CurbScoop
DealsManhattan1 DOYERS STREET

1 DOYERS STREET

Manhattan· built 1915class S3BBL 1001620133
Open listing source
Units (res)
3
Floors
4.0
Lot ft²
626 ft²
Bldg ft²
2,870 ft²
Assessed
$561K
DOF total
Comps L5y
0

Transaction history (7)

Every recorded deed for this tax lot.

RecordedUnitTypePrice
Mar 11, 2010-DEED$0
Aug 14, 2009-DEED$0
Aug 3, 1998-DEED$0
Oct 16, 1996-DEED$0
Oct 13, 1995-DEED$0
Feb 24, 1995-DEED$0
Jun 19, 1984-DEED$0

Building risk + activity

HPD violations (last 40)
  • B
    SECTION 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN SINK IN THE KITCHEN LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 28, 2008 · #3 · CIV14 MAILED
  • B
    SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN CASINGS AT BOTH WINDOWS ON NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 28, 2008 · #3 · CIV14 MAILED
  • B
    SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR KNOB IN THE ENTRANCE LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 28, 2008 · #3 · CIV14 MAILED
  • B
    SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING & WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 28, 2008 · #3 · CIV14 MAILED
  • B
    SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 28, 2008 · #3 · CIV14 MAILED
  • A
    SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK, IN THE ENTRANCE LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 23, 2008 · #3 · NOV CERTIFIED LATE
  • A
    SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST AND NORTH WALL IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 23, 2008 · #3 · NOV CERTIFIED LATE
  • A
    SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 23, 2008 · #3 · NOV CERTIFIED LATE
  • A
    SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE 3rd ROOM FROM EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
    Jan 23, 2008 · #3 · NOV CERTIFIED LATE
DOB permits (last 30)
  • PLDec 27, 1995
    MAGOR PLUMBING HEATING
  • FPNov 21, 1995
    P.S.S. OF NEW YORK INC.
  • FPJul 31, 1990
    IDEAL FIRE CONTROL INC
  • OT-
    CHAND CONSTRUCITON CORP
  • PL-
    CRU MECHANICAL AND HEATING
  • PL-
    ADCO PLUMBING & HEATING
  • FP-
    IDEAL FIRE CONTROL INC
  • MH-
    CHINA ARTS CONST INC
  • PL-
    V.I.S. INDUSTRIES
  • OT-
    VIS INDUSTRIES
  • MH-
    VIS INDUSTRIES
  • OT-
    KING'S ASSOCIATES, INC
  • OT-
    LST CONSTR. CO.
  • MH-
    GRACELAND DESIGN BLD ASSOCIATES
  • EQ-
    OUTDOOR INSTALLATION LLC
  • EQ-
    OUTDOOR INSTALLATION LLC
  • OT-
    LST CONST. CO
  • FP-
    P.S.S. OF NEW YORK INC.
  • PL-
    MAGOR PLUMBING HEATING
  • PL-
    MAGOR PLUMBING HEATING
  • MH-
    LST CONSTR. CO.
  • PL-
    QUEENS MAINTENANCE CO INC
  • FP-
    N.Y BUSINESS FIRE SYS INC