CurbScoop
CurbScoopBuildingsKips Bay140 EAST 28 STREET

140 EAST 28 STREET

Manhattan· Kips Bay· built 1931class D4BBL 1008830058
Open listing source

140 EAST 28 STREET is a 107-unit building in Kips Bay, Manhattan, built in 1931.

1 unit is on the market here right now.

City records show 30 DOB permits and 63 open violations on file.

Units (res)
107
Floors
13.0
Lot ft²
11,109 ft²
Bldg ft²
98,359 ft²
Assessed
$13.5M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
140 EAST 28 STREET #10C
Manhattan · built 1931
Kips Bay$350K$609575 ft²studio · 1 ba-131
6 HPD-C16 DOBbedbug
24.4Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) 1st CLOSET FROM SOUTH AT WEST WALL DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    SECTION 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 7; WG TO REPLACE = 0; WG TO REPAIR = 0; LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    SECTION 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERABLE LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING TWO ELECTRIC SWITCH COVERS AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRIC OUTLET COVER AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) 2nd CLOSET FROM SOUTH AT WEST WALL DOOR, 2nd CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) 1st DOOR FROM NORTH AT EAST WALL IN THE 1st BATHROOM LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) 1st RADIATOR FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 1st BATHROOM LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE 1st BATHROOM LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERABLE LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    SECTION 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BATHTUB IN THE 1st BATHROOM LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    SECTION 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BASIN IN THE 1st BATHROOM LOCATED AT APT 10G, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    May 14, 2014 · #10G · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
    Oct 17, 2008 · #2B · NOV SENT OUT
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
    Oct 17, 2008 · #2B · NOV SENT OUT
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
    Sep 19, 2008 · #2B · NOV SENT OUT
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
    May 3, 2006 · #2B · NOV SENT OUT
  • B
    SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS SINK IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Aug 20, 2005 · #2B · NOV SENT OUT
  • A
    SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Aug 20, 2005 · #2B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 27, 2004 · #2B · NOV SENT OUT
  • B
    SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
    Mar 27, 2004 · #2B · NOV SENT OUT
DOB permits (last 30)
  • PLSep 19, 2003
    R.J.C. MECHANICAL CORP
  • OTMay 2, 2002
    CLASSIC CONSULTING GROUP INC.
  • MH-
    KEM CONSTRUCION ENTERPRISES CORP
  • OT-
    MINCH CONSTRUCTION
  • OT-
    JAMES ADAMS CONTRACTING
  • OT-
    MAREK SZMACINSKI
  • OT-
    ADRIATIC CONTACTORS INC
  • OT-
    CELLULAS TELEPHONE CO./D/B/A CEL
  • MH-
    CELLULAS TELEPHONE CO./D/B/A CEL
  • OT-
    CELLULAS TELEPHONE CO./D/B/A CEL
  • OT-
    ART-B CONSTRUCTION CORP
  • OT-
    INTERIOR RENOVATIONS
  • EQ-
    COLGATE SCAFFOLDING
  • FB-
    C C CONTROLLED COMBUSTION
  • OT-
    PREFERRED BUILDERS INC
  • PL-
    A.M.N. CORPORATION
  • MH-
    CELLULAS TELEPHONE CO./D/B/A CEL
  • PL-
    ZEFI PLUMBING AND HEATING
  • OT-
    HORIZON ORGANIZATION LLC
  • MH-
    CELLULAS TELEPHONE CO./D/B/A CEL
  • OT-
    CELLULAS TELEPHONE CO./D/B/A CEL
  • OT-
    MICHAEL SHEEHAN CONSTRUCTION
  • OT-
    JERRICK ASSOCIATES, INC.
  • OT-
    TOUCH OF CLASS GENERAL
  • OT-
    MINCH CONSTRUCTION
  • OT-
    MINCH CONSTRUCTION CORP
  • OT-
    STEVE MAR CONSTRUCTION
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    SB RENOVATIONS LLC
  • EQ-
    ROCKLEDGE SCAFFOLD
DOB violations
  • Jun 23, 2024EARCX-FAILURE TO SUBMIT EER NONE
  • Feb 21, 2024FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Nov 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Sep 2, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Mar 10, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 10, 2020E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Feb 22, 2019E-ELEVATOR ELEVATORREQUIRED
  • Feb 22, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Feb 22, 2016E-ELEVATOR ELEVATORREQUIRED
  • Feb 22, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 3, 2015LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 13, 2015E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2015E-ELEVATOR ELEVATORREQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Mar 31, 2014EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Jan 14, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 14, 2014E-ELEVATOR ELEVATORREQUIRED
  • Mar 1, 2013LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 2, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 2, 2013E-ELEVATOR ELEVATORREQUIRED
  • Dec 11, 2012E-ELEVATOR ELEVATORREQUIRED
  • Dec 11, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 17, 2012AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 13, 2011EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jul 13, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jul 13, 2011E-ELEVATOR ELEVATORREQUIRED
  • Jun 21, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jun 21, 2010E-ELEVATOR ELEVATORREQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 27, 2008E-ELEVATOR ELEVATORREQUIRED

More buildings in Kips Bay

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1008830058

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Mar 2, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
88 permits in the current corpus · latest record Sep 19, 2003

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
23 violations in the current corpus · latest record Dec 2, 2015

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
60 violations in the current corpus · latest record Apr 30, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Kips Bay market page.