021E-ELEVATOR ELEVATORREQUIRED
  • Aug 23, 2021E-ELEVATOR ELEVATORREQUIRED
  • Dec 23, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • May 27, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 27, 2020E-ELEVATOR ELEVATORREQUIRED
  • Apr 18, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 18, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 18, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 18, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 18, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • May 2, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 2, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 2, 2017E-ELEVATOR ELEVATORREQUIRED
  • May 2, 2017E-ELEVATOR ELEVATORREQUIRED
  • Apr 20, 2016E-ELEVATOR ELEVATORREQUIRED
  • Apr 20, 2016E-ELEVATOR ELEVATORREQUIRED
  • Apr 20, 2016E-ELEVATOR ELEVATORREQUIRED
  • Apr 20, 2016E-ELEVATOR ELEVATORREQUIRED
  • Apr 21, 2015E-ELEVATOR ELEVATORREQUIRED
  • Apr 21, 2015E-ELEVATOR ELEVATORREQUIRED
  • Apr 21, 2015E-ELEVATOR ELEVATORREQUIRED
  • Apr 21, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 1, 2014BENCH-FAILURE TO BENCHMARK NONE
  • Apr 23, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2014E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2014E-ELEVATOR ELEVATORREQUIRED
  • Aug 30, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Mar 28, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 28, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 28, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 27, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 27, 2013E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 2012E-ELEVATOR ELEVATORREQUIRED
  • Mar 16, 2012E-ELEVATOR ELEVATORREQUIRED

More buildings in Lincoln Square

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 10, 2026

Stable property ID: nyc:bbl:1011180036

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Jan 29, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 10, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
298 permits in the current corpus · latest record Jan 11, 2013

Pipeline completed Sep 10, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
10 violations in the current corpus · latest record Jul 12, 2023

Pipeline completed Sep 10, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
94 violations in the current corpus · latest record Nov 7, 2025

Pipeline completed Sep 10, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Lincoln Square market page.