CurbScoop
DealsManhattan52 THOMAS STREET

52 THOMAS STREET

Manhattan· Tribeca· built 1928class RMBBL 1001477508
Open listing source
Units (res)
20
Floors
7.0
Lot ft²
8,797 ft²
Bldg ft²
47,441 ft²
Assessed
$8.21M
DOF total
Comps L5y
0

Active sale listings (1)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
52 THOMAS STREET #2A
Manhattan · built 1928
Tribeca$3.25M-0 ft²3 bd · 2 ba-35
3 HPD-Cbedbug
11.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
  • A
    § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
    Jul 26, 2016 · VIOLATION CLOSED
  • C
    § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE 1st ROOM FROM EAST LOCATED AT APT ENT, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 5, 2016 · #ENT · VIOLATION DISMISSED
  • C
    § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT ENT, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 5, 2016 · #ENT · VIOLATION DISMISSED
  • C
    § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 1st ROOM FROM EAST LOCATED AT APT ENT, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
    Apr 5, 2016 · #ENT · VIOLATION DISMISSED
DOB permits (last 30)
  • PLDec 13, 2016
    TOP PLUMBING GROUP,INC
  • PL-
    CASE PLUMBING LLC
  • MH-
    K&C BROTHERS CONSTRUCTION
  • BL-
    CASE PLUMBING LLC
  • EQ-
    K&C BROTHERS CONSTRUCTION
  • OT-
    HIGH QUALITY CONSTRUCTION
  • MH-
    HIGH QUALITY CONSTRUCTION
  • PL-
    ADVANCED PIPING SERVICES
  • FP-
    NY FIRE LLC
  • PL-
    PLUMBSPAN INSTALLATIONS I
  • PL-
    PLUMBSPAN INSTALLATIONS I
  • OT-
    POLOM CORP
  • OT-
    NEW GENERATION CONSTRUCTI
  • BL-
    COSME PLBG & HTG CORP
  • OT-
    SR DELCO C.S.M., INC
  • OT-
    CREATIVE CONCEPTS FIRST I
  • MH-
    CREATIVE CONCEPTS FIRST I
  • OT-
    NEW GENERATION IRON
  • OT-
    NEW GENERATION IRON
  • EQ-
    K&C BROTHERS CONSTRUCTION
  • OT-
    K&C BROTHERS CONSTRUCTION
  • MH-
    K&C BROTHERS CONSTRUCTION
  • OT-
    POLOM CORP
  • PL-
    COSME PLBG & HTG CORP
  • BL-
    COSME PLBG & HTG CORP
  • PL-
    COSME PLBG & HTG CORP
  • OT-
    BRISTOL CONTRACTING & DES
  • PL-
    UNIQUE PLUMBING & HTG COR
  • OT-
    CA CONSTRUCTION NY INC
  • PL-
    R.J.C. MECH CORP