CurbScoop
CurbScoopBuildingsWest Chelsea555 WEST 23 STREET

555 WEST 23 STREET

Manhattan· West Chelsea· built 2005class RMBBL 1006957503
Open listing source

555 WEST 23 STREET is a 336-unit building in West Chelsea, Manhattan, built in 2005.

5 units are on the market here right now.

City records show 30 DOB permits and 50 open violations on file.

Units (res)
336
Floors
14.0
Lot ft²
19,750 ft²
Bldg ft²
265,686 ft²
Assessed
$47.9M
DOF total
Comps L5y
0

Active sale listings (5)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
555 WEST 23 STREET #N10J
Manhattan · built 2005
West Chelsea$1.25M$1,866670 ft²1 bd · 1 ba-60
1 HPD-C14 DOBbedbug
17.9Source
555 WEST 23 STREET #S5R
Manhattan · built 2005
West Chelsea$1.20M$1,408852 ft²1 bd · 1 ba-128
1 HPD-C14 DOBbedbug
17.9Source
555 WEST 23 STREET #S11L
Manhattan · built 2005
West Chelsea$1.90M$1,7561,079 ft²2 bd · 2 ba-122
1 HPD-C14 DOBbedbug
17.9Source
555 WEST 23 STREET #N9N
Manhattan · built 2005
West Chelsea$1.35M$1,800750 ft²1 bd · 1 ba-56
1 HPD-C14 DOBbedbug
17.9Source
555 WEST 23 STREET #S12R
Manhattan · built 2005
West Chelsea$1.15M$1,350852 ft²1 bd · 1 ba-97
1 HPD-C14 DOBbedbug
17.9Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 2, 2022 · VIOLATION DISMISSED
  • A
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT N3A, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Jul 31, 2018 · #N3A · VIOLATION DISMISSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
    Jul 31, 2018 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Jul 31, 2018 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGN MISSING AT PUBLIC HALL, 1st STORY
    Jul 31, 2018 · NOV SENT OUT
  • A
    § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... ALL WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT N3A, 3rd STORY, 4th APARTMENT FROM EAST AT SOUTH
    Jul 31, 2018 · #N3A · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Jul 31, 2018 · VIOLATION DISMISSED
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Jul 31, 2018 · VIOLATION DISMISSED
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY
    Jul 31, 2018 · VIOLATION DISMISSED
  • A
    § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT PUBLIC HALL, 1st STORY
    Jul 31, 2018 · VIOLATION DISMISSED
DOB permits (last 30)
  • OTMar 24, 2006
    K CONSTRUCTION CO.NYC
  • PL-
    PIPELINE PLUS, LLC
  • PL-
    24 SEVEN PLUMBING INC
  • SP-
    ALLSTATE SPRINKLER CORP
  • MH-
    SUCCESS CONTACT INC
  • OT-
    SUCCESS CONTACT INC
  • PL-
    TITAN PLBG & HTG INC
  • EQ-
    JE LEVINE BUILDERS
  • OT-
    GABE CONSTRUCTION AND DEV
  • OT-
    NEW REGAL CONSTRUCTION IN
  • MH-
    NEW REGAL CONSTRUCTION IN
  • SP-
    ALLSTATE SPRINKLER CORP
  • PL-
    EMR MECHANICAL CORP
  • OT-
    K CONSTRUCTION CO.NYC
  • SP-
    PIPELINE PLUS, LLC
  • FP-
    CHEIF FIRE PERVENTION& MECH CORP
  • MH-
    AIR TECH COOLING INC
  • SP-
    ABR PLBG & HTG CONTR. INC
  • EQ-
    JE LEVINE BUILDERS
  • NB-
    JE LEVINE BUILDERS
  • MH-
    J.E. LEVINE BUILDERS INC
  • OT-
    J.E. LEVINE BUILDERS INC
  • OT-
    J.E. LEVINE BUILDERS INC
  • SP-
    PLUMBING NYC, INC
  • SP-
    COD MECHANICAL CORP
  • OT-
    TUC-MEN CONTRACTING CORP
  • SP-
    R.J.C. MECHANICAL CORP
  • OT-
    EAST SIDE INTERIORS INC
  • EQ-
    WEST VILLAGE GC LLC
  • OT-
    AMERICAN CAR LIFT STRVIC
DOB violations
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 6, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 6, 2021E-ELEVATOR ELEVATORREQUIRED
  • Jan 6, 2021E-ELEVATOR ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Sep 6, 2019ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Mar 18, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • Jan 15, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 15, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 15, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jan 15, 2019E-ELEVATOR ELEVATORREQUIRED
  • Sep 22, 2018P-PLUMBING NONE
  • Mar 27, 2018EARCX-FAILURE TO SUBMIT EER NONE
  • Jan 16, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 16, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 16, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 16, 2018E-ELEVATOR ELEVATORREQUIRED
  • Oct 25, 2017EARCX-FAILURE TO SUBMIT EER NONE
  • Oct 16, 2017EARCX-FAILURE TO SUBMIT EER NONE
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 13, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jan 13, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2014E-ELEVATOR ELEVATORREQUIRED
  • May 9, 2014E-ELEVATOR ELEVATORREQUIRED
  • Jan 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Oct 2, 2008C-CONSTRUCTION OTHER OPTIONAL

More buildings in West Chelsea

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1006957503

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
5 active sale listings in the current corpus · latest record Jul 6, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
80 permits in the current corpus · latest record Mar 24, 2006

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
10 violations in the current corpus · latest record Nov 16, 2022

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
45 violations in the current corpus · latest record Aug 8, 2023

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the West Chelsea market page.