CurbScoop
CurbScoopBuildingsTribeca395 BROADWAY

395 BROADWAY

Manhattan· Tribeca· built 1901class RMBBL 1001937501
Open listing source

395 BROADWAY is a 63-unit building in Tribeca, Manhattan, built in 1901.

1 unit is on the market here right now.

City records show 30 DOB permits and 57 open violations on file.

Units (res)
63
Floors
15.0
Lot ft²
7,625 ft²
Bldg ft²
84,225 ft²
Assessed
$18.9M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
395 BROADWAY #3B
Manhattan · built 1901
Tribeca$2.00M$1,8951,053 ft²1 bd · 2 ba-43
4 HPD-C11 DOBbedbug
19.9Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • C
    § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 6, 2023 · #10D · NOV SENT OUT
  • A
    § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORY
    Jul 6, 2023 · VIOLATION DISMISSED
  • A
    § 27-2005 HMC: REFIT LOWER SASH WEST WINDOWS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 6, 2023 · #10D · NOV SENT OUT
  • B
    § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 6, 2023 · #10D · NOV SENT OUT
  • A
    § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORY
    Jul 6, 2023 · VIOLATION DISMISSED
  • C
    § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL, 1st STORY
    Jul 6, 2023 · NOV SENT OUT
  • B
    § 27-2045, 2046 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS AT PUBLIC HALL, 1st STORY
    Jul 6, 2023 · VIOLATION DISMISSED
  • A
    § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.
    Jul 6, 2023 · VIOLATION DISMISSED
  • A
    § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
    Jul 6, 2023 · VIOLATION DISMISSED
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD., 1st STORY
    Jul 6, 2023 · VIOLATION DISMISSED
  • B
    § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jul 6, 2023 · #10D · NOV SENT OUT
  • C
    § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR TO THE BOILER ROOM LOCKED AT BOILER ROOM
    Jan 26, 2023 · NOT COMPLIED WITH
  • C
    § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM EAST LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 26, 2023 · #10D · VIOLATION CLOSED
  • A
    § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULK AROUND SHOWER STALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 26, 2023 · #10D · NOV SENT OUT
  • B
    § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET LEAKING BETWEEN WATER TANK AND TOILET BOWL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 26, 2023 · #10D · NOV SENT OUT
  • B
    § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE ON LOWER WINDOW SASH AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 10D, 10th STORY, 1st APARTMENT FROM WEST AT NORTH
    Jan 26, 2023 · #10D · NOV SENT OUT
  • I
    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
    Nov 6, 2017 · VIOLATION DISMISSED
DOB permits (last 30)
  • EQMar 9, 2015
    BILLY ENTERPRISES INC
  • PLNov 15, 2013
    K.O.S. PLUMBING&HEATING,I
  • PLOct 10, 2007
    Q.M.B. PLUMBIN/HEATING INC.
  • PLDec 24, 2001
    DBA BHI, INC
  • OTJan 12, 2001
    WEST NY REST. INC.
  • ALFeb 20, 1991
    CAMPBELL/CANTER INC
  • EQ-
    COLGATE SCAFFOLDING
  • MH-
    MAXI CONSTRUCTION CORP
  • OT-
    ROSS LEE RENOVATIONS INC
  • PL-
    TOP PLUMBING GROUP,INC
  • PL-
    PLUMBING & HTG DOCTOR INC
  • OT-
    THE EDGE CONSTRUCTION RENOVATI
  • AL-
    CAMPBELL/CANTER INC
  • EQ-
    SPRING ENTERPRIS INC.
  • OT-
    360 GENERAL CONTRACTING I
  • OT-
    MAXI CONSTRUCTION CORP
  • PL-
    ADAMJOHN & SONS CORP
  • PL-
    PSI MECH.
  • OT-
    EUDA CONSTRUCTION AND DES
  • EQ-
    BILLY ENTERPRISES INC
  • OT-
    ALCHEMY TRANS.
  • OT-
    EAST COAST RESTORATION &
  • PL-
    CROSSFIELD PLBG & HTG COR
  • MH-
    EAST COAT RESTORATION CONULTG CO
  • OT-
    ARTLAND CONSTRUCTION
  • OT-
    E.C. RESTORATION & CONSUL
  • PL-
    A.M.N. CORPORATION
  • PL-
    MAGOR_ PLUMBING & HTG
  • EQ-
    BILLY ENTERPRISES INC
  • PL-
    R.J.C. MECH CORP
DOB violations
  • Sep 17, 2023E-ELEVATOR ELEVATORREQUIRED
  • Sep 17, 2023E-ELEVATOR ELEVATORREQUIRED
  • Aug 2, 2022BENCH-FAILURE TO BENCHMARK NONE
  • Jun 29, 2020EARCX-FAILURE TO SUBMIT EER NONE
  • Apr 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • Apr 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • Apr 7, 2020E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2020FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
  • Mar 27, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 18, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 17, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 16, 2019EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 19, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 19, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 10, 2017E-ELEVATOR ELEVATORREQUIRED
  • Jan 25, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Jun 1, 2016EARCX-FAILURE TO SUBMIT EER NONE
  • May 13, 2016EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 1, 2016E-ELEVATOR ELEVATORREQUIRED
  • Mar 1, 2016E-ELEVATOR ELEVATORREQUIRED
  • Jun 1, 2015EARCX-FAILURE TO SUBMIT EER NONE
  • Feb 25, 2015E-ELEVATOR ELEVATORREQUIRED
  • Feb 25, 2015E-ELEVATOR ELEVATORREQUIRED
  • Dec 31, 2013EARCX-FAILURE TO SUBMIT EER NONE
  • Dec 31, 2013FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
  • Feb 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • Feb 14, 2013E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 2012E-ELEVATOR ELEVATORREQUIRED
  • Jan 12, 2012E-ELEVATOR ELEVATORREQUIRED
  • Oct 28, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 28, 2010E-ELEVATOR ELEVATORREQUIRED
  • Feb 25, 2010E-ELEVATOR ELEVATORREQUIRED
  • Feb 25, 2010E-ELEVATOR ELEVATORREQUIRED
  • Feb 25, 2010E-ELEVATOR ELEVATORREQUIRED
  • Oct 22, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2008E-ELEVATOR ELEVATORREQUIRED
  • Jan 24, 2008E-ELEVATOR ELEVATORREQUIRED
  • Feb 21, 2007E-ELEVATOR ELEVATORREQUIRED
  • Sep 23, 2004E-ELEVATOR ELEVATORREQUIRED

More buildings in Tribeca

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 12, 2026

Stable property ID: nyc:bbl:1001937501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 6, 2026

Pipeline completed Sep 6, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
1 active sale listing in the current corpus · latest record Apr 29, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 12, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
141 permits in the current corpus · latest record Mar 9, 2015

Pipeline completed Sep 12, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
17 violations in the current corpus · latest record Nov 1, 2023

Pipeline completed Sep 12, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
43 violations in the current corpus · latest record Sep 17, 2023

Pipeline completed Sep 12, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Tribeca market page.