CurbScoop
CurbScoopBuildingsGramercy Park205 3 AVENUE

205 3 AVENUE

Manhattan· Gramercy Park· built 1964class D4BBL 1008990001
Open listing source

205 3 AVENUE is a 326-unit building in Gramercy Park, Manhattan, built in 1964.

2 units are on the market here right now.

City records show 30 DOB permits and 59 open violations on file.

Units (res)
326
Floors
20.0
Lot ft²
26,312 ft²
Bldg ft²
358,898 ft²
Assessed
$49.9M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
205 3 AVENUE #9M
Manhattan · built 1964
Gramercy Park$750K-0 ft²1 bd · 1 ba-0
1 HPD-C8 DOBbedbug
13.7Source
205 3 AVENUE #20C
Manhattan · built 1964
Gramercy Park$950K-0 ft²1 bd · 1 ba-21
1 HPD-C8 DOBbedbug
13.7Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 23, 2023 · #6H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
    Aug 23, 2023 · #6H · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH IN THE 3rd ROOM FROM NORTH LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Mar 8, 2019 · #10D · INVALID CERTIFICATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2L, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Aug 18, 2018 · #2L · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2L, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Aug 18, 2018 · #2L · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2L, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Aug 18, 2018 · #2L · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Aug 18, 2018 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Aug 18, 2018 · #2L · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2L, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST
    Aug 18, 2018 · #2L · VIOLATION CLOSED
  • A
    SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE LOCATED AT APT 7R, 7th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Apr 17, 2005 · #7R · VIOLATION CLOSED
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 7R, 7th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Apr 17, 2005 · #7R · NOT COMPLIED WITH
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE WALL AT TUB IN THE BATHROOM LOCATED AT APT 7R, 7th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Apr 17, 2005 · #7R · NOT COMPLIED WITH
  • B
    SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 7R, 7th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Apr 17, 2005 · #7R · VIOLATION CLOSED
  • A
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE PEEPHOLE AT DOOR IN THE ENTRANCE LOCATED AT APT 7R, 7th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
    Apr 17, 2005 · #7R · VIOLATION CLOSED
  • A
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING RADIATOR CONTROL KNOB IN THE 1st ROOM FROM NORTH LOCATED AT APT 7R, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Mar 28, 2005 · #7R · VIOLATION CLOSED
  • A
    SECTION 27-2005 ADM CODE REFIT CLOSET DOORS IN THE ENTIRE APARTMENT LOCATED AT APT 7R, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Mar 28, 2005 · #7R · NOT COMPLIED WITH
  • B
    SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... CEILING IN THE BATHROOM LOCATED AT APT 7R, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 19, 2004 · #7R · NOT COMPLIED WITH
  • B
    SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7R, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 19, 2004 · #7R · VIOLATION CLOSED
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTHWALL IN THE KITCHEN LOCATED AT APT 7R, 7th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Oct 19, 2004 · #7R · VIOLATION CLOSED
DOB permits (last 30)
  • PLSep 16, 2014
    TESTERMAN PLBG & HTG INC
  • OTMar 23, 2006
    N.Y CUSTOM HOME AND REMODELING I
  • OTJan 3, 2005
    MCCCORMACK CONTRACTING INC
  • SPSep 23, 2003
  • EQJul 23, 1992
    ROCKLEDGE CONST.CO.
  • OT-
    CONTROLLED COMBUSTION
  • OT-
    DBD SERVICES
  • PL-
    C & T PLUMBING & HTG INC
  • OT-
    SKYLINE RESTORATION INC
  • FS-
    CONTROLLED COMBUSTION
  • OT-
    AMERICAN INDUSTRIES LLC
  • OT-
    VICTORY DRY CLEANING SYSTEM DBA
  • PL-
    EVERYDAY MECHANICAL CORP
  • PL-
    N.KOFSKY
  • OT-
    EUDA CONSTRUCTION AND DES
  • OT-
    BEST VALUE CONT. CORP
  • OT-
    AMERICAN INDUSTRIES LLC
  • FB-
    CONTROLLED COMBUSTION
  • OT-
    LELCAJ CONSTRUCTION LLC
  • OT-
    DNA CONTRACTING LLC
  • OT-
    INSIDESQUAD INC
  • PL-
    JOHNNY'S P&H CONTRAC INC
  • OT-
    AMERICAN INDUSTRIES LLC
  • PL-
    INS DYNAMICS INC
  • PL-
    EFFECTIVE PLUMGING
  • PL-
    EVERYDAY MECHANICAL CORP
  • MH-
    AMERICAN INDUSTRIES LLC
  • PL-
    A.M.N. CORPORATION
  • OT-
    MK CONTRACTING GROUP INC
  • OT-
    R & SS GENERAL CONSTRUCTI
DOB violations
  • Nov 14, 2025HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Nov 14, 2025HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Sep 23, 2024HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Sep 23, 2024HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Sep 2, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Mar 16, 2020HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
  • Mar 9, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 9, 2020E-ELEVATOR ELEVATORREQUIRED
  • Oct 17, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Oct 17, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Oct 17, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Oct 17, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 14, 2019E-ELEVATOR ELEVATORREQUIRED
  • Feb 14, 2019E-ELEVATOR ELEVATORREQUIRED
  • Feb 14, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 28, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 28, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 28, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Mar 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Mar 13, 2017E-ELEVATOR ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 19, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jan 19, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jan 19, 2015E-ELEVATOR ELEVATORREQUIRED
  • Mar 1, 2013LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Mar 1, 2013LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 22, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 22, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jul 13, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 11, 2011P-PLUMBING NONE
  • May 11, 2011P-PLUMBING NONE
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 13, 2009E-ELEVATOR ELEVATORREQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 28, 2008E-ELEVATOR ELEVATORREQUIRED

More buildings in Gramercy Park

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1008990001

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Jun 16, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
171 permits in the current corpus · latest record Sep 16, 2014

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
19 violations in the current corpus · latest record Aug 24, 2023

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
95 violations in the current corpus · latest record Mar 16, 2026

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Gramercy Park market page.