CurbScoop
CurbScoopBuildings116 CENTRAL PARK SOUTH

116 CENTRAL PARK SOUTH

Manhattan· built 1950class RMBBL 1010117503
Open listing source

116 CENTRAL PARK SOUTH is a 78-unit building in Manhattan, built in 1950.

1 unit is on the market here right now.

City records show 30 DOB permits and 80 open violations on file.

Units (res)
78
Floors
18.0
Lot ft²
13,512 ft²
Bldg ft²
90,250 ft²
Assessed
$14.8M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
116 CENTRAL PARK SOUTH #9A
Manhattan · built 1950
-$2.67M$2,2291,200 ft²2 bd · 2 ba-24
9 HPD-C2 DOBbedbug
21.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Sep 6, 2026 · VIOLATION OPEN
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Sep 6, 2026 · VIOLATION OPEN
  • A
    §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE
    Sep 6, 2026 · VIOLATION OPEN
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 8D, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Sep 6, 2026 · #8D · VIOLATION OPEN
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Sep 6, 2026 · VIOLATION OPEN
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Sep 6, 2026 · VIOLATION OPEN
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Oct 4, 2020 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Oct 4, 2020 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT WALL AT PUBLIC HALL, 1st STORY
    Oct 4, 2020 · NOV SENT OUT
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX NOTICE MISSING AT WALL AT PUBLIC HALL, 1st STORY
    Oct 4, 2020 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM NOTICE MISSING AT WALL AT PUBLIC HALL, 1st STORY
    Oct 4, 2020 · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT VESTIBULE AT PUBLIC HALL, 1st STORY
    Dec 16, 2019 · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND NORTH WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 17N, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 16, 2019 · #17N · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 17N, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 16, 2019 · #17N · NOV SENT OUT
  • A
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET COVER PLATE AT WEST WALL IN THE KITCHEN LOCATED AT APT 17N, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 16, 2019 · #17N · NOV SENT OUT
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FORMICA COUNTER TOP AT SINK IN THE KITCHEN LOCATED AT APT 17N, 17th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Dec 16, 2019 · #17N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT VESTIBULE AT PUBLIC HALL, 1st STORY
    Dec 16, 2019 · NOV SENT OUT
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 11N, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
    Nov 13, 2017 · #11N · NOV SENT OUT
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 4; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 11N, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Oct 13, 2017 · #11N · NOV SENT OUT
  • I
    SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE ?27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 1, 2015 · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE TERRACOTTA FLOOR TILE AT TERRACE LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 25, 2008 · #11C · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 25, 2008 · #11C · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ' IN THE BATHROOM LOCATED AT APT 11C, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jul 25, 2008 · #11C · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 24, 2001 · #4A · NOV SENT OUT
  • A
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE THREE GLASS PANES IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Jul 24, 2001 · #4A · NOV SENT OUT
  • C
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MASONRY & PLASTER CEILING CENTER ROOM 10 STY SOUTHEAST APT 10A ER1 , SECTION '' ''
    Aug 18, 1997 · #10A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK BATHROOM & CENTER ROOM 10 STY SOUTHEAST APT 10A ER1 , SECTION '' ''
    Aug 18, 1997 · #10A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CASCADING WATER LEAK FROM CEILING SOUTH ROOM 10 STY SOUTH APT 10A ER1 , SECTION '' ''
    Apr 19, 1997 · #10A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL & CEILINGS SOUTH ROOM 10 STY SOUTH APT 10A ER1 , SECTION '' ''
    Apr 19, 1997 · #10A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & WALL NORTH ROOM 10 STY NORTH APT 10A. , SECTION '' ''
    Jan 20, 1997 · #10A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING 10 STY SOUTHEAST APT 10A SOUTHEAST ROOM. , SECTION '' ''
    Jan 17, 1997 · #10A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK TERRACE OVER SOUTHEAST ROOM 10 STY SOUTHEAST APT 10A ER1. , SECTION '' ''
    Oct 24, 1996 · #10A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT PLASTER CEILING AT SOUTHEAST ROOM 10 STY SOUTHEAST APT 10A. , SECTION '' ''
    Oct 24, 1996 · #10A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILIGN EAST & WEST SOUTHEAST ROOM 10 STY SOUTH APT 10A 1 FROM EAST SOUTH SECTION , SECTION '' ''
    Sep 19, 1996 · #10A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL SOUTHWEST CORNER SOUTHEATS ROOM 10 STY SOUTH APT 10A 1 FROM EAST SOTUH SECTION , SECTION '' ''
    Sep 19, 1996 · #10A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EVIDENCE WATER SEEPAGE CEILING SOUTHEAST ROOM 10 STY SOUTH APT 10A 1 FROM EAST SOUTH SECTION , SECTION '' ''
    Sep 19, 1996 · #10A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLE & HOUSEHOLD ARTICLES PENTHOUSE PUBLIC HALL EAST SECTION.
    Jun 28, 1988 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING KNOB LAUNDRY ROOM DOOR CELLAR.
    Jun 28, 1988 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS INCINERATOR CELLAR.
    Jun 28, 1988 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS STEAM ROOM CELLAR.
    Jun 28, 1988 · FIRST NO ACCESS TO RE- INSPECT VIOLATION
DOB permits (last 30)
  • PLOct 3, 1996
    FOUR STAR MECHANICAL ,INC.
  • EQMay 24, 1995
    PANE STONE CONSTRUCTION CORP.
  • SPNov 24, 1993
    CROOM PLG. + HTG. CORP.
  • OT-
    KAY WATERPROOF.
  • MH-
    MOUNTAIN AIR MECHANICAL*
  • OT-
    TALCO CONSTRUCTION INC
  • MH-
    TECHNOCRAFT INC
  • PL-
    EAGLE MECHANICAL INC
  • PL-
    RITE WAY PLUMBING & HEATI
  • OT-
    SAGE CONSTRUCTION SERVICE
  • MH-
    SAGE CONSTRUCTION SERVICE
  • OT-
    MJ CUSTOM BUILT CONSTRUCTION INC
  • OT-
    MJ CUSTOM BUILT CONST.INC.
  • OT-
    PENTA RESTORATION CORP
  • OT-
    CENTIFIED CONTRACTING ,INC.
  • OT-
    CENTIFIED CONTRACTING ,INC.
  • OT-
    CENTIFIED CONTRACTING ,INC.
  • OT-
    CENTIFIED CONTRACTING ,INC.
  • MH-
    PROSTAT CONSTRUCTION
  • BL-
    BANA PLUMBING & HEATING CO. INC.
  • OT-
    PENTA RESTORATION CORP
  • PL-
    ADS PLUMBING & HEATING INC
  • PL-
    ADS PLUMBING & HEATING INC
  • PL-
    ADS PLUMBING & HEATING INC
  • PL-
    ADS PLUMBING & HEATING INC
  • OT-
    PENTA RESTORATION CORP
  • EQ-
    ROCKLEDGE SCAFFOLD
  • OT-
    EYECRAVE CONSTRUC INC
  • PL-
    COCHRANE PLBG & HTG
  • EQ-
    INTERSYSTEMS CORPORATION
DOB violations
  • Oct 22, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2021E-ELEVATOR ELEVATORREQUIRED
  • Oct 3, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 3, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 3, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 3, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 12, 2019E-ELEVATOR ELEVATORREQUIRED
  • Nov 26, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 26, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 26, 2018E-ELEVATOR ELEVATORREQUIRED
  • Nov 26, 2018E-ELEVATOR ELEVATORREQUIRED
  • Oct 5, 2016AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 31, 2016E-ELEVATOR ELEVATORREQUIRED
  • Aug 31, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 22, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2013E-ELEVATOR ELEVATORREQUIRED
  • Feb 16, 2012E-ELEVATOR ELEVATORREQUIRED
  • Feb 16, 2012E-ELEVATOR ELEVATORREQUIRED
  • Feb 16, 2012E-ELEVATOR ELEVATORREQUIRED
  • Nov 26, 2008E-ELEVATOR ELEVATORREQUIRED

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1010117503

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Aug 7, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
121 permits in the current corpus · latest record Oct 3, 1996

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
75 violations in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
65 violations in the current corpus · latest record Apr 26, 2024

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.