CurbScoop
CurbScoopBuildingsChelsea146 WEST 26 STREET

146 WEST 26 STREET

Manhattan· Chelsea· built 1922class RMBBL 1008017502
Open listing source

146 WEST 26 STREET is a 25-unit building in Chelsea, Manhattan, built in 1922.

1 unit is on the market here right now.

City records show 30 DOB permits and 27 open violations on file.

Units (res)
25
Floors
9.0
Lot ft²
6,883 ft²
Bldg ft²
53,491 ft²
Assessed
$7.87M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
150 WEST 26 STREET #401
Manhattan · built 1922
Chelsea$2.10M$1,2921,626 ft²2 bd · 2 ba-39
3 DOBbedbug
7.8Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 15, 2023 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Feb 16, 2022 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 1, 2021 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Oct 25, 2019 · VIOLATION DISMISSED
DOB permits (last 30)
  • PLNov 10, 2016
    ORBIT PLBG & HTG INC
  • SPSep 14, 2004
    BHI INC.
  • EQApr 7, 2004
    COLGATE SCAFFOLDING & EQPT CORP
  • PL-
    AMANICK PLBG AND HTG CORP
  • PL-
    ORBIT PLBG & HTG INC
  • OT-
    FLAG WATERPROOF. REST. CORP
  • MH-
    NY LOFT LLC
  • EQ-
    SPRING SCAFFOLDING LLC
  • EQ-
    SPRING SCAFFOLDING LLC
  • OT-
    INTERIOR FINISHES INC
  • OT-
    ALL DIMENSION HOME IMPROV
  • PL-
    PRECISION PLBG SVCS., INC
  • EQ-
    EVEREST SCAFFOLDING INC
  • EQ-
    COLGATE SCAFFOLDING & EQPT CORP
  • OT-
    URBAN HOMES REMODELING IN
  • OT-
    HD BUILDERS GROUP INC.
  • PL-
    CHINATOWN PLUMB HEAT. INC.
  • EQ-
    COLGATE SCAFFOLDING & EQPT CORP
  • EQ-
    COLGATE SCAFFOLDING & EQPT CORP
  • PL-
    MAGNUM PLBG. & HTG CORP.
  • OT-
    ACER RESTORATIONS, LLC.
  • OT-
    ACER RESTORATION, LLC
  • EQ-
    LUSHEBA CONTRACTING INC
  • MH-
    LUSHEBA CONTRACTING INC
  • SP-
    ORBIT SPRINKLER CORP
  • OT-
    SEGMA CONTRACTING SVC INC
  • EQ-
    ROCK GROUP NY CORP
  • OT-
    CENTRAL CONSTRUCTION MANA
  • OT-
    URBAN HOMES REMODELING IN
  • OT-
    D L ASSOC.
DOB violations
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Feb 3, 2016E-ELEVATOR ELEVATORREQUIRED
  • Feb 3, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 15, 2014LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Sep 11, 2013E-ELEVATOR ELEVATORREQUIRED
  • Sep 11, 2013E-ELEVATOR ELEVATORREQUIRED
  • Feb 14, 2013LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
  • Jun 19, 2011E-ELEVATOR ELEVATORREQUIRED
  • Feb 9, 2011E-ELEVATOR ELEVATORREQUIRED
  • May 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • May 6, 2010E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • May 14, 2008E-ELEVATOR ELEVATORREQUIRED
  • May 14, 2008E-ELEVATOR ELEVATORREQUIRED
  • Oct 31, 2007C-CONSTRUCTION OTHER OPTIONAL
  • Jul 5, 2007E-ELEVATOR ELEVATORREQUIRED
  • Jul 5, 2007E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2006E-ELEVATOR ELEVATORREQUIRED
  • Sep 28, 2006E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2005LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 31, 2005LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings in Chelsea

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1008017502

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record May 4, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 10, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
100 permits in the current corpus · latest record Nov 10, 2016

Pipeline completed Sep 10, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
4 violations in the current corpus · latest record Nov 16, 2023

Pipeline completed Sep 10, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
23 violations in the current corpus · latest record Aug 13, 2019

Pipeline completed Sep 10, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Chelsea market page.