CurbScoop
DealsManhattan111 DIVISION STREET

111 DIVISION STREET

Manhattan· built 1920class D7BBL 1002830094
Open listing source
Units (res)
18
Floors
5.0
Lot ft²
4,075 ft²
Bldg ft²
17,895 ft²
Assessed
$1.14M
DOF total
Comps L5y
0

Transaction history (8)

Every recorded deed for this tax lot.

RecordedUnitTypePrice
Dec 22, 2015-DEED$0
Oct 6, 1994-DEED$0
Jan 7, 1986-DEED$0
Oct 29, 1979-DEED$0
Aug 30, 1971-DEED$0
Sep 6, 1967-DEED$0
Sep 6, 1967-DEED$0
Sep 6, 1967-DEED$0

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT D3, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
    Nov 27, 2020 · #D3 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT PUBLIC HALL, 1st STORY
    Nov 27, 2020 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BASEMENT DOOR LOCKED AT BOILER ROOM
    Nov 9, 2020 · VIOLATION CLOSED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
    Nov 9, 2020 · #4B · VIOLATION CLOSED
  • A
    § 27-2049 ADM CODE POST AND MAINTAIN A STREET NUMBER ON THE FRONT OF THE DWELLING PLAINLY VISIBLE FROM THE SIDEWALK. AT FRONT AREAWAY, 1st STORY
    Nov 9, 2020 · VIOLATION DISMISSED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Nov 28, 2018 · #D1 · VIOLATION CLOSED
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM AT BOILER ROOM DOOR AT BASEMENT
    Nov 28, 2018 · VIOLATION DISMISSED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT B2, 2nd STORY
    Jun 7, 2018 · #B2 · VIOLATION DISMISSED
  • B
    § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE THE OBSTRUCTION IN FIREPROOF PASSAGEWAY CONSISTING OF PADLOCK ON GATE AT FRONT SOUTH AT 1st FRONT AREAWAY FROM NORTH AT EAST
    Oct 31, 2016 · VIOLATION DISMISSED
DOB permits (last 30)
  • OTJan 4, 1995
    HOWARD CHIN
  • AL-
    HOWARD CHIN
  • OT-
    HONGTAI CONSTRUCTION INC
  • OT-
    HAO YUN CONSTRUCTION INC
  • PL-
    TRI STATE PLBG & HTG INC
  • OT-
    HAO YUN CONSTRUCTION INC
  • PL-
    RRP PLUMBING CORP
  • EQ-
    SPRING SCAFF.
  • EQ-
    NEW HO XIN DEVELOPMENT IN
  • OT-
    NEW HO XIN DEVELOPMENT IN
  • OT-
    NEW HO XIN DEVELOPMENT IN
  • OT-
    HOWARD CHIN
  • MH-
    SKC CONSTRUCTION
  • BL-
    M. ESPOSITO
  • PL-
    M. ESPOSITO
  • OT-
    NEW HO XIN DEVELOPMENT IN
  • OT-
    NEW HO XIN DEVELOPMENT IN
  • PL-
    KIN CHI PLG & HTG CORP
  • PL-
    HP SERVICES INC
  • OT-
    TYME CONSTRUCTION CORP
  • PL-
    HP SERVICES INC
  • OT-
    HOWARD CHIN
  • OT-
    SKC CONSTRUCTION