CurbScoop
CurbScoopBuildings215 CHRYSTIE STREET

215 CHRYSTIE STREET

Manhattan· built 2014class RMBBL 1004277507
Open listing source

215 CHRYSTIE STREET is an 11-unit building in Manhattan, built in 2014.

1 unit is on the market here right now.

City records show 23 DOB permits and 26 open violations on file.

Units (res)
11
Floors
28.0
Lot ft²
22,705 ft²
Bldg ft²
214,757 ft²
Assessed
$60.1M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
215 CHRYSTIE STREET #29W
Manhattan · built 2014
-$5.25M$2,6561,977 ft²2 bd · 2 ba-283
3 DOBbedbug
9.2Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Jun 13, 2025 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 31, 2023 · VIOLATION DISMISSED
DOB permits (last 30)
  • EQ-
    SPRING SCAFFOLDING LLC
  • NB-
    TRITON CONSTRUCTION CO.,
  • EQ-
    TRITON CONSTRUCTION CO.,
  • FO-
    TRITON CONSTRUCTION CO.,
  • FO-
    TRITON CONSTRUCTION CO.,
  • NB-
    TRITON CONSTRUCTION CO.,
  • NB-
    TRITON CONSTRUCTION CO.,
  • PL-
    DEMAR PLUMBING CORP
  • NB-
    TRITON CONSTRUCTION CO.,
  • PL-
    DEMAR PLUMBING CORP
  • PL-
    DEMAR PLUMBING CORP
  • PL-
    DEMAR PLUMBING CORP
  • NB-
    TRITON CONSTRUCTION CO.,
  • EQ-
    TRITON CONSTRUCTION CO.,
  • EQ-
    TRITON CONSTRUCTION CO.,
  • EQ-
    TRITON CONSTRUCTION CO.,
  • NB-
    TRITON CONSTRUCTION CO.,
  • FO-
    TRITON CONSTRUCTION CO.,
  • FO-
    TRITON CONSTRUCTION CO.,
  • OT-
    R.P.BRENNAN GENERAL.CONTR
  • OT-
    R.P.BRENNAN GENERAL.CONTR
  • EQ-
    TRITON CONSTRUCTION CO.,
  • NB-
    TRITON CONSTRUCTION CO.,
DOB violations
  • May 2, 2024BENCH-FAILURE TO BENCHMARK NONE
  • Feb 22, 2023FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Aug 2, 2021BENCH-FAILURE TO BENCHMARK NONE
  • Jun 2, 2021BENCH-FAILURE TO BENCHMARK NONE
  • May 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • May 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • May 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • May 28, 2021E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 19, 2020E-ELEVATOR ELEVATORREQUIRED
  • Feb 2, 2020BENCH-FAILURE TO BENCHMARK NONE
  • Nov 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • Aug 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • May 2, 2019BENCH-FAILURE TO BENCHMARK NONE
  • Feb 16, 2019BENCH-FAILURE TO BENCHMARK NONE
  • Jun 15, 2018E-ELEVATOR ELEVATORREQUIRED
  • Feb 21, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 21, 2018AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1004277507

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Sep 2, 2025

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
23 permits in the current corpus

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
2 violations in the current corpus · latest record Jul 11, 2025

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
24 violations in the current corpus · latest record Dec 8, 2025

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.