CurbScoop
CurbScoopBuildings123 MULBERRY STREET

123 MULBERRY STREET

Manhattan· built 1910class S5BBL 1002060017
Open listing source

123 MULBERRY STREET is a 6-unit building in Manhattan, built in 1910.

CurbScoop has 2 recorded sales on this tax lot, most recently $12.3M on Sep 18, 2015.

City records show 13 DOB permits and 75 open violations on file.

Units (res)
6
Floors
4.0
Lot ft²
2,150 ft²
Bldg ft²
7,434 ft²
Assessed
$1.15M
DOF total
Comps L5y
0

Transaction price trend

2 recorded transactions · prices over time

Transaction history (6)

Every recorded deed for this tax lot.

RecordedUnitTypePrice
Oct 14, 2015-DEED$12.3M
Jan 16, 2013-DEED$9.75M
Apr 20, 2007-DEED$0
Oct 1, 1985-DEED$0
Feb 28, 1969-DEED$0
Jun 26, 1968-DEED$0

Building risk + activity

HPD violations (last 40)
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN CLOSET AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 9, 2024 · #2N · NOV SENT OUT
  • C
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 9, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK AT DOOR LEADING TO FIRE ESCAPE IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 9, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL AND CEILING IN CLOSET AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 9, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 9, 2024 · #2N · NOV SENT OUT
  • A
    § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER SASHES AT 1ST WINDOW FROM WEST IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • A
    § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER WINDOW SASHES IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WALL CABINETS AT EAST WALL IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • A
    § 27-2005 HMC: REFIT THE CLOSET DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND COUNTERTOP IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • A
    § 27-2005 HMC: REFIT THE ENTRANCE DOOR IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 2nd ROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • A
    § 27-2005 HMC: REFIT THE ENTRANCE DOOR IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • A
    § 27-2005 HMC: REFIT THE ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER AND LOWER WINDOW SASHES IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.
    Jun 11, 2024 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
    Jun 11, 2024 · #2N · NOV SENT OUT
  • C
    § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 8, 2023 · #6 · VIOLATION CLOSED
  • C
    § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
    Dec 1, 2023 · #6 · NOV SENT OUT
  • C
    § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 5, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
    Dec 1, 2023 · #5 · VIOLATION CLOSED
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 6, 2023 · #2 · VIOLATION DISMISSED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 6, 2023 · #2 · VIOLATION CLOSED
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE FOYER LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 6, 2023 · #2 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 6, 2023 · #2 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BALANCES AT UPPER AND LOWER WINDOW SASHES AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 6, 2023 · #2 · NOV SENT OUT
  • A
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQ FT AT CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 6, 2023 · #2 · VIOLATION DISMISSED
  • B
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 6, 2023 · #2 · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
    Mar 6, 2023 · #2 · NOV SENT OUT
DOB permits (last 30)
  • OT-
    FUTURE RESTORATION INC
  • FP-
    ALL-BORO FIRE&SAF EQ CO I
  • PL-
    J. CAIAZZO PLBG & HTG COR
  • FP-
    IDEAL FIRE CONTROL INC
  • PL-
    J. CAIAZZO PLBG & HTG COR
  • PL-
    DEMAR PLBG CORP
  • BL-
    DEMAR PLBG CORP
  • FP-
    ALL-BORO FIRE&SAF EQ CO I
  • FP-
    CHIEF FIRE PREVENTION AND FILTER
  • OT-
    FUTURE RESTORATION INC
  • FP-
    CHIEF FIRE PREV MECH. CORP
  • OT-
    FUTURE RESTORATION INC
  • OT-
    VARDO CONSTRUCTION CORP
DOB violations
  • Nov 14, 2025LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 20, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Apr 25, 2023LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jul 21, 2021AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 2, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 19, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Feb 19, 2020AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Dec 11, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Nov 8, 2019LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jun 5, 2019C-CONSTRUCTION OTHER OPTIONAL
  • Jun 3, 2019C-CONSTRUCTION OTHER OPTIONAL
  • Jun 3, 2019C-CONSTRUCTION OTHER OPTIONAL
  • Jun 3, 2019C-CONSTRUCTION OTHER OPTIONAL
  • Jun 3, 2019C-CONSTRUCTION OTHER OPTIONAL
  • Apr 6, 2018LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Dec 31, 2009LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 1, 2009LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Jan 3, 2008LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Mar 26, 2002LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 27, 2001LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • May 4, 1998LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • May 4, 1998LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • May 4, 1998LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Sep 16, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 10, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Feb 10, 1997LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
  • Aug 29, 1995LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED

More buildings on this block

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 11, 2026

Stable property ID: nyc:bbl:1002060017

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
0 active sale listings in the current corpus

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
6 recorded deeds in the current corpus · latest record Oct 14, 2015

Pipeline completed Sep 11, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
13 permits in the current corpus

Pipeline completed Sep 11, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
98 violations in the current corpus · latest record Dec 10, 2024

Pipeline completed Sep 11, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
35 violations in the current corpus · latest record Nov 14, 2025

Pipeline completed Sep 11, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL.