CurbScoop
CurbScoopBuildings259 EAST BROADWAY

259 EAST BROADWAY

Manhattan· built 1900class C7BBL 1002860021
Open listing source

259 EAST BROADWAY is a 15-unit building in Manhattan, built in 1900.

CurbScoop has 3 recorded sales on this tax lot, most recently $7.75M on Feb 9, 2026.

1 of those closed in the last five years, at a median of $7.75M.

City records show 30 DOB permits and 54 open violations on file.

Units (res)
15
Floors
6.0
Lot ft²
2,185 ft²
Bldg ft²
12,076 ft²
Assessed
$1.71M
DOF total
Comps L5y
1
median $7.75M

Transaction price trend

2 recorded transactions · prices over time

Transaction history (7)

Every recorded deed for this tax lot.

RecordedUnitTypePrice
Feb 18, 2026-DEED$7.75M
Jul 5, 2013-DEED$3.50M
Jul 3, 2007-DEED$1.65M
Jun 26, 2003-DEED$0
Mar 27, 1979-DEED$0
Jan 20, 1975-DEED$0
Jul 1, 1974-DEED$0

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR NOT SELF CLOSING IN THE ENTRANCE LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Feb 9, 2026 · #4A · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEIILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 20, 2024 · #3A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEIILING IN THE PRIVATE HALLWAY LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 20, 2024 · #3A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEIILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 20, 2024 · #3A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEIILING IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 20, 2024 · #3A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEIILING IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
    Feb 20, 2024 · #3A · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · VIOLATION DISMISSED
  • C
    § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AND FRAME IN THE ENTRANCE LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD WINDOW FRAME IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD WASHBASIN CABINET IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · VIOLATION DISMISSED
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER WINDOW SASHES IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH AND EAST WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: REFIT ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · VIOLATION DISMISSED
  • B
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL APPROX 6 SQ.FT AND EAST WALL APPROX 10 SQ.FT IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 24, 2023 · #6B · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM
    Jan 24, 2021 · VIOLATION DISMISSED
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 24, 2021 · #3A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
    Sep 9, 2020 · #5A · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 13, 2019 · #6B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
    Sep 13, 2019 · #2C · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPPING WOOD FLOOR IN THE FOYER LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 13, 2019 · #6B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH OF EAST WINDOW IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 13, 2019 · #6B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 13, 2019 · #6B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPPING FLOOR IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Sep 13, 2019 · #6B · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • A
    § 27-2005 ADM CODE REFIT THE DOOR AT THE LOWER CABINET, AT THE SINK IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 6, 2019 · #6A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE INTERIOR MORTAR JOINTS , AT EAST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 6, 2019 · #6A · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 6, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN SHOWER STALL IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 6, 2019 · #6A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 6, 2019 · #6A · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE INTERIOR MORTAR JOINTS, EAST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 6, 2019 · #6A · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Sep 6, 2019 · #6A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 2; IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 19, 2019 · #6B · VIOLATION DISMISSED
  • C
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, APARTMENT AT EAST
    Mar 6, 2019 · #5A · FIRST NO ACCESS TO RE- INSPECT VIOLATION
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 27, 2019 · #6B · VIOLATION DISMISSED
  • C
    HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
    Feb 27, 2019 · #6B · VIOLATION DISMISSED
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF GARBAGE CANS STORED AT PUBLIC HALL, 1st STORY
    Feb 27, 2019 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM IMPROPER SIGN AT PUBLIC HALL, 1st STORY
    Feb 27, 2019 · VIOLATION DISMISSED
DOB permits (last 30)
  • BLApr 10, 2014
    M.M.I. MECHANICAL, INC.
  • OT-
    EMPIRE ECS, LLC
  • PL-
    ORBIT PLBG & HTG INC
  • BL-
    METRO FUEL OIL CORP
  • FB-
    METRO FUEL OIL CORP
  • OT-
    PELHAM BAY CONSTRUCTION L
  • PL-
    PLUMBING NYC INC
  • OT-
    PELHAM BAY CONSTRUCTION L
  • PL-
    EXPRESS PLBG SEWR AND WTR
  • EQ-
    ADELPHI RESTORATION CORP
  • OT-
    ADELPHI RESTORATION CORP
  • OT-
    PELHAM BAY CONSTRUCTION L
  • OT-
    ADELPHI RESTORATION CORP
  • PL-
    CROSSFIELD PLBG & HTG COR
  • FB-
    M.M.I. MECHANICAL, INC.
  • BL-
    M.M.I. MECHANICAL, INC.
  • PL-
    NEW ERA MECHANICAL SER IN
  • OT-
    TRIDENT RESTORATION INC
  • OT-
    PELHAM BAY CONSTRUCTION L
  • PL-
    ORBIT PLBG & HTG INC
  • FP-
    NEW YORK BUSINESS FIRE SYSTEM IN
  • PL-
    THE BIG IC LLC
  • PL-
    KOFSKY & SON, INC
  • PL-
    KOFSKY & SON, INC
  • PL-
    COBOT PLUMBING AND HEATIN
  • PL-
    CROSSFIELD PLBG & HTG COR
  • OT-
    MAN KEE CONST.INC.
  • OT-
    FUNICI ENTERPRISES INC
  • EQ-
    FUNICI ENTERPRISES INC
  • OT-
    EMPIRE ECS, LLC
DOB violations
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Aug 10, 2011AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jan 31, 2005LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 27, 2001LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 7, 2000LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 16, 1999LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • May 4, 1998LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 10, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1994LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 18, 1993LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 15, 1990ES-ELECTRIC SIGNS NONE

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1002860021

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
0 active sale listings in the current corpus

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
7 recorded deeds in the current corpus · latest record Feb 18, 2026

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
43 permits in the current corpus · latest record Apr 10, 2014

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
283 violations in the current corpus · latest record Apr 29, 2026

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
14 violations in the current corpus · latest record Feb 1, 2019

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.