CurbScoop
CurbScoopBuildings16 WEST 40 STREET

16 WEST 40 STREET

Manhattan· built 2015class RMBBL 1008417501
Open listing source

16 WEST 40 STREET is a 57-unit building in Manhattan, built in 2015.

7 units are on the market here right now.

City records show 30 DOB permits and 26 open violations on file.

Units (res)
57
Floors
33.0
Lot ft²
12,178 ft²
Bldg ft²
184,712 ft²
Assessed
$42.8M
DOF total
Comps L5y
0

Active sale listings (7)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
16 WEST 40 STREET #30B
Manhattan · built 2015
-$4.90M$2,3692,068 ft²3 bd · 3 ba-1005
1 HPD-C8 DOBbedbug
11.9Source
16 WEST 40 STREET #18D
Manhattan · built 2015
-$1.79M$1,6771,067 ft²1 bd · 1 ba-60
1 HPD-C8 DOBbedbug
11.9Source
16 WEST 40 STREET #21D
Manhattan · built 2015
-$2.10M$1,9681,067 ft²1 bd · 1 ba-74
1 HPD-C8 DOBbedbug
11.9Source
16 WEST 40 STREET #PHS
Manhattan · built 2015
-$14.9M$3,6664,078 ft²3 bd · 3 ba-178
1 HPD-C8 DOBbedbug
11.9Source
16 WEST 40 STREET #20B
Manhattan · built 2015
-$1.95M$1,8161,074 ft²1 bd · 1 ba-71
1 HPD-C8 DOBbedbug
11.9Source
16 WEST 40 STREET #21D
Manhattan · built 2015
-$1.99M$1,8651,067 ft²1 bd · 1 ba-156
1 HPD-C8 DOBbedbug
11.9Source
16 WEST 40 STREET #PHN
Manhattan · built 2015
-$15.8M$3,7834,163 ft²4 bd · 4 ba-105
1 HPD-C8 DOBbedbug
11.9Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE EAST WALL IN THE BATHROOM LOCATED AT APT 22A, 22nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 16, 2023 · #22A · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE BASIN SINK IN THE BATHROOM LOCATED AT APT 22A, 22nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 16, 2023 · #22A · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WATER CLOSET IN THE BATHROOM LOCATED AT APT 22A, 22nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Jun 16, 2023 · #22A · NOV SENT OUT
  • C
    § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET ... IN THE BATHROOM LOCATED AT APT 22A, 21st STORY, 1st APARTMENT FROM WEST AT NORTH
    May 16, 2022 · #22A · VIOLATION CLOSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 20, 2021 · VIOLATION DISMISSED
DOB permits (last 30)
  • FO-
    T.G. NICKEL & ASSOCIATES
  • NB-
    CONSIGLI & ASSOCIATES LLC
  • EQ-
    CONSIGLI & ASSOCIATES LLC
  • NB-
    ELYSIUM CONSTRUCTION INC
  • PL-
    FAST REPAIR,INC
  • NB-
    NAF CONSTRUCTION MANAGEME
  • EQ-
    NAF CONSTRUCTION MANAGEME
  • PL-
    PETER MICELI PLUMBING
  • OT-
    AERIAL DESIGN BUILD SVCS
  • MH-
    AERIAL DESIGN BUILD SVCS
  • PL-
    AQUEDUCT MECHANICAL CORP
  • SP-
    AQUEDUCT MECHANICAL CORP
  • NB-
    T.G. NICKEL & ASSOCIATES
  • NB-
    ELYSIUM CONSTRUCTION INC
  • EQ-
    T.G. NICKEL & ASSOCIATES
  • NB-
    ELYSIUM CONSTRUCTION INC
  • EQ-
    T.G. NICKEL & ASSOCIATES
  • PL-
    RCI PLBG, INC
  • PL-
    RCI PLBG, INC
  • EQ-
    T.G. NICKEL & ASSOCIATES
  • PL-
    RCI PLBG, INC
  • EQ-
    T.G. NICKEL & ASSOCIATES
  • PL-
    PETER MICELI PLUMBING
  • PL-
    PETER MICELI PLUMBING
  • EQ-
    T.G. NICKEL & ASSOCIATES
  • FO-
    T.G. NICKEL & ASSOCIATES
  • PL-
    RCI PLBG, INC
  • NB-
    NAF CONSTRUCTION MANAGEME
  • OT-
    AERIAL DESIGN BUILD SVCS
  • MH-
    AERIAL DESIGN BUILD SVCS
DOB violations
  • Feb 10, 2026C-CONSTRUCTION OTHER OPTIONAL
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 30, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 22, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Aug 14, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 4, 2021C-CONSTRUCTION OTHER OPTIONAL
  • Aug 18, 2020E-ELEVATOR ELEVATORREQUIRED
  • Aug 18, 2020E-ELEVATOR ELEVATORREQUIRED
  • Feb 18, 2020C-CONSTRUCTION OTHER OPTIONAL
  • Nov 5, 2019E-ELEVATOR ELEVATORREQUIRED
  • Nov 5, 2019E-ELEVATOR ELEVATORREQUIRED
  • Nov 5, 2019E-ELEVATOR ELEVATORREQUIRED
  • Oct 31, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Oct 3, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 13, 2018C-CONSTRUCTION OTHER OPTIONAL
  • Jul 11, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 24, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1008417501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
7 active sale listings in the current corpus · latest record Jun 26, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
43 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
5 violations in the current corpus · latest record Jun 20, 2023

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
21 violations in the current corpus · latest record Feb 10, 2026

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.