CurbScoop
DealsManhattan89 EAST BROADWAY

89 EAST BROADWAY

Manhattan· built 1910class K4BBL 1002820032
Open listing source
Units (res)
0
Floors
5.0
Lot ft²
2,250 ft²
Bldg ft²
9,218 ft²
Assessed
$474K
DOF total
Comps L5y
0

Transaction history (4)

Every recorded deed for this tax lot.

RecordedUnitTypePrice
May 5, 1976-DEED$0
May 5, 1976-DEED$0
Nov 6, 1968-DEED$0
Mar 1, 1968-DEED$0

Building risk + activity

HPD violations (last 40)
  • A
    § 27-2098 ADM CODE FILE WITH THIS DEPARTMENT A REGISTRATION STATEMENT FOR BUILDING.
    Sep 5, 2025 · NOV SENT OUT
  • A
    § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
    Sep 5, 2025 · NOV SENT OUT
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM THAT IS MISSING AT PUBLIC HALL, 1st STORY
    Sep 5, 2025 · NOV SENT OUT
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Sep 5, 2025 · NOV SENT OUT
  • A
    §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX THAT IS MISSING AT PUBLIC HALL, 1st STORY
    Sep 5, 2025 · NOV SENT OUT
  • A
    §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS THAT IS MISSING
    Sep 5, 2025 · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
    Sep 5, 2025 · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR THAT IS MISSING AT PUBLIC HALL, 1st STORY
    Sep 5, 2025 · NOV SENT OUT
DOB permits (last 30)
  • FP-
    NEW YORK BUSINESS FIRE SUPPRESS
  • OT-
    NEW HO XIN DEVELOPMENT
  • OT-
    N/A
  • OT-
    HENRYSMITH PROPERTY MGT
  • OT-
    RIVINGTON CONTRACTING INC
  • FP-
    ALFRED C COLLINS
  • OT-
    KING'S USA GROUP INC
  • PL-
    QMB PLUMBING & HEATING IN
  • FP-
    NY FIRE LLC