CurbScoop
CurbScoopBuildingsTribeca233 BROADWAY

233 BROADWAY

Manhattan· Tribeca· built 1913class RMBBL 1001237501landmark
Open listing source

233 BROADWAY is a 31-unit building in Tribeca, Manhattan, built in 1913.

2 units are on the market here right now.

City records show 30 DOB permits and 40 open violations on file.

Units (res)
31
Floors
60.5
Lot ft²
29,411 ft²
Bldg ft²
880,371 ft²
Assessed
$100.2M
DOF total
Comps L5y
0

Active sale listings (2)

AddressNeighborhoodPrice$/ft²SqftBeds/Bathsvs compDOMRiskScore
2 PARK PLACE #40A
Manhattan · built 1913
Tribeca$19.5M$3,1996,095 ft²4 bd · 4 ba-93
28 DOBbedbug
34.1Source
2 PARK PLACE #35A
Manhattan · built 1913
Tribeca$7.50M$2,2853,282 ft²3 bd · 3 ba-276
28 DOBbedbug
34.1Source

Transaction history (0)

Every recorded deed for this tax lot.

No recorded transactions for this BBL yet.

Building risk + activity

HPD violations (last 40)
None.
DOB permits (last 30)
  • OTMar 16, 2016
    CNY CONSTRUCTION LLC
  • MH-
    SPK/LEWIS INC
  • OT-
    CAMMEBY'S MANAGEMENT CO.L
  • MH-
    ON-TRAC CONSTRUCTION ASSO
  • OT-
    D AND A INTERIORS CORPORA
  • MH-
    D AND A INTERIORS CORPORA
  • PL-
    JAM SEWER CLEANING SVC
  • EQ-
    SPRING SCAFFOLDING LLC
  • PL-
    DUNHAM PIPING & HTG CORP
  • SP-
    ASHLAR MECHANICAL CORP
  • EQ-
    SPRING SCAFFOLDING LLC
  • SP-
    D&S SPRINKLER SYSTEMS INC
  • SP-
    SAFETY FIRE SPRINKLER COR
  • SP-
    SAFETY FIRE SPRINKLER COR
  • OT-
    ON-TRAC CONSTRUCTION ASSO
  • MH-
    CAMMEBY'S MANAGEMENT CO.L
  • SP-
    SAFETY FIRE SPRINKLER COR
  • SP-
    ASHLAR MECHANICAL CORP
  • PL-
    ACCESS PLUMBING CORP
  • OT-
    CHAMP CONSTRUCTION CORP
  • OT-
    ON-TRAC CONSTRUCTION ASSO
  • OT-
    ON-TRAC CONSTRUCTION ASSO
  • MH-
    ON-TRAC CONSTRUCTION ASSO
  • SP-
    STARLITE PLBG & HTG CORP
  • SP-
    STARLITE PLBG & HTG CORP
  • PL-
    ACCESS PLUMBING CORP
  • OT-
    NOHO CONSTRUCTION LLC
  • MH-
    NOHO CONSTRUCTION LLC
  • OT-
    NOHO CONSTRUCTION LLC
  • OT-
    SPK/LEWIS INC
DOB violations
  • Aug 1, 2024FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED
  • Apr 1, 2024EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Feb 21, 2024FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
  • Aug 16, 2023EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
  • Apr 22, 2023EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 20, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 19, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 18, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Jun 17, 2021EARCX-FAILURE TO SUBMIT EER NONE
  • Mar 3, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 3, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 3, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 3, 2020E-ELEVATOR ELEVATORREQUIRED
  • Mar 3, 2020E-ELEVATOR ELEVATORREQUIRED
  • May 29, 2019AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Mar 7, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 7, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 2019E-ELEVATOR ELEVATORREQUIRED
  • Mar 6, 2019E-ELEVATOR ELEVATORREQUIRED
  • Nov 27, 2018C-CONSTRUCTION OTHER OPTIONAL
  • Nov 27, 2018C-CONSTRUCTION OTHER OPTIONAL
  • Apr 24, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Mar 5, 2018E-ELEVATOR ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Jan 26, 2018ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
  • Dec 27, 2017AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
  • Sep 25, 2017C-CONSTRUCTION OTHER OPTIONAL
  • Sep 15, 2017EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Sep 15, 2017EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Sep 15, 2017EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED
  • Aug 25, 2017C-CONSTRUCTION OTHER OPTIONAL
  • Feb 16, 2017EARCX-FAILURE TO SUBMIT EER NONE
  • Jan 3, 2017ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED

More buildings in Tribeca

Sources & freshness

Research contract nyc_property_research.v1 · snapshot Sep 23, 2026

Stable property ID: nyc:bbl:1001237501

This identifier represents an NYC tax lot. Condo and co-op apartment identity must be resolved separately.

Tax lot and building facts

NYC Department of City Planning (PLUTO)

completed
1 tax-lot record in the current corpus · latest record Sep 20, 2026

Pipeline completed Sep 20, 2026

The current PLUTO pipeline is configured for Manhattan and Brooklyn.

PLUTO describes the tax lot and buildings, not legal ownership of an individual apartment.

Marketed sale listings

StreetEasy, observed by CurbScoop

completed
2 active sale listings in the current corpus · latest record Apr 29, 2026

Pipeline completed Aug 31, 2026

The current sales-listing pipeline is configured for Manhattan and Brooklyn.

Listing observations describe marketed state and are not proof of a closing or exhaustive market coverage.

Recorded transfers

NYC Department of Finance, Office of the City Register (ACRIS)

completed
0 recorded deeds in the current corpus

Pipeline completed Sep 23, 2026

Deed document types associated with this BBL in the current CurbScoop corpus.

Recording can lag a transaction, and a deed with no stated consideration is not evidence of a market sale.

DOB permits

NYC Department of Buildings via NYC Open Data

completed
293 permits in the current corpus · latest record Mar 16, 2016

Pipeline completed Sep 23, 2026

The current DOB permit pipeline is configured for Manhattan and Brooklyn.

A filing or permit does not prove that work was completed or that all work at the property was filed.

HPD violations

NYC Department of Housing Preservation and Development via NYC Open Data

completed
0 violations in the current corpus

Pipeline completed Sep 23, 2026

The current HPD violation pipeline is configured for Manhattan and Brooklyn.

Status and correction timing come from the published agency record and may change after CurbScoop observes it.

DOB violations

NYC Department of Buildings via NYC Open Data

completed
180 violations in the current corpus · latest record Aug 1, 2024

Pipeline completed Sep 23, 2026

The current DOB violation pipeline is configured for Manhattan and Brooklyn.

Absence from the current corpus is not proof that a building has no regulatory issue.

Counts and dates describe the current CurbScoop corpus. They are not a guarantee of exhaustive agency or listing coverage.

Reading these records

The transaction history above comes from ACRIS, the city's register of recorded deeds - it shows what actually closed, not what was asked. To compare that against what similar units are listed at, see how to find comps and asking price vs sale price. The BBL identifying this lot is explained in what is a BBL. Wider context for the area is on the Tribeca market page.