CurbScoop
CurbScoopBuildings53 HESTER STREET

53 HESTER STREET

Manhattan· built 2013class D3BBL 1003100035
Open listing source

53 HESTER STREET is a 10-unit building in Manhattan, built in 2013.

CurbScoop has 2 recorded sales on this tax lot, most recently $3.19M on Jan 23, 2013.

City records show 30 DOB permits and 22 open violations on file.

Units (res)
10
Floors
11.0
Lot ft²
2,188 ft²
Bldg ft²
15,376 ft²
Assessed
$2.53M
DOF total
Comps L5y
0

Transaction history (5)

Every recorded deed for this tax lot.

RecordedUnitTypePrice
Mar 4, 2013-DEED$3.19M
May 2, 2007-DEED$2.90M
Dec 1, 2004-DEED$0
Feb 12, 1999-DEED$0
Jan 7, 1970-DEED$0

Building risk + activity

HPD violations (last 40)
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Jun 16, 2025 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 17, 2024 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 15, 2023 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Mar 10, 2022 · VIOLATION DISMISSED
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Mar 10, 2022 · VIOLATION DISMISSED
  • A
    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
    Apr 20, 2021 · VIOLATION DISMISSED
DOB permits (last 30)
  • OTOct 6, 1993
    COSA DEVELOPMENT CORP
  • EQ-
    TRI-STATE CONTRACTING OF*
  • EQ-
    W & L GROUP CONSTRUCTION
  • MH-
    TEMP EAST,INC
  • AL-
    EUROPEANBUILDERS CONTR CORP
  • NB-
    R & S CONSTRUCTION OF NY
  • EQ-
    MILESTONE CONSTRUCTION C
  • NB-
    W & L GROUP CONSTRUCTION
  • EQ-
    TRI-STATE CONTRACTING OF*
  • NB-
    MILESTONE CONSTRUCTION C
  • OT-
    55C GROUP INC
  • EQ-
    R & S CONSTRUCTION OF NY
  • NB-
    R & S CONSTRUCTION OF NY
  • MH-
    R & S CONSTRUCTION OF NY
  • OT-
    R & S CONSTRUCTION OF NY
  • OT-
    R & S CONSTRUCTION OF NY
  • OT-
    R & S CONSTRUCTION OF NY
  • EQ-
    R & S CONSTRUCTION OF NY
  • NB-
    R & S CONSTRUCTION OF NY
  • EQ-
    55C GROUP INC
  • NB-
    55C GROUP INC
  • PL-
    ORION PLUMBING & HTG CORP
  • EQ-
    BTW PRO, INC.
  • DM-
    BTW PRO,INC
  • EQ-
    55C GROUP INC
  • NB-
    55C GROUP INC
  • OT-
    55C GROUP INC
  • EQ-
    SHUN FEI CORP
  • NB-
    SHUN FEI CORP
  • EQ-
    EDC CONCRETE & REBAR INC
DOB violations
  • Jun 26, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 25, 2019E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 2017E-ELEVATOR ELEVATORREQUIRED
  • Apr 21, 2016E-ELEVATOR ELEVATORREQUIRED
  • Oct 8, 2014AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 2, 2014AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jul 2, 2014AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 13, 2011LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 2, 2011C-CONSTRUCTION OTHER OPTIONAL
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Nov 6, 2007C-CONSTRUCTION OTHER OPTIONAL
  • Nov 5, 2007C-CONSTRUCTION OTHER OPTIONAL
  • Mar 19, 2003LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1003100035

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
0 active sale listings in the current corpus

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
5 recorded deeds in the current corpus · latest record Mar 4, 2013

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
45 permits in the current corpus · latest record Oct 6, 1993

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
6 violations in the current corpus · latest record Jul 7, 2025

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
16 violations in the current corpus · latest record Dec 16, 2022

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.