CurbScoop
CurbScoopBuildingsNolita237 LAFAYETTE STREET

237 LAFAYETTE STREET

Manhattan· Nolita· built 1911class D0BBL 1004950002

237 LAFAYETTE STREET is a 21-unit building in Nolita, Manhattan, built in 1911.

1 unit is on the market here right now.

City records show 30 DOB permits and 44 open violations on file.

Units (res)
21
Floors
12.0
Lot ft²
5,005 ft²
Bldg ft²
54,431 ft²
Assessed
$7.84M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
237 LAFAYETTE STREET #9E
Manhattan · built 1911
Nolita$3.40M-0 ft²3 bd · 2 ba-63
1 HPD-C14 DOBbedbug
14.5Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 9E, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 29, 2020 · #9E · NOTICE OF ISSUANCE SENT TO TENANT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 9E, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 29, 2020 · #9E · NOV SENT OUT
  • A
    § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST LOCATED AT APT 9E, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 29, 2020 · #9E · NOV SENT OUT
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 9E, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 29, 2020 · #9E · NOV SENT OUT
DOB permits (last 30)
  • PLDec 13, 1991
    MARIO MORAMACO INC.
  • OT-
    BULADO GENERAL CONTRACTOR
  • PL-
    TMS PLBG & HEATING CORP
  • PL-
    DEMAR MECHANICAL INC
  • PL-
    ASHLAND PLBG CORP
  • MH-
    BSC CONSTRUCTION
  • OT-
    BSC CONSTRUCTION
  • SP-
    ARMON MECHANICAL INC
  • SP-
    DEMAR PLUMBING CORP
  • MH-
    TRIPLE 8 CONSTRUCTION INC
  • PL-
    ASHLAND PLBG CORP
  • AL-
    BLACKSTONE CONST&MGNT GR
  • OT-
    COCO CONSTRUCTION INC
  • OT-
    TRIPLE 8 CONSTRUCTION INC
  • EQ-
    POWERS BRIDGING & SCAFFOLDING
  • PL-
    ALL AMERICAN PLUMBING & HEATING
  • PL-
    DEMAR PLUMBING CORP
  • BL-
    DEMAR PLUMBING CORP
  • OT-
    LAREDO CONSTRUCTION
  • MH-
    COCO CONSTRUCTION INC
  • EQ-
    SPRING ENTERPRIS INC.
  • SP-
    BIG APPLE FIRE SP. COMP. INC.
  • OT-
    FORT-CICA ROOFING & GEN
  • PL-
    AMM GEN'L CONTRACTING INC
  • PL-
    VENDOLA, INC
  • EQ-
    ROCKLEDGE SCAFFOLD CORP
  • OT-
    WINICK PRODUCTIONS, LLC
  • OT-
    FORT-CICA ROOFING & GEN
  • PL-
    GOWIE PLBG
  • OT-
    JUST COOLING CORP
DOB violations
  • Jul 21, 2021FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Jul 21, 2021FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Apr 12, 2021E-ELEVATOR ELEVATORREQUIRED
  • Apr 12, 2021E-ELEVATOR ELEVATORREQUIRED
  • Apr 12, 2021E-ELEVATOR ELEVATORREQUIRED
  • Mar 31, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 31, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 31, 2020E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 23, 2019E-ELEVATOR ELEVATORREQUIRED
  • Apr 11, 2017E-ELEVATOR ELEVATORREQUIRED
  • Apr 11, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Nov 14, 2016ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Mar 11, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 11, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 11, 2016E-ELEVATOR ELEVATORREQUIRED
  • May 2, 2015BENCH-FAILURE TO BENCHMARK NONE
  • Mar 18, 2015E-ELEVATOR ELEVATORREQUIRED
  • Mar 18, 2015E-ELEVATOR ELEVATORREQUIRED
  • May 1, 2014BENCH-FAILURE TO BENCHMARK NONE
  • Oct 31, 2013E-ELEVATOR ELEVATORREQUIRED
  • Oct 31, 2013E-ELEVATOR ELEVATORREQUIRED
  • May 3, 2012BENCH-FAILURE TO BENCHMARK NONE
  • Mar 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Mar 22, 2010E-ELEVATOR ELEVATORREQUIRED
  • Apr 20, 2009E-ELEVATOR ELEVATORREQUIRED
  • Apr 20, 2009E-ELEVATOR ELEVATORREQUIRED
  • Apr 20, 2009E-ELEVATOR ELEVATORREQUIRED
  • Nov 6, 2008E-ELEVATOR ELEVATORREQUIRED
  • Nov 8, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 8, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 8, 2007E-ELEVATOR ELEVATORREQUIRED
  • Nov 8, 2007E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 2007E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 2007E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 2007E-ELEVATOR ELEVATORREQUIRED

More buildings in Nolita

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1004950002

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 8, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
78 permits in the current corpus · latest record Dec 13, 1991

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
4 violations in the current corpus · latest record Oct 1, 2020

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
67 violations in the current corpus · latest record Oct 29, 2021

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Nolita market page.